07-23-2018 VF-C Weekly Meeting

Agenda:

  1. Istio Introduction (MSB PTL Huabing)

  2. Clarification on SOL 003 Interface work ( Viswa )

  3. M2 checklist review

 

 

Attendees:

Bharath, Aditya, haibin huang, hanyanan, jinhua, maopeng, ruoyu ying, shobana, victor, yunlong, Burlyluo

Recording:

Minutes:

  1. Istio Introduction 
    a. Huabing introduced Istio  service Mesh and its features 
    b. S3PSecurity Requirements and how Istio address S3P Security requirement

  2. Clarification on SOL003 Interface work 
    Viswa didn't attend vfc meeting due to other unplanned urgent meeting, will discuss offline. 

  3. M2 checklist  review 
    Team reviewed the VF-C Casablanca M2 Deliverables for Functionality Freeze Milestone Checklist Template and fund the work that need to be done before this Thursday.
     Including: sonar code coverage, failure jenkins jobs, R3 test cases , JIRA status 

Action:

  1. SOL003 interface work will be discussed offline. Yan will organize a meeting, participants?Yan, viswa, aditya,maopeng 

  2. Discuss more details with Huabing about how vfc integrates with Istio

  3. M2 related work that need to be done before this Thursday
    a. sonar code coverage:
    lcm : jinhua 
    huawei-vnfm-driver: victor
    b.jenkins job:

    vfc-nfvo-wfengine-master-csit-sanity-check : zhaoxing

    vfc-nfvo-driver-vnfm-svnfm-master-csit-sanity-check:  jinhua

    vfc-nfvo-multivimproxy-master-docker-java-version-shell-daily: victor

    vfc-nfvo-driver-svnfm-nokiav2-docker-vnfm-nokiav2-master-verify-docker-cascade-trigger: Denes

    vfc-nfvo-catalog-sonar: yunlong

    vfc-gvnfm-vnflcm-lcm-sonar: yunlong

    c. Check JIRA status:Yan