Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 3 Next »

The content of this template is expected to be fill out for M1 Release Planning Milestone.

Info

Use the "Copy" and "Move" options (available under the ..., top right of this page) to duplicate this template into your project wiki.
Use the Wiki to document the release plan. Don't provide PowerPoint.
Use as much diagrams and flow charts as you need, directly in the wiki, to convey your message.


Overview

Project NameEnter the name of the project
Target Release NameGuilin
Project Lifecycle StateIncubation
Participating Companies AT&T, Bell Canada, Fujitsu, Ericsson, IBM, Huawei, Nokia, Orange, Samsung, Tech Mahindra, Wipro

Scope

What is this release trying to address?

The Guilin release contains a number of enhancements primarily centered around 5G use cases.  

We also plan enhancements to the Service Logic Interpreter (SLI) - which currently runs within the OpenDaylight Karaf container - to allow it to run in a separate container, independent of OpenDaylight. This work was begun in the Frankfurt release and continues in Guilin.  In Guilin, 2 new microservices will be developed that run outside OpenDaylight:

  • sliboot - which runs the SLI-API interface
  • generic-resource-api which runs the GENERIC-RESOURCE-API interface

The latter of these 2 is actually part of the SDNC project, but we include it here since we anticipate some associated CCSDK changes will be needed to support that work.

The Guilin release also includes a major release upgrade in OpenDaylight to the OpenDaylight Sodium release.  This release is considered a "sea change" release - meaning it is a major, BREAKING release.  Consequently, the CCSDK Giulin release numbering will roll to 1.0.x, reflecting that we cannot guarantee full backward compatibility with previous releases.

Requirements

The following table lists the new functional requirements CCSDK is committing to support for the Frankfurt Release:

RequirementsCompanies Supporting Requirement

REQ-325 - Getting issue details... STATUS

Fujitsu

REQ-345 - Getting issue details... STATUS

IBM

REQ-342 - Getting issue details... STATUS

Huawei, IBM, Wipro

REQ-347 - Getting issue details... STATUS

Huawei, CMCC, Wipro

REQ-322 - Getting issue details... STATUS

IBM

REQ-341 - Getting issue details... STATUS

T-Mobile, Orange

REQ-352 - Getting issue details... STATUS

Ericsson



Minimum Viable Product

The following epics represent the minimum viable product of the CCSDK Guilin Release:

key summary type created updated due assignee reporter priority status resolution
Loading...
Refresh

The following epics are also in scope for Guilin, but are not considered of the minimum viable product.  In the event of unanticipated resource constraints, these could be reduced in scope or deferred without impacting any functionality deemed by the TSC as critical for Guilin.

key summary type created updated due assignee reporter priority status resolution
Loading...
Refresh

Functionalities

List the functionalities that this release is committing to deliver by providing a link to JIRA Epics and Stories. In the JIRA Priority field, specify the priority (either High, Medium, Low). The priority will be used in case de-scoping is required. Don't assign High priority to all functionalities.

Epics


The following epics are committed for the CCSDK Guilin Release:

key summary type created updated due assignee reporter priority status resolution
Loading...
Refresh

The following epics are also in scope for Guilin, but are not considered of the minimum viable product.  In the event of unanticipated resource constraints, these could be reduced in scope or deferred without impacting any functionality deemed by the TSC as critical for Guilin.

key summary type created updated due assignee reporter priority status resolution
Loading...
Refresh

Stories

key summary type created updated due assignee reporter priority status resolution
Loading...
Refresh


Bugs

key summary type created updated due assignee reporter priority status resolution
Loading...
Refresh

Longer term roadmap

Indicate at a high level the longer term roadmap. This is to put things into the big perspective.

Release Deliverables

Indicate the outcome (Executable, Source Code, Library, API description, Tool, Documentation, Release Note, etc) of this release.


Deliverable NameDeliverable DescriptionDeliverable Location
CCSDK Source CodeSource code for CCSDK projectONAP gerrit
CCSDK Maven ArtifactsCompiled code that can be referenced in other projects as maven dependenciesONAP Nexus
CCSDK Docker Containers

Docker containers associated with SDNC project:

  • Controller (OpenDaylight) container
  • Database container
  • Directed Graph Builder container
ONAP Nexus
DocumentationUser and developer guidesONAP Wiki
CCSDK CI/CD automationScripts to automate compilation and deployment of maven artifacts and docker containers

ONAP gerrit

ONAP Jenkins

Sub-Components

Subcomponents of each ONAP project may be found on the Resources and Repositories page on this wiki.  Please see the CCSDK section of that page for subcomponent list of CCSDK.

Architecture

High level architecture diagram

CCSDK is delivered as a set of libraries accessible as Maven dependencies, as well as a set of base Docker containers. The docker containers themselves are intended to be used by other projects as a basis for their own controller-specific docker containers.

