October 9, 2017
Hi all,
Thanks to all meeting’s attendants!
Here is the meeting’s summary:
We reviewed the status and needs of R1 vVoLTE and R-vCPE use cases. It was reported by Yang (vVoLTE team) that vendor’s validation tools are lacking and this delays progress. AI (Alla, Yang) – to check what tools implementation proposals are missing from R2 non-functional requirements proposals and include those
We reviewed 5G requirements status, presented by Vimal and members of 5G task force
RAN deployment and Optimization – some requirements for a specific projects will be extracted from the list, and discussed as a proposals with a relevant projects, while the full use cases implementation will not be targeted by Beijing release
Network slicing – team will bring the next level of details i.e. proposal what should be done per each one of the potentially affected projects in 2 weeks from now. Next week we will get an update. We will target discussion with a different projects/architecture/modelling subcommittees in a 2 weeks from now. AI(Vimal – to progress work, Alla – to arrange meeting, once indication on the list of affected projects is in place)
We discussed Ramesh’s proposal on External Controller implementation. AI (Ramesh – generalize description to apply to any external controller, Alla – schedule meeting with involved projects for the next week)
Bharath presented resiliency requirements. AI (Bharath will work with Jason on mapping those requirements to the list of “Enterprise-grade” levels we build currently).
I re-attach the list of prioritized functional requirements that we have as an output from f2f meeting (also available on wiki) and encourage you to extend your favorite requirements definition, as we are getting close to the Beijing Release scope’s approval, while we need more extended description of the requirements to be able to proceed J
Best regards,
Alla Goldner
Open Network Division
Amdocs Technology