| Project Name | Project Tech. Lead | M0 Kick-Off/Intention Submission | M1 Planning | M2 Functionality freeze | M3 API Freeze | M4 Code Freeze | RC0 Release Candidate 0 | RC1 Release Candidate 1 | RC2 Release Candidate 2 | Sign-Off Release Delivery |
---|
1 | A & AI | | Dec 3, 2018 | AAI R4 M1 Release Planning AAI R4 M1 Deliverables for Planning Milestone Checklist | AAI R4 M2 Deliverables for Functionality Freeze Milestone Checklist | | | AAI R4 Deliverables for RC0 Milestone Checklist | AAI R4 Deliverables for RC1 Milestone Checklist 4 Docs jiras - recently updates
| AAI R4 Deliverables for RC2 Milestone Checklist
Docs in process | AAI R4 Deliverables for Release Sign-Off Milestone Checklist |
2 | Application Authorization Framework | | Dec 3, 2018 | AAF R4 - M1 Release Plan AAF R4 - M1 Milestone Checklist | AAF R4 - M2 Functionality Freeze Milestone Checklist Condition: aaf-authz @55% by M3
| AAF R4 -M3 Deliverables for API Freeze Milestone Checklist Conditions: Obtain coverage goal by M4 - Failing Sonar coverage: aaf-authz Need to update the checklist including Modeling Checklist item Inprocess Gerrit: https://gerrit.onap.org/r/#/c/78520/ https://gerrit.onap.org/r/#/c/79224/ | AAF R4 - M4 Deliverable for Code Freeze Milestone Checklist | AAF R4 (Dublin) - RC0 Milestone Checklist
TSC waiver for Dublin release sought: Sonar goal miss: aaf-authz
| AAF R4 - RC1 Milestone Checklist
TSC waiver for Dublin release sought: Sonar goal miss: aaf-authz
| AAF R4 - RC2 Milestone Checklist
TSC Waiver for Sonar granted | AAF R4 Deliverables for Release Sign-Off Milestone Checklist |
3 | APPC | | Yes, per default | APPC Dublin M1 Release Planning APPC Dublin M1 Checklist APPC Dublin M1 Security Checklist | APPC Dublin M2 Functionality Freeze Checklist | APPC Dublin M3 Deliverables for API Freeze Milestone Checklist Template
| APPC Dubin M4 Code Freeze Milestone Checklist Template
| APPC Dublin RC0 Milestone Checklist Template
| APPC Dublin RC1 Milestone Checklist Template
2 high/highest - no update in last week | | |
4 | CLAMP | | Yes, per default | CLAMP R4 - M1 Release Planning CLAMP R4 - M1 Deliverables for Planning Milestone Checklist | CLAMP R4 - M2 Functionality Freeze Milestone Checklist | CLAMP R4 - M3 Deliverables for API Freeze Milestone Checklist
Checklist complete - no swagger API doc | | CLAMP R4 - RC0 Milestone Checklist | CLAMP R4 - RC1 Milestone Checklist | CLAMP R4 - RC2 Milestone Checklist
| CLAMP R4 - Deliverables for Release Sign-Off Milestone Checklist |
5 | Common Controller SDK | | Yes, per default | CCSDK : Dublin: Release Planning CCSDK : Dublin M1 : Deliverables for Planning Milestone | CCSDK : Dublin M2 : Functionality Freeze Milestone Checklist Condition: All repos unit test coverage > 55% by M3 | CCSDK : Dublin M3 : API Freeze Milestone Checklist Conditions: Unmet Sonar goal: passes as of 2019-04-09
| | | CCSDK : Dublin RC1 : Deliverables for RC1 Milestone Checklist |
| |
6 | DCAE | | Dec 5, 2018 | DCAE R4 M1 Release Planning DCAE R4 M1 Milestone Checklist | DCAE R4 M2 Functionality Freeze Milestone Checklist | DCAE R4 M3 Deliverables for API Freeze Milestone Checklist Waiver requested, defer coverage goal (55%) for several items until M4: dcaegen2-collectors-restconf dcaegen2-collectors-snmptrap dcaegen2-platform-inventory-api | | DCAE R4 RC0 Milestone Checklist
| DCAE R4 RC1 Milestone Checklist 1 Doc Jira Ticket | | |
7 | DMaaP | Mandar Sawant | Yes, per default | DMaaP R4 - M1 Release Planning DMaaP R4 - M1 Milestone Checklist | DMaaP R4 - M2 Functionality Freeze Milestone Checklist Condition: All repos unit test coverage > 55% by M3, non-root post Dublin | DMaaP R4 - M3 API Freeze Milestone Checklist Gerrit- Review https://gerrit.onap.org/r/#/c/79574/ Modeling request for data model: "waiting on modeling team." | DMaap R4 - M4 Code Freeze Milestone Checklist Swagger docs by RC2 | DMaaP R4 - RC0 Milestone Checklist
| DMaaP R4 - RC1 Milestone Checklist | DMaaP R4 - RC2 Milestone Checklist | 8 |
| DMaaP R4 - Release Sign-Off Milestone Checklist Template |
8 | Documentation | | Yes, per default | Planning worksheet M1 Documentation Dublin Release | MS2 Deliverables for Functionality Freeze Milestone Checklist Template Condition: Followup to document the doc deliverables overtime so that rel_mgmt can support the deliverables | Moving to weekly documentation report... no checklist