The following diagram illustrates how CCSDK is used by the controller projects:

Platform Maturity

Please fill out the centralized wiki page: Guilin Release Platform Maturity


API Incoming Dependencies


API NameAPI DescriptionAPI Definition DateAPI Delivery dateAPI Definition link (i.e.swagger)
A&AI : schemasA&AI schemas used by CCSDK aaa-service moduleDefined in seed codeIncluded in seed codeTBD
SDC : distribution clientAPI used by ueb-listener (in CCSDK sdnc-northbound repo) to receive artifacts from SDCDefined in seed codeIncluded in seed codeTBD


API Outgoing Dependencies


API NameAPI DescriptionAPI Definition DateAPI Delivery dateAPI Definition link (i.e.swagger)
Maven librariesLibraries used as dependencies by SDN-C, APP-C, DCAE and OOMIncluded in seed codeDelivered in seed codeJavadoc will be provided
Docker containersBase docker containers will be provided which can be used by SDN-C and APP-C as a basis for their docker containersIncluded in seed codeDelivered in seed code

Third Party Products Dependencies

NameDescriptionVersion
OpenDaylightOpenDaylight SDN Controller PlatformSodium SR3

Testing and Integration Plans

Provide a description of the testing activities (unit test, functional test, automation,...) that will be performed by the team within the scope of this release.

Describe the plan to integrate and test the release deliverables within the overall ONAP system.
Confirm that resources have been allocated to perform such activities.

Gaps

This section is used to document a limitation on a functionality or platform support. We are currently aware of this limitation and it will be delivered in a future Release.
List identified release gaps (if any), and its impact.

Gaps identifiedImpact
To fill outTo fill out

Known Defects and Issues

Please refer to

Risks

List the risks identified for this release along with the plan to prevent the risk to occur (mitigation) and the plan of action in the case the risk would materialized (contingency).

Please update any risk on the centralized wiki page - Guilin Risks

Resources

Fill out the Resources Committed to the Release centralized page.

Release Milestone

The milestones are defined at the Release Level and all the supporting project agreed to comply with these dates.

Team Internal Milestone


MilestoneDescription DateComments
M2/M3Functionality Freeze / API Freeze


  • Final API definitions (swagger, Yang) due
July 3, 2020Last day to submit Guilin swagger / Yang changes to Gerrit

  • M2/M3 Jiras ready for review
Aug 3, 2020Release manager reviews worksheets to assess readiness for M2/M3 milestone

  • M2/M3 Milestone
Aug 6, 2020


M4Code Freeze


  • Code due for Frankfurt user stories
Sept 4, 2020Last day to submit Frankfurt code changes to Gerrit

  • M4 worksheets ready for review
Sept 7, 2020

Release manager reviews worksheets to assess readiness for M4 milestone, including the following checks:

  • All repos must have >= 55% code (line) coverage in Sonar
  • No failed Jenkins jobs
  • All CSIT tests pass
  • Healthchecks pass

  • M4 release builds available
Sept 7, 2020

  • M4 Milestone
Sept 10, 2020


RC0Release Candidate 0


  • Code due for RC0 fixes
Sept 25, 2020Last date to submit code fixes for release candidate 0

  • RC0 release artifacts available
Sept 28, 2020

  • RC0 Jiras ready for review
Sept 28, 2020

  • TSC RC0 approval vote
Oct 1, 2020


RC1Release Candidate 1


  • Code due for RC1 fixes
Oct 9, 2020Last date to submit code fixes for Frankfurt release candidate 1

  • RC1 release artifacts available
Oct 12, 2020

  • RC1 Jiras ready for review
Oct 12, 2020

  • TSC RC1
Oct 15, 2020


RC2Release Candidate 2


  • Code due for final Frankfurt fixes
Oct 23, 2020Last date to submit code fixes for final Frankfurt release (RC2)

  • RC2 release artifacts available
Oct 26, 2020

  • RC2 Jiras ready for review
Oct 26, 2020

  • TSC RC2
Oct 29, 2020


Release Sign-OffFinal TSC Sign-OffMay 7, 2020
Frankfurt Release Sign-Off

Documentation, Training

Please update the following centralized wiki: Frankfurt Documentation

That includes

  • Team contributions to the specific document related to he project (Config guide, installation guide...).
  • Team contributions to the overall Release Documentation and training asset
  • High level list of documentation, training and tutorials necessary to understand the release capabilities, configuration and operation.
  • Documentation includes items such as:
    • Installation instructions
    • Configuration instructions
    • Developer guide
    • End User guide
    • Admin guide
    • ...

Note

The Documentation project will provide the Documentation Tool Chain to edit, configure, store and publish all Documentation asset.


Other Information

  • Vendor Neutral

If this project is coming from an existing proprietary codebase, ensure that all proprietary trademarks, logos, product names, etc. have been removed. All ONAP deliverables must comply with this rule and be agnostic of any proprietary symbols.

  • Free and Open Source Software

FOSS activities are critical to the delivery of the whole ONAP initiative. The information may not be fully available at Release Planning, however to avoid late refactoring, it is critical to accomplish this task as early as possible.
List all third party Free and Open Source Software used within the release and provide License type (BSD, MIT, Apache, GNU GPL,... ).
In the case non Apache License are found inform immediately the TSC and the Release Manager and document your reasoning on why you believe we can use a non Apache version 2 license.

Each project must edit its project table available at Project FOSS.


Charter Compliance

The project team comply with the ONAP Charter.

  • No labels