[portal-platform] 06-13-2018 portal weekly meeting
Agenda:
Casablanca goals are being defined here https://wiki.onap.org/display/DW/Casablanca+goals
Code Coverage needs to be improved to 80% - require TechM and IBM resources to commit for the plan
SDK repo - Naveen is working this. update on the SDK coverage?
Prasad/Swapnali - Please use Epic - PORTAL-268 - for code coverage - PORTAL-273; for sonar issues - PORTAL-247; (focused on Portal repo).
Portal's Javascript unit test plan? Yes it should be done in Casablanca- Prasad/Swapnali (Manoop to followup with TSC on the requirement on JS code coverage), Karma - look into it (Yatindra looking into it) plugin like jacoco
Design for Angular update - Saravanan to provide the Design review and plan; listed out items, testing one screen, needs a week for this , another week for design document
Portal Admin screen - for POC to migrate to latest Angular - Saravanan (Design discussion to understand the impact - Thurs 05/31).
Demo with one screen with Angular 5, Karma testing - Demo shown to Sunder
Bring the application with Angular 1 and latest versions - Saravanan
Estimate of the migration to latest Angular - Saravanan
fonts and icons abstraction so that they can be switched with a flag configuration - Saravanan
SDK code coverage dropped to 49% on master - every new code commit from any developer must make sure that that the code coverage remains same and improves - Kishore to push the code coverage mostly related to AAF changes. - The latest commit is abandoned - new commit is submitted (https://gerrit.onap.org/r/#/c/51087/) - it is under review (verify the comments under the abandoned commit are addressed - here is the abandoned commit - https://gerrit.onap.org/r/#/c/49785/).
MUSIC jar 2.5.5 is missing and failing Jenkins jobs.
Lorraine to run grep scan for ecomp keyword - done - Review with Sunder/Manoop - will send them result in email
Look for the vm host names in the files - to clean up - Lorraine already made commit for this changes - Hima can help if requires java file changes
Design to be scheduled for Simplify etc/hosts, OOM and AAF changes - Sunder (forward to Ritesh and team too)
Award nominations - ONAP Community Awards: Beijing Release - Nominations: Close 6 PM Pacific time, June 14 - Voting will take place June 15 -- 19
Attendees:
Discussion Items:
OOM integration and enhancement plans for Casablanca - Manoop/Sunder
deployment, scalabilty of the platform issues (Start creating user stories based on the design review)
Music cassandra as a service - integration? - Sunder
Music team to provide DB as a service - working with Bharat (pending proposal and approval from ONAP architecture)
AAF integration plan for Casablanca - Sunder/Farhan/Manoop
Turning ON AAF and starting using role management for partners
AAF certificate management integration (both for FE HTTPs and BE rest API calls)
Security issues from Nexus-IQ plan for Casablanca - Farhan
Angular will be a problem - How can we upgrade Angular - Saravanan
Possibly in phases - In casablanaca, start removing the vulnerabilities that are maeked as - "Not vulnerable in ONAP" - CLM scan report - portal-Build-20180613-155656.pdf (Ritesh to review the report to understand the impact of changes)
Fix pending Fortify issue
Internationalization language support plan for Casablanca - PORTAL-267 - Leimeng to followup
Choose language/internal components
In discussion by larger community (Use Case UI Team), expecting implementation details
Leimeng has sent email to Tao Shen shentao@chinamobile.com on this topic and is waiing fr his return email
API Versioning and Backward Compatibility (Technical Debt) - Analysis on pending changes?
Performance
Memory usage optimization - Hibernate 4 memory leaks issue
Split DB, Portal and SDK docker images - build portal and SDK docker images separately from respective jenkins jobs rather than in single jenkins job (which have strong dependency on branch version)
UI upgrades - Angular, Bower
Simplify deployment by avoiding the etc/hosts file entries - Sunder to estimate on this
Logging enhancements - PORTAL-170: Logging ImprovementClosed
Testing
CSIT test for new Casablanca features - Sunder to schedule a session to go over the new features.
Convert ECOMP selenium tests into CSIT ONAP Robot Framework tests - Sunder/Sireesh - Sunder to provide the ECOMP test scripts to Sireesh.
Enable JavaScript Unit tests. (How will this impact the angular upgrade? Will these unit tests work as is even after upgrade?).
Code Coverage needs to be improved to 80% on both portal and portal/sdk repos.
Defect fixes
Beijing Release Planning:
M0 - dev kick-off, Nov 16
M1 - planning Jan 16
M2 Functionality Freeze Feb 12, 2018 → fill in the contents by Manoop & Leimeng - done
M3 API/Data Model Freeze Mar 8, 2018
M4 Code Freeze Mar 29, 2018
RC0 ChecklistApr 19, 2018
RC1 Checklist May 3, 2018
RC2 Checklist May 31, 2018
Release Delivery Jun 7, 2018