LOG Meeting Minutes 2018-10-02
Agenda (15 min dur)
RC0 Release work
in prep of the RC0 release - the jenkins jobs are blocking on any remaining snapshot artifact so...
Prudence and I are releasing all the artifacts in logging and POMBA working our way down the dependency treeRelease artifacts to nexus2 - see Logging Release Management
1.2.2. release started - next version 1.4.0-SNAPSHOT for dublin - will branch - https://gerrit.onap.org/r/#/c/69618/1
1.2.2 release version will unblock
will remove docker job for now - as we use oomk8s on dockerhub for now - https://jenkins.onap.org/view/logging-analytics/job/logging-analytics-master-docker-version-java-daily/
CLM critical fixes (was 9 down by 1) - tomcat and spring left
CLM critical issues are being fixed, the logback library was updated thu
https://gerrit.onap.org/r/#/c/69415/ logback 1.1.3 to 1.2.3
left LOG-604: Address critical sonar issues in CLM buildClosed
pairwise testing
contrib/netbox is disabled again by default - https://gerrit.onap.org/r/#/c/69593/
filling out Integration Weather Board for Casablanca Release - put link to live CD healthcheck
Healthcheck - hourly minimal deploy of logging, pomba and robot
Development work
logback.xml changes - testing now - https://gerrit.onap.org/r/#/c/62405/
merge Luke's template for parameterization
minor lag (hours) issue between gerrit/git - need to post to LF - https://git.onap.org/logging-analytics/pomba/pomba-audit-common/tree/version.properties
queue
single logback
logging library retrofit of portal/sdk
remove filebeat sidecars in favour of /var/lib/docker/ logs and filebeat DaemonSet - LOG-587: Refactor Filebeat per uService sidecar as per VM DaemonSetClosed
Dublin scope
We should plan for Dublin scope - therefore next meeting we can review the prioritized list of epics to present to the architecture subcommittee.
There is a meeting in montreal later this month we will do this.
ONAP ARCHITECTURE FACE TO FACE
Monday, October 29, 2018 - Wednesday, October 31, 2018
IBM Montreal Innovation Center
800, De La Gauchetière Street West
Montréal, Quebec H5A 1K6
Canada
JIRA board
Gerrit merges
POMBA
healthcheck for 3 containers in last wed https://gerrit.onap.org/r/#/c/68529/ will do kibana later this week
pomba healthcheck failures from friday fixed late monday (raised at PTL meet monday) - were due to out of order oom/pomba merges
To assist the LF with a post merge JobBuilder step for CD I reenabled the system at jenkins.onap.info, kibana.onap.info:5601
Notes
todo
address todos on this , 2nd last @Cheuk Yiu Horace Ip standard log signatures for log checking tool testing
and 3rd last @Dave Williamson (ServerFQDN and EELF 1.0.x usage)