R7 PNF Pre-onboarding / (onboarding)

R7 PNF Pre-onboarding / (onboarding)

For R7 PNF Pre-onboarding

 

USE CASE

PNF Preonboarding / Onboarding

 

https://lf-onap.atlassian.net/browse/REQ-319

 

VNF SDK STORY JIRA

https://lf-onap.atlassian.net/browse/VNFSDK-597

Architecture Sub-committee Jira tracker

 

https://lf-onap.atlassian.net/browse/ONAPARC-575

Key Contacts

 

@Benjamin Cheung   @damian.nowak

NON FUNCTIONAL REQUIREMENT CONTRIBUTION

Component

U/C VNFSDK Story Jira

VNFSDK NFR

Company

Description

Component

U/C VNFSDK Story Jira

VNFSDK NFR

Company

Description

VNF-SDK

https://lf-onap.atlassian.net/browse/VNFSDK-597

https://lf-onap.atlassian.net/browse/REQ-351

Nokia

Non functional requirement contribution:

(1) VNF-SDK Java 11 migration and

(2) JJB update Ubuntu 18.04

See VNF Planning Jira: https://lf-onap.atlassian.net/browse/VNFSDK-609

 

 

 

 

 

BUSINESS DRIVER

This section describes Business Drivers needs.

EXECUTIVE SUMMARY This requirement enhances the PNF (Onboarding) / Pre-onboarding use case. This requirement introduces package security Option2 improvements on Signature per artifact on the Vendor delivered package as defined in ETSI NFV SOL004 v2.7.1 section 5.2.  The validation of onboarded PM dictionary data based on schema information will be done. The standard can be found here: https://www.etsi.org/deliver/etsi_gs/NFV-SOL/001_099/004/02.07.01_60/gs_NFV-SOL004v020701p.pdf . In R4 and R6, Option 1 signature per package was developed but not Option 2.

BUSINESS IMPACT - The enhancement to Onboarding & Pre-onboarding is a critical business function because they are vital to design-time operation to properly onboard vendor packages.

BUSINESS MARKETS - This project applies to any domain (wireless, transport, optical, and wireline) that ONAP may manage.

FUNDING/FINANCIAL IMPACTS - The PNF Onboarding & Pre-onboarding use case has Operating Expense (OPEX) savings for operators because of the ability to saving time and expenses during installation and commissioning of PNF resources.

ORGANIZATION MGMT, SALES STRATEGIES - There is no additional organizational management or sales strategies for this use case outside of a service providers "normal" ONAP deployment and its attendant organizational resources from a service provider.

 

DEVELOPMENT STATUS

PROJECT

PTL

User Story / Epic

Requirement

A&AI

@James Forsyth

 

 

AAF

@Jonathan Gathman

 

 

APPC

@Takamune Cho

 

 

CLAMP

@Gervais-Martial Ngueko

 

 

CC-SDK

@Dan Timoney

 

 

DCAE

@Vijay Kumar

 

 

DMaaP

@Mandar Sawant

 

 

External API

@Matthieu Geerebaert

 

 

MODELING

@Hui Deng

 

 

Multi-VIM /

Cloud

@Bin Yang

 

 

OOF

@Shankaranarayanan Puzhavakath Narayanan

 

 

POLICY

@Pamela Dragosh

 

 

PORTAL

@Manoop Talasila

 

 

SDN-C

@Dan Timoney

 

 

SDC

@Ofir Sonsino

 

 

SO

@Seshu Kumar Mudiganti

 

 

VID

@ittay

 

 

VNFRQTS

@Steven wright

 

 

VNF-SDK

@victor gao  → @Former user (Deleted)

EPIC #1

Package Validation enhancements notable Package security (option 2 security on entire package)

- Signatures Hashchecks per artifact (applicable for both Option 1 & 2) – in R4/R5/R6 signature Hashcheck may exist for option 1.

  • Improvements & Enhancements for PNFs.

https://lf-onap.atlassian.net/browse/VNFSDK-597

CDS

@Yuriy Malakov

 

 

List of PTLs:Approved Projects

*Each Requirement should be tracked by its own User Story in JIRA 

USE CASE DIAGRAM

Use cases define how different users interact with a system under design.  Each use case represents an action that may be performed by a user (defined in UML as an Actor with a user persona).

USE CASE FUNCTIONAL DEFINITIONS

Use Case Title

PNF Pre-onboarding & Onboarding

Actors (and System Components)

#1 - Vendor / #2 - SDC / #3 - VNF-SDK / #4 - ONAP Components

Description

The base PNF pre-onboarding / onboarding use case is at this wiki:

5G - PNF Pre-Onboarding & Onboarding

SOL004 specifies Package integrity/authenticity

OPTION #1 open package create sign each artifacts of package & create a digest; store calculated hashes in manifest file. Calculator checksum of each artifact. 

OPTION #2 – same but on entire CSAR package. Sign the entire package put with signature.  

Points of Contact

@Benjamin Cheung  , @Zu Qiang  , @Michela Bevilacqua [Ericsson]  , @damian.nowak

Preconditions

The PNF Vendor package is delivered to ONAP

The PNF Vendor package is described in detail in the "base" wiki page

Triggers / Begins when

Describes the trigger for beginning the Use Case

Steps / Flows (success)

Describes the sequence of steps and interactions that occur during the Use Case (may include: description, data exchanges, functionality, state changes)

Interaction diagrams may be included or referenced

Post-conditions

The expected results of the execution of the Use Case

Includes description of Information Produced

Alternate / Exception Paths

Description of any exceptions or special process that could occur during Use Case

Related Use Cases

List of the Use Cases referenced by this Use Case

Assumptions

Describes any assumptions that are made for this use case

Tools / References / Artifacts

List of any tools or reference material associated with this Use Case as well as any JIRA trace-ability.

List of any associated diagrams or modelling artifacts associated with the Use Case

TESTING

Current Status

  1. Testing Blockers

  2. High visibility bugs

  3. Other issues for testing that should be seen at a summary level

  4. Where possible, always include JIRA links

END TO END FLOW TO BE TESTED

 

TEST CASES AND STATUS

 

1

There should be a test case for each item in the sequence diagram

NOT YET TESTED

2

create additional requirements as needed for each discreet step

COMPLETE

3

Test cases should cover entire Use Case

PARTIALLY COMPLETE

 Test Cases should include enough detail for testing team to implement the test

 FAILED