2021-07-19 Intel/Wind River Lab Decommission Meeting notes

Date

Jul 19, 2021

Attendees

  • @Kenny Paul

  • @Stephen Gooch

  • Steve Ira

  • @Trevor Bramwell

Goals

  • Clarity on the set up required to approximate what currently exists (networking, cabling, access model, etc.) so that we can finalize 3rd party support quotes.

Discussion items

  • All of the nodes currently the same

    • 2x 1GB connection - flat network for external access

    • 2X 10G east/west v/ vlans, etc. 

    • 1x for BMC 

  • UNH came back with a quote the included network gear

  • @Stephen Gooch Windriver is both willing and able to continue supporting OS level support going forward. can configure everything automated once set up. 

  • Integration team have admin access to the current configs in the lab.

  • VPN management likely provided by vendor.