07-11-2018 Control Loop Sub Committee Weekly Meeting

Discussion items 

 

Duration

Agenda Item

Requested by

Notes / Links

Duration

Agenda Item

Requested by

Notes / Links

START RECORDING

30m

S3P Performance Level Recommendations

Casablanca Release Requirements

ONAP

 

 

 

 

 

 

 

 

 

 

 

 

 

NOTES

  • Closed Loop Projects involved during Runtime: DCAE (VES Collector, TCA), Holmes, Policy, APPC/SO/VFC/SDNC, A&AI

    • NOTE: CLAMP is not involved during runtime. The instantiation/deployment of DCAE components via DCAE controller are not covered by performance measurements. Not involved in CL flow, this is a one-time setup.

    • Recommendation: VNF measurement is not involved in performance tracking both on the DCAE collection/analytic side as well as on the controller/orchestrator side

    • Question: Is it "closed-loop" or should this simply be "runtime" projects? Open loop vs Closed loop?

    • Categories for control loops

      • Hours vs minutes - Non-real-time vs real-time

      • open loop ends at the point of manual notification

    • Traceability between all the control loop run-time projects. Metrics should be consistently tracked among all components.

    • Did the integration team capture anything during 72 hour stability tests?

  • Guard Policy - check max count limit on VF module, check prov_status and orchestration status

    • SDC sets that value. Should be in A&AI

 

RECORDING