LOG Meeting Minutes 2018-05-22
Notes
The regular zoom is in use - likely the openstack summit - https://zoom.us/j/519971638
Use my personal one for this one today - zoom.us/j/7939937123
JIRA board - https://jira.onap.org/secure/RapidBoard.jspa?rapidView=53&view=planning&selectedIssue=LOG-248&epics=visible
RC2 pushed out 2 weeks from last thu.
Meetings Past
Last friday - Log(ELK) security review - https://lists.onap.org/pipermail/onap-discuss/2018-May/009695.html
Minutes on LOG-409: ELK securityClosed
Last Friday - ELK performance review - was private - all onap and acumos meetings should be posted to onap-discuss
Last Monday - Acumos Log Spec Sync (AT&T and Amdocs only - next one will be in public)
sync logging specs when the acumos side becomes public - LOG-416: Synchronize ONAP and Acumos logging specification MDCs as much as possibleClosed
Meetings Future
Next Thu - ELK performance hands on 2 - https://lists.onap.org/pipermail/onap-discuss/2018-May/009822.html
Next Fri - ELK security review 2 - https://lists.onap.org/pipermail/onap-discuss/2018-May/009833.html
Next Tue - Arch subcommittee review of POMBA
Patches Merged - https://gerrit.onap.org/r/#/q/status:merged+project:+logging-analytics, https://gerrit.onap.org/r/#/q/status:merged+project:+oom
Log4j Wrapper code
Logstash container clustering - replicaSet to 3 (temp until DaemonSet is merged below)
Patches Pending - https://gerrit.onap.org/r/#/q/status:open+project:+logging-analytics.
Log4j Wrapper code
Logstash daemonset
elasticsearch/kibana readiness/liveness adjustment to allow startup timing
Critical JIRAs
Scope Changes
Scope Change: POMBA architecture scope change review postponed until post 22 May (arch conference) - now 29th May
LOG-196: POMBA: scope change research/wiki for architectural subcommittee reviewClosed
https://lists.onap.org/pipermail/onap-discuss/2018-May/009660.html
will likely be raised by Chris after ONAPARC-153: Policy changes (Pam)Closed
Scope Change: integration with acumos logging
TBD
Scope Change: CD/deployment scripts templates (rancher, azure, cd) - moved from OOM-710 to https://lf-onap.atlassian.net/browse/LOG-320
merged - planning scope change review by Arch team 5 June
Healthcheck up to 41/43 https://lists.onap.org/pipermail/onap-discuss/2018-May/009814.html
both systems in sync
http://jenkins.onap.info/job/oom-cd-master/2971/consoleFull
https://jenkins.onap.org/view/External%20Labs/job/lab-tlab-beijing-oom-deploy/321/console
Cross Team
Collaborate with the AAF project on securing our 3 ELK ports
security meet: just before this one at 10 EDT GMT-5 on Tue
CLAMP is running a full ELK stack - raised collaboration JIRA to move the stack to a common chart (we are on 5.5.0 they are one 5.5.9)
External ELK stack discussion @Shishir Thakore https://lf-onap.atlassian.net/browse/LOG-190
Acumos integration @Shishir Thakore and @Michael O'Brien - LOG-264: Acumos ONAP logging integrationClosed
TODO:
? June - 2nd log spec demo - arch review
Review service mesh log overlap
review MDC grouping
governance: @Shishir Thakore Q: logging compliance - TSC requires 2 things - logs make it to the elk stack, and that the MDC format/req are in spec (need a junit? to point to or for the teams to run)
@Lee Breslau and @Cheuk Yiu Horace Ip - thank you very much
Mike to post wiki grid checklist from TSC for PTLs to fill out - eventual goal is an lf jenkins job - via ciman