/
CLAMP 2017-08-09 Meeting notes

CLAMP 2017-08-09 Meeting notes

Date

Aug 9, 2017

Attendees

  • @ChrisC

  • @Pamela Dragosh

  • @Xue Gao

  • @Ron Shacham

  • @Gervais-Martial Ngueko

  • Jeremy Le CLEC'H (Orange)

  • @xinyuan wang

  • Avinash

  • @Margaret Chiosi

  • Kishore

  • @Vijay Kumar

  • @Lusheng Ji

  • @Tina Tsou (Deactivated)

  • @Michał Pawłowski

  • Veer

  • @Sebastien Determe

  • @Rittwik Jana (Deactivated)


Goals

  • Status Report

  • Sprint review

  • Discuss Design items

Discussion items

Time

Item

Who

Notes

Time

Item

Who

Notes

10min

Review current status of CLAMP

@Gervais-Martial Ngueko

  • Presented CLAMP Dashboard to the Team

  • Discussed on M2 checklist

40min

Discuss the Design for R1

@Ron Shacham, @Gervais-Martial Ngueko, @Pamela Dragosh, @Margaret Chiosi

  • A presentation was prepared by Ron to show the details of the Changes for R1, mapped to the use cases we want to support in this release

  • Still a few details to sort out/Enhancement (TCA call on Monday)

  • Looked at the flow of CLAMP (highlighted the various part of the work areas for R1 VS the existing functions in the seed code)

  • Discussed integration with VF-C and who is defining the closed loop actions, deferred to the use case group

  • Discussed the design time through the cockpit

  • Blueprint generation during onboarding (at least basic format)

  • SDC providing the blueprint & template is outside the scope of R2

  • API to policy should stay the same, but the content may differ

  • Discussed policy interations

  • blueprint for closed loops might change due to DCAE R2

  • Will the VES onboarding YAML be created by the use case team ?

  • need to define a backup plan in case it is not available (manual internal list)

  • Instantiation should already be ok with the latest seed code

  • latest seed code include 1707

  • next steps to translate JIRA task under the existing stories



Action items

Translate design into subtasks (Chris&Team)