08-21-2017 VF-C Weekly Meeting
Attendees:
Ritusood,han yanan,maopeng,jinhua,Shashank,Victor Gao,Xinhui Li,Yan Yang,Lingli,Yunlong
Agenda:
summarize the recent work and give some feedback to the team
check M2 and M3 checklist
other discussion
Minutes:
Yan summarized some work process about VF-C
API reviewed by Architecture Committee.
Work design and execution discussion feedbackVictor showed the A&AI schema changes from VF-C perspective
confirmed with xinhui, the host and vm relationship will be maintained by VF-C team.
Victor said the schema changes are being verified,but the environment still has some problems.But Yan suggests Victor should first commit to A&AI team to review.Maopeng introduced the remaining issues discussed with SDC team.Summarized these issues.
Team reviewed the M2 and M3 checklist status and updated the M2 item status according to the feedback
Yan showed the collected components M2 checklist status,there are still there components need to finish the remaining items.
Yan updated the M2 checklist.
Team looked through the M3 checkpoint and suggested team need to finished the related job before Aug,24.Discussed with xinhui and Ritu about the policy trigger parameter passed to VF-C.
Action:
Weitao will submit the schema changes to A&AI to review.
Maopeng will send David the remaining issues to make sure all the remaining issues will be discussed in this week's SDC meeting,all the problems should be resolved before Thursday.
Yan will update the M3 JIRA checkpoint.
Jinhua will resolve the jenkins job execution problem about catalog.
Yan will contact xiaodong.guirong and laomeng to comfirm the ems-driver and wfengine M2 status.
Yan will track communtiy discussion about the tutorial for the docker image making
Ritu will following the VF-C actor parameter problems in this weekly's policy meeting