[ptls] 2018-05-07
Date
Duration 60 minutes
Discussion items
Duration | Agenda Item | Requested by | Notes / Links |
---|---|---|---|
review of open RC1 | from TSC meeting | ||
release criteria | from TSC meeting | ||
volte use case | |||
RC1 Review
DMaaP has met R1 criteria
DCAE -pending pairwise testing
CLAMP -pending OOM
Q) Benefit of testing in multiple labs?
A) It is needed because the differences between OOM and HEAP deployments
Discussion over level of effort being invested on HEAT deployment over OOM.
FREEMAN, BRIAN D Dev teams are testing in one environment until the team gets blocked and then move to another env.
Gildas Lanilis Gmail Spike in Integration testing blockers Beijing Release Integration Test Blocking Issues
priority:
- Fix OOM deployment issues
- Teams should be focused on fixing the integration blockers.
- blockers to Pairwise testing.
- Ensure OOM and HEAT deployments are setup
- War Room for SDC / VOLTE - finalize certification and Tosca packages
Roger Maitland, Michael O'Brien OOM team has spend a lot of time with OOF and AAF - these teams are more reliant on the OOM team to perform their testing than the other teams. The PTLs are the owners of their own container and health-check fixes.
The OOM team has done all they can to assist.
http://jenkins.onap.info/job/oom-cd-master/2864/console
http://kibana.onap.info:5601/app/kibana#/dashboard/AWAtvpS63NTXK5mX2kuS?_g=(refreshInterval:(display:Off,pause:!f,value:0),time:(from:'2018-05-05T07:48:22.379Z',mode:absolute,to:'2018-05-07T12:29:27.688Z'))&_a=(description:'',filters:!(),options:(darkTheme:!f),panels:!((col:1,id:AWAts77k3NTXK5mX2kuM,panelIndex:1,row:1,size_x:8,size_y:3,type:visualization),(col:9,id:AWAtuTVI3NTXK5mX2kuP,panelIndex:2,row:1,size_x:4,size_y:3,type:visualization),(col:1,id:AWAtuBTY3NTXK5mX2kuO,panelIndex:3,row:7,size_x:6,size_y:3,type:visualization),(col:1,id:AWAttmqB3NTXK5mX2kuN,panelIndex:4,row:4,size_x:6,size_y:3,type:visualization),(col:7,id:AWAtvHtY3NTXK5mX2kuR,panelIndex:6,row:4,size_x:6,size_y:6,type:visualization)),query:(match_all:()),timeRestore:!f,title:'CD%20Health%20Check',uiState:(),viewMode:view)
Teams are overwhelming the OOM team, especially when poor quality fixes are being submitted .
Many fixes have not been tested before being submitted. Lots of back-and-forth on
Need help with code reviews.
Component level testing capabilities exist but aren't being used.
cl664y@att.com requests to use SB04 for use by developers for testing.
Agreement that someone that has deployed the component to give it a +1 before giving to OOM team
VoLTE/SDC
Michael Lando Modeling team has the responsibility for doing the testing- SDC team are not the ones to be working on the packaging.
~9 packages for Amsterdam, but should be ~3 for Beijing.
cl664y@att.com requests War Room for SDC / VOLTE
Release Criteria Functional Use Cases:
what is the criteria for passing? - all 4 use cases must pass instantiation, regression and closed loop testing
vcpe plus HPA and change management
need updates at TSC meeting.
sunmary S3p, usecases, HPE, changemgmt, pnfs, manual scaling . Gildas to put a slide together
Action items
- Gildas Lanilis Gmail slides for usecase info to be presented at TSC meeting
- Kenny Paul add to the usecase update to the TSC agenda