July 24th to 31st, 2017

Template:

  1. What your team has achieved

  2. Block issues / help needed



  1. What your team has achieved

    1. vCPE: 

      1. Confirmed that the following interfaces related to CLAMP have been defined, implemented, and tested internally inside AT&T: SDC-CLAMP, SDC-DCAE, CLAMP-DCAE.

      2. SDC briefly confirmed that the vCPE model can be fully supported. Will hold a meeting with SDC to go through the details.

      3. Discussed with the VNF developers to revise the design to support auto healing closed loop control.

      4. Revised the service model to better emulate the real life situation.

      5. Confirmed the design process of policies for both closed loop and non-closed loop rules.

  1. Block issues / help needed

    1. vCPE:

      1. To clarify the format of recipes and what tool to use to create such recipes (The SDC team does not have a answer to this).

      2. To confirm the support of the service model in SDC.

      3. To follow up with different projects to collect information and sample designs for each feature (refer Q22 on Use Case Related Important Questions and Answers)

      4. Need volunteers to work on tasks to implement vCPE.