5G Use Case (R4 Dublin)
This is the wiki for contributions/discussions related to the 5G Use Case for the ONAP Dublin Release.
TABLE OF CONTENTS
5G DUBLIN USE CASE PROPOSALS
TITLE | DESCRIPTION | CATEGORY | WIKI |
---|---|---|---|
BULK PM | Performance Measurements 5G RAN Bulk Upload, Casablanca Carry-over items | Data Collection 5G FCAPS | |
PNF PRE-ONBOARDING & ONBOARDING Use Case | PNF Package delivery, Pre-onboarding and PNF Onboarding via SDC in Dublin. | PNF Support Discovery | |
CONFIGURATION WITH NETCONF | Enhancement to NETCONF support in ONAP supporting 5G and other use cases. | PNF Support Communications 5G FCAPS | |
5G FM META DATA & 5G PM DICTIONARY | Support for handling FM Meta Data & support for PM Dictionary & PM Schema (from standards) | PNF Support Data Collection 5G FCAPS | |
OOF & PCI | Optimization and PCI (SON) development. Casablanca Carry-over items | 5G Operational Optimization | |
PNF Plug and Play | PNF Plug and Play support for PNF discovery, Casablanca Carry-over items, support by PRH (PNF Registration Handler) | PNF Support (Carry Over) Discovery | |
PNF S/W UPGRADE | PNF Software upgrade to update the software on a PNF, Casablanca Carry-over items | PNF Support 5G FCAPS | |
NETWORK SLICING | Advanced 5G functionality, for Network Slicing development and early steps in long-lead development. | 5G Operational Optimization |
Portal Project & Database/Data Layer
USE CASES BY CATEGORY
Use Case | PNF Support | 5G FCAPS | Opera-tional | Commun-ications | Discovery | STAGE |
---|---|---|---|---|---|---|
Bulk PM | PM, Data Collection | 2 | ||||
PNF Pre-Onboarding/ Onboarding | XXXX | XXXX | 1 (start-up) | |||
Configuration with NetConf | CM | XXXX | 2 (configuration) | |||
PM Dictionary FM Meta Data | PM FM | 2 (configuration) | ||||
OOF PCI | XXXX | 3 (operational) | ||||
PNF Plug and Play | XXXX | XXXX | 1 (start-up) | |||
PNF S/W Upgrade | XXXX | CM | 2 (configuration) | |||
Network Slicing | XXXX | 3 (operational) |
The discussion in the 5G Use Case sub-committee was to think about the lifecycle of a PNF in "stages"
This is artificial, but was used to help us think about certain categories that Use Cases might fit into:
STAGE 1 START UP - Stage 1 is related to design time, pre-onboarding/onboarding, discover & plug and play. It relates to activities to "start up" a PNF, recognize and define the PNF, and describe resources. Those design time activities that are done to define a PNF to be used.
STAGE 2 CONFIGURATION - This represents activities that occur AFTER the PNF has been discovered. Some configuration, or S/W upgrade for example. Activities that are typically done in configuring or sending operational information to the PNF, or prepare the PNF before it goes into full operation; or reconfiguration after the PNF is up and running.
STAGE 3 OPERATIONAL - Use Cases that deal with a PNF after Start up and Configuration.