|
|
|
|
|
|
9 | External API Framework | | Dec 5, 2018 | Planning worksheet M1 Checklist | | [ExtAPI] Dublin M3 API Freeze Milestone Checklist
| ExtAPI Dublin M4 Code Freeze Milestone Checklist Project needs help getting signed certificates | ExtAPI Dublin RC0 Checklist
| [ExtAPI] Dublin RC1 Checklist 2x Doc Jira Tickets | [ExtAPI] Dublin RC2 Checklist
| External API Deliverables for Dublin R4 Release Sign-Off Milestone Checklist |
10 | Holmes | | Dec 3, 2018 | Holmes Release Planning for Dublin Holmes Deliverables for Planning Milestone Checklist for Dublin | Holmes Deliverables for Functionality Freeze Milestone Checklist for Dublin Condition: holmes-common @55% by M3 (TBC) Non-root by 2019-02-28 | Holmes Deliverables for API Freeze Milestone Checklist for Dublin
| Holmes Deliverables for Code Freeze Milestone Checklist Template for Dublin
Moving some stories to next release due to lack of resource. No impact existing func. | Holmes Deliverables for RC0 Milestone for Dublin
| Holmes Deliverables for RC1 Milestone for Dublin | Holmes Deliverables for RC2 Milestone for Dublin | Holmes Deliverables for Release Sign-Off Milestone Checklist for Dublin |
11 | Integration Project | | Yes, per default | Integration Dublin M1 Deliverables for Planning Milestone Checklist | Integration Dublin M2 Deliverables for Functionality Freeze Milestone Checklist Provide status on the plan to close the blocker(s). | Integration Dublin M3 Deliverables for API Freeze Milestone Checklist Need to understand if Integration has sufficient lab capacity for Dublin and a quick to follow maintenance release. | Integration Dublin M4 Deliverable for Code Freeze Milestone Checklist | Integration Dublin RC0 Milestone Checklist
| Integration Dublin RC1 Milestone Checklist | Integration Dublin RC2 Milestone Checklist | Integration R4 Deliverables for Release Sign-Off Milestone Checklist | Some docs still in process
|
12 | Logging Enhancements Project Including POMBA | | Nov 16, 2018 | Logging Dublin M1 Release Planning Logging Dublin Deliverables for Planning Milestone Checklist | Logging Dublin M2 Deliverables for Functionality Freeze Milestone Checklist | Logging Dublin M3 Deliverables for API Freeze Milestone Checklist Template Checklist complete. No swagger API data | Logging Dublin M4 Deliverable for Code Freeze Milestone Checklist Template | Logging Dublin RC0 Deliverables for RC0 Milestone Checklist
| Logging Dublin RC1 Deliverables for RC1 Milestone Checklist
| Logging Dublin RC2 Deliverables for RC2 Milestone Checklist POMBA docs | Logging Dublin Deliverables for Release Sign-Off Milestone Checklist Template
|
13 | Microservices Bus | | Nov 30, 2018 | MSB Release Planning for Dublin MSB Deliverables for Planning Milestone Checklist for Dublin | MSB Dubin Deliverables for Functionality Freeze Milestone Checklist-M2 | MSB Deliverables for API Freeze Milestone Checklist for Dublin
| | MSB Deliverables for RC0 Milestone for Dublin | MSB Deliverables for RC1 Milestone for Dublin | MSB Deliverables for RC2 Milestone for Dublin | 14 | Modeling | Hui MSB Deliverables for Release Sign-Off Milestone Checklist for Dublin |
14 | Modeling | | Dec 3, 2018 | Modeling Dublin Planning Modeling Dublin Deliverables for Planning Milestone Checklist | Modeling Dublin Deliverables for Functionality Freeze Milestone Checklist Condition: unit test coverage > 55% by M3 | Modeling Dublin Deliverables for API Freeze Milestone Checklist Condition: meet 55% coverage goal by M4 Sonar reporting warning: modeling-toscaparsers-javatoscachecker | | Modeling Dublin Deliverables for RC0 Milestone Checklist
| Modeling Dublin Deliverables for RC1 Milestone Checklist | Modeling Dublin Deliverables for RC2 Milestone Checklist | Modeling Dublin Deliverables for Release Sign-Off Milestone Checklist Template |
15 | Multi VIM/Cloud | | Dec 3, 2018 | MultiCloud Dublin Release Planning Deliverables for Planning Milestone Checklist | Deliverables for Functionality Freeze Milestone Checklist - Conditions: Get all remaining unit test code coverage > 55% by M3
- Plan to design container(s) as non-root: M3 Dublin
