07-11-2018 Control Loop Sub Committee Weekly Meeting
Discussion items
Duration | Agenda Item | Requested by | Notes / Links |
---|---|---|---|
START RECORDING | |||
30m | S3P Performance Level Recommendations | ONAP |
|
|
|
|
|
|
|
|
|
|
|
|
|
NOTES
S3P Performance Level Recommendations
Closed Loop Projects involved during Runtime: DCAE (VES Collector, TCA), Holmes, Policy, APPC/SO/VFC/SDNC, A&AI
NOTE: CLAMP is not involved during runtime. The instantiation/deployment of DCAE components via DCAE controller are not covered by performance measurements. Not involved in CL flow, this is a one-time setup.
Recommendation: VNF measurement is not involved in performance tracking both on the DCAE collection/analytic side as well as on the controller/orchestrator side
Question: Is it "closed-loop" or should this simply be "runtime" projects? Open loop vs Closed loop?
Categories for control loops
Hours vs minutes - Non-real-time vs real-time
open loop ends at the point of manual notification
Traceability between all the control loop run-time projects. Metrics should be consistently tracked among all components.
Did the integration team capture anything during 72 hour stability tests?
Guard Policy - check max count limit on VF module, check prov_status and orchestration status
SDC sets that value. Should be in A&AI
RECORDING