2021-07-19 Intel/Wind River Lab Decommission Meeting notes
Date
Jul 19, 2021
Attendees
@Kenny Paul
@Stephen Gooch
Steve Ira
@Trevor Bramwell
Goals
Clarity on the set up required to approximate what currently exists (networking, cabling, access model, etc.) so that we can finalize 3rd party support quotes.
Discussion items
All of the nodes currently the same
2x 1GB connection - flat network for external access
2X 10G east/west v/ vlans, etc.
1x for BMC
UNH came back with a quote the included network gear
@Stephen Gooch Windriver is both willing and able to continue supporting OS level support going forward. can configure everything automated once set up.
Integration team have admin access to the current configs in the lab.
VPN management likely provided by vendor.