Modeling Honolulu Release Planning




Overview

Project Name

Enter the name of the project

Project Name

Enter the name of the project

Target Release Name

Honolulu

Project Lifecycle State

Mature

Participating Company 

China Mobile, ZTE, Huawei

Scope

What is this release trying to address?

etsicatalog project:

 Modelspec for modleing subcommittee:

  • Create UML models for new model proposals or enhancements in Honolulu release

  • Document approved models as model specs

Requirements

Describe the use case this release is targeted for (better if reference to customer requirements).

Modeling/etsicatalog will contribute to the following functional requirements: 

Functional requirements:



modelspec will address the following modeling requirements:



Minimum Viable Product

Describe the MVP for this release.

1) ETSI Interface alignment(SOL005 and SOL003) API implement

2) Code contribution to support the  ETSI-Alignment Support for Honolulu

3) Modelspec from modeling subcommittee

Functionalities

List the functionalities that this release is committing to deliver by providing a link to JIRA Epics and Stories. In the JIRA Priority field, specify the priority (either High, Medium, Low). The priority will be used in case de-scoping is required. Don't assign High priority to all functionalities.

Epics

key summary type created updated due assignee reporter priority status resolution
Loading...
Refresh

Stories

key summary type created updated due assignee reporter priority status resolution
Loading...
Refresh



Longer term roadmap

Indicate at a high level the longer term roadmap. This is to put things into the big perspective.

Release Deliverables

Indicate the outcome (Executable, Source Code, Library, API description, Tool, Documentation, Release Note, etc) of this release.

Deliverable Name

Deliverable Description

Deliverable Name

Deliverable Description

Source Code

Source code for etsicatalog

Maven Artifacts

Maven Artifacts for etsicatalog

Docker Containers

Docker container  associated with etsicatalog

Documentation

Modeling detailed documentation

Sub-Components

List all sub-components part of this release.
Activities related to sub-components must be in sync with the overall release.

Sub-components are repositories and are consolidated in a single centralized place. Edit the Release Components name for your project in the centralized page.

Architecture

High level architecture diagram

At that stage within the Release, the team is expected to provide more Architecture details describing how the functional modules are interacting.

Indicate where your project fit within the ONAP Architecture diagram.

Block and sequence diagrams showing relation within the project as well as relation with external components are expected.

Anyone reading this section should have a good understanding of all the interacting modules.

Platform Maturity

Please fill out the centralized wiki page: Honolulu Release Platform Maturity 



  • API Incoming Dependencies

List the API this project is expecting from other projects.
Prior to Release Planning review, Team Leads must agreed on the date by which the API will be fully defined. The API Delivery date must not be later than the release API Freeze date.

Prior to the delivery date, it is a good practice to organize an API review with the API consumers.

API Name

API Description

API Definition Date

API Delivery date

API Definition link (i.e.swagger)

API Name

API Description

API Definition Date

API Delivery date

API Definition link (i.e.swagger)

SDCE-6

SDC Interface for ONAP components subscribe to service notification from DMaaP





SDC API

SDCE-7

SDC Interface for ONAP components retrieve service models from the Design Catalog





SDC API

DMaaP-3

DMaaP Message Router Consuming Interface to provide a message receiving service to the DMaaP user





DMaaP API

MSBE-1

Micro Service Bus Interface  for registration and discovery with the ONAP Micro Service Bus





Microservice Bus API Documentation

  • API Outgoing Dependencies

API this project is delivering to other projects.

API Name

API Description

API Definition Date

API Delivery date

API Definition link (i.e.swagger)

API Name

API Description

API Definition Date

API Delivery date

API Definition link (i.e.swagger)

etsicatalogAPIE-1

Catalog API





Etsicatalog API Document

etsicatalogAPIE-2

NSD Package Management API





etsicatalogAPIE-3

VNF Package Management API





etsicatalogAPIE-4

Parser API





  • Third Party Products Dependencies

Third Party Products mean products that are mandatory to provide services for your components. Development of new functionality in third party product may or not be expected.
List the Third Party Products (OpenStack, ODL, RabbitMQ, ElasticSearch,Crystal Reports, ...).

Name

Description

Version

Name

Description

Version

Django

https://www.djangoproject.com/

2.1.10

djangorestframework

https://www.django-rest-framework.org/

3.10.3

In case there are specific dependencies  (Centos 7 vs Ubuntu 16. Etc.) list them as well.

  • TESTING AND INTEGRATION PLANS

Provide a description of the testing activities (unit test, functional test, automation,...) that will be performed by the team within the scope of this release.

Describe the plan to integrate and test the release deliverables within the overall ONAP system.
Confirm that resources have been allocated to perform such activities.

For Unit Test, Modeling/esticatalog is required to maintain 55% codecoverage at the minumum. 

https://sonarcloud.io/organizations/onap/projects?search=modeling-etsicatalog

Functional test plan:

Modeling/etsicatalog Honolulu Functional Test Cases

  • GAPS

This section is used to document a limitation on a functionality or platform support. We are currently aware of this limitation and it will be delivered in a future Release.
List identified release gaps (if any), and its impact.

Gaps identified

Impact

Gaps identified

Impact

To fill out

To fill out

  • KNOWN DEFECTS AND ISSUES

N/A



  • RISKS

List the risks identified for this release along with the plan to prevent the risk to occur (mitigation) and the plan of action in the case the risk would materialized (contingency).

Please update any risk on the centralized wiki page - Honolulu Risks

  • RESOURCES

Please see the INFO.yaml files associated with each repo as the authoritative sources of information. https://gerrit.onap.org/r/admin/repos/q/filter:modeling

  • RELEASE MILESTONE

The milestones are defined at the Release Planning: Honolulu and all the supporting project agreed to comply with these dates.

  • TEAM INTERNAL MILESTONE

This section is optional and may be used to document internal milestones within a project team or multiple project teams. For instance, in the case the team has made agreement with other team to deliver some artifacts on a certain date that are not in the release milestone, it is erecommended to provide these agreements and dates in this section.

It is not expected to have a detailed project plan.

Date

Project

Deliverable

Date

Project

Deliverable

To fill out

To fill out

To fill out

  • DOCUMENTATION, TRAINING

Please update the following centralized wiki: Honolulu Documentation

That includes

  • Team contributions to the specific document related to he project (Config guide, installation guide...).

  • Team contributions to the overall Release Documentation and training asset

  • High level list of documentation, training and tutorials necessary to understand the release capabilities, configuration and operation.

  • Documentation includes items such as:

    • Installation instructions

    • Configuration instructions

    • Developer guide

    • End User guide

    • Admin guide

    • ...

Note

The Documentation project will provide the Documentation Tool Chain to edit, configure, store and publish all Documentation asset.


Other Information

  • Vendor Neutral

If this project is coming from an existing proprietary codebase, ensure that all proprietary trademarks, logos, product names, etc. have been removed. All ONAP deliverables must comply with this rule and be agnostic of any proprietary symbols.

  • Free and Open Source Software

FOSS activities are critical to the delivery of the whole ONAP initiative. The information may not be fully available at Release Planning, however to avoid late refactoring, it is critical to accomplish this task as early as possible.
List all third party Free and Open Source Software used within the release and provide License type (BSD, MIT, Apache, GNU GPL,... ).
In the case non Apache License are found inform immediately the TSC and the Release Manager and document your reasoning on why you believe we can use a non Apache version 2 license.

Each project must edit its project table available at Project FOSS.



Charter Compliance

The project team comply with the ONAP Charter.