/
AAI R3 Platform Maturity

AAI R3 Platform Maturity

Platform Maturity

Refering to CII Badging Security Program and Platform Maturity Requirements, fill out the table below by indicating the actual level , the targeted level for the current release and the evidences on how you plan to achieve the targeted level.

Area

Actual Level

Targeted Level for Casablanca

How, Evidences

Comments

Area

Actual Level

Targeted Level for Casablanca

How, Evidences

Comments

Performance

1

2

key summary assignee status resolution
Loading...
Refresh

  • 0 -- none

  • 1 – baseline performance criteria identified and measured

  • 2 & 3 – performance improvement plans created & implemented

Stability

1

2

key summary assignee status resolution
Loading...
Refresh

  • 0 – none

  • 1 – 72 hours component level soak w/random transactions

  • 2 – 72 hours platform level soak w/random transactions

  • 3 – 6 months track record of reduced defect rate

Resiliency

2

2

key summary assignee status resolution
Loading...
Refresh

AAI will leverage OOMs single site failure detection and recovery

  • 0 – none

  • 1 – manual failure and recovery (< 30 minutes)

  • 2 – automated detection and recovery (single site)

  • 3 – automated detection and recovery (geo redundancy)

Security

1

1

key summary assignee status resolution
Loading...
Refresh

AAI will maintain 50+ test coverage

For javascript components, AAI will reach to attain +10% from the initial scan coverage value.

  • 0 – none

  • 1 – CII Passing badge + 50% Test Coverage

  • 2 – CII Silver badge; internal communication encrypted; role-based access control and authorization for all calls

  • 3 – CII Gold

Scalability

1

1

key summary assignee status resolution
Loading...
Refresh

AAI will leverage OOM

  • 0 – no ability to scale

  • 1 – single site horizontal scaling

  • 2 – geographic scaling

  • 3 – scaling across multiple ONAP instances

Manageability

1

2

key summary assignee status resolution
Loading...
Refresh

AAI needs to investigate the level of compliance we can reach with the ONAP logging specification 1.2

  • 1 – single logging system across components; instantiation in < 1 hour

  • 2 – ability to upgrade a single component; tracing across components; externalized configuration management

Usability

1

2

key summary assignee status resolution
Loading...
Refresh

  • 1 – user guide; deployment documentation; API documentation

  • 2 – UI consistency; usability testing; tutorial documentation





Related content

AAI R3 M1 Release Planning
AAI R3 M1 Release Planning
More like this
Casablanca Platform Maturity S3P Planning (New)
Casablanca Platform Maturity S3P Planning (New)
More like this
AAI R2 Release Planning
AAI R2 Release Planning
More like this
AAI R2 Architecture Review
AAI R2 Architecture Review
More like this
Platform Maturity Requirements (S3P)
Platform Maturity Requirements (S3P)
More like this
AAI R4 M4 Deliverable for Code Freeze Milestone Checklist
AAI R4 M4 Deliverable for Code Freeze Milestone Checklist
More like this