LOG Meeting Minutes 2018-06-05
Notes
@Michael O'Brien on Arch call for Logging scope change for POMBA - https://lists.onap.org/pipermail/onap-discuss/2018-May/010018.html
JIRA board - https://jira.onap.org/secure/RapidBoard.jspa?rapidView=53&view=planning&selectedIssue=LOG-248&epics=visible
RC2 releasing today.
THIS WEEK
ELK Security - AAF integration for RBAC roles - need upfront design issues determined on our side first - work with Acumos - they will assist with security
Acumos Spec review MDCs/Markers - need examples on our end
more detail per log file type (audit etc..)
Two phase approach to phase in implementation
Logging compliance - need review of components
Portal team could be first for review - @Shishir Thakore
Log performance - LOG-376 workaround for now
POMBA scope expansion (or possible new project independent of Logging)
Logging externalization/Pluggabliilty - @Mike Elliott will assist
common charts
pluggablility
*as a service
include @Shishir Thakore in all discussions on this - as well as security (include Vinny on all security talks as well) - LOG-190
Branching "Beijing" branch needs to be done this week - after this we will double commit or cherry-pick bugs only to the branch
the master branch will continue as casablanca
Casablanca scope discussion start
fill out Logging Casablanca Release Planning
Normal ONAP TSC/Project pull for capabilities up to Beijing release
Acumos logging spec review for Tue 29 May – cross ONAP (Casablanca focus)
Logging performance (Beijing focus) - under scale (the existing DaemonSet)
Logging security (Casablanca focus) (work with Acumos team on this)
Logging externalization (Casablanca focus)
Meetings Past
Last 2nd friday - Log(ELK) security review - https://lists.onap.org/pipermail/onap-discuss/2018-May/009695.html
Minutes on https://lf-onap.atlassian.net/browse/LOG-409
Last 2nd Friday - ELK performance review - was private - all onap and acumos meetings should be posted to onap-discuss
Last Thu - ELK performance hands on 2 - https://lists.onap.org/pipermail/onap-discuss/2018-May/009822.html
Last Fri - ELK security review 2 - https://lists.onap.org/pipermail/onap-discuss/2018-May/009833.html - not enough traffic to verify
Last Tue - Arch subcommittee review of POMBA = 55 min - 43 participants
Meetings Future
today 10-12 - Arch subcommittee review of POMBA #2 Logging Scope Change for POMBA seed code
follow up - ELK performance hands on 3 - To book
follow up - ELK security review 2 - To book with AAF - conflict with Arch SC meet today
every Thu at 11:00 (30 min overlap with TSC) - Acumos Log Spec Sync (AT&T, Amdocs, TechMahindra)
sync logging specs when the acumos side becomes public - https://lf-onap.atlassian.net/browse/LOG-416
Patches Merged - https://gerrit.onap.org/r/#/q/status:merged+project:+logging-analytics, https://gerrit.onap.org/r/#/q/status:merged+project:+oom
CLAMP Logging sidecar
Tested on a cluster - merge pending
Logstash daemonset
Log4j Wrapper code
@Luke Parker Just wanted to say thanks for the library and code coverage currently at 83% - https://sonar.onap.org/component_measures?id=org.onap.logging-analytics%3Alogging-analytics&metric=coverage
Patches Pending - https://gerrit.onap.org/r/#/q/status:open+project:+logging-analytics.
elasticsearch/kibana readiness/liveness adjustment to allow startup timing
Critical JIRAs
https://lf-onap.atlassian.net/browse/LOG-230
Logging Pair Wise Testing for Beijing Release - needs more "component logs make to ELK" testing
Scope Changes
Scope Change: POMBA architecture scope change review postponed until post 22 May (arch conference) - now 29th May
Scope Change: integration with acumos logging
TBD
Scope Change: CD/deployment scripts templates (rancher, azure, cd) - moved from OOM-710 to https://lf-onap.atlassian.net/browse/LOG-320
merged - planning scope change review by Arch team 5 June
Healthcheck up to 41/43 https://lists.onap.org/pipermail/onap-discuss/2018-May/009814.html
both systems in sync
http://jenkins.onap.info/job/oom-cd-master/2971/consoleFull
https://jenkins.onap.org/view/External%20Labs/job/lab-tlab-beijing-oom-deploy/321/console
Cross Team
Collaborate with the AAF project on securing our 3 ELK ports
security meet: just before this one at 10 EDT GMT-5 on Tue
separate out
AAF Roles/authorization (use an existing project with roles already defined ...)
certificate collaboration with AAI - use their solution (keystore etc...)
CLAMP is running a full ELK stack - raised collaboration JIRA to move the stack to a common chart (we are on 5.5.0 they are one 5.5.9)
External ELK stack discussion @Shishir Thakore https://lf-onap.atlassian.net/browse/LOG-190
Acumos integration @Shishir Thakore and @Michael O'Brien - https://lf-onap.atlassian.net/browse/LOG-264
TODO:
? June - 2nd log spec demo - arch review
Review service mesh log overlap
review MDC grouping
Provide MDC documentation for Acumos in ONAP - expand our doc
governance: @Shishir Thakore Q: logging compliance - TSC requires 2 things - logs make it to the elk stack, and that the MDC format/req are in spec (need a junit? to point to or for the teams to run)
@Lee Breslau and @Cheuk Yiu Horace Ip - thank you very much
Mike to post wiki grid checklist from TSC for PTLs to fill out - eventual goal is an lf jenkins job - via ciman