| MultiCloud R4 Deliverables for API Freeze Milestone Checklist Conditional: Need to add Modeling checklist item Review gerrit (stale merges) https://gerrit.onap.org/r/#/c/76324/ https://gerrit.onap.org/r/#/c/75851/ | MultiCloud R4 Deliverable for Code Freeze Milestone Checklist | MultiCloud Deliverables for RC0 Milestone Checklist
TSC waiver for Dublin release sought: Sonar multicloud-azure below target | MultiCloud R4 Deliverables for RC1 Milestone Checklist TSC waiver for Dublin release sought: Sonar multicloud-azure below target | | |
16 | MUSIC | | Yes, per default | MUSIC Dublin Release Planning MUSIC Dublin M1 Deliverables for Planning Milestone Checklist | MUSIC Dublin M2 Deliverables for Functionality Freeze Milestone Checklist Template Condition: unit test coverage > 55% by M3. | MUSIC Dublin M3 Deliverables for API Freeze Milestone Checklist
| MUSIC Dublin M4 Code Freeze Milestone Checklist | MUSIC Dublin RC0 Milestone Checklist
| https://wikilf-onap.onapatlassian.orgnet/wiki/display/DW/MUSIC+Dublin+RC1+Milestone+Checklist | MUSIC Dublin RC2 Milestone Checklist
| MUSIC Dublin Deliverables for Release Sign-Off Milestone Checklist |
17 | ONAP CLI | | Dec 3, 2018 | Dublin-M1-CLI Deliverable Dublin-M1-CLI Release planning | Dublin-M2-Checklist | Dublin-M3 checklist Need to update the checklist including Modeling and additional Integration Checklist item | Dublin M4 Code Freeze Milestone Checklist | Dublin-RC0 Milestone Checklist
| Dublin-RC1 Milestone Checklist Old version in Dublin - Jira Legacy |
---|
server | System Jira |
---|
serverId | 4733707d-2057-3a0f-ae5e-4fd8aff50176 |
---|
key | CLI-168 |
---|
|
| Dublin-RC2 Milestone Checklist | Dublin-Release Sign-Off |
18 | ONAP Operations Manager | | Dec 3, 2018 | OOM - Deliverables for Planning Milestone Checklist OOM Dublin Release Planning Template | OOM Dublin - M2 Functionality Freeze Milestone Checklist
| OOM Dublin - M3 API Freeze Milestone Checklist
| | OOM Dublin - RC0 Milestone Deliverables Checklist
| OOM Dublin - RC1 Milestone Deliverables Checklist
| |
|
19 | ONAP Optimization Framework | | Dec 3, 2018 | OOF Dublin M1 Deliverables for Planning Milestone Checklist OOF Dublin M1 Release Planning | OOF Dublin M2 Functionality Freeze Milestone Checklist Condition: unit test coverage > 55% by M3 | OOF Dublin M3 Deliverables for API Freeze Milestone Checklist Checklist complete. Conditional: Complete unit test coverage goal by M4 for HAS and CMSO OOM-CSIT BY M4 | | OOF Dublin RC0 Milestone Checklist | | OOF Dublin RC2 Milestone Checklist
Doc completion risk - focus on release notes & install docs | | Docs in process |
20 | ONAP Usecase UI | | Yes, per default | Usecase-UI Beijing Release Planning Dublin Release M1 Deliverables for Planning Milestone Checklist | UUI Dublin M2 Functionality Freeze Milestone Checklist | Dublin Release M3 Deliverables for API Freeze Milestone Checklist
| UUI Dublin M4 Code Freeze Milestone Checklist
| Dublin Release Deliverables for RC0 Milestone Checklist
| Dublin Release Deliverables for RC1 Milestone Checklist 2x Doc Jira Tickets | Jira Legacy |
---|
server | System Jira |
---|
columns | key,summary,type,created,updated,due,assignee,reporter,priority,status,resolution |
---|
serverId | 4733707d-2057-3a0f-ae5e-4fd8aff50176 |
---|
key | USECASEUI-194 | Documentation:
Jira Legacy |
---|
server | System Jira |
---|
columns | key,summary,type,created,updated,due,assignee,reporter,priority,status,resolution |
---|
serverId | 4733707d-2057-3a0f-ae5e-4fd8aff50176 |
---|
key | USECASEUI-193 |
---|
|
| | 21 | Policy Framework | | Dec 3, 2018 | Policy R4 Dublin M1 Release Planning Policy R4 Dublin M1 Deliverables for Planning Milestone Checklist Template | Policy R4 Dublin M2 Deliverables for Functionality Freeze Milestone Checklist Template | Policy R4 Dublin M3 Deliverables for API Freeze Milestone Checklist Template
| Policy R4 Dublin M4 Deliverable for Code Freeze Milestone Checklist Template
| Policy R4 Dublin RC0 Deliverables for RC0 Milestone Checklist Template
P-W testing | Policy R4 Dublin RC1 Deliverables for RC1 Milestone Checklist Template 1xDoc Jira Ticket | | | Docs in process
|
22 | Portal Platform | | Nov 30, 2018 | Portal R4 M1 Release Planning (Dublin Release) Portal R4 M1 Deliverables for Planning Milestone Checklist (Dublin Release) | Portal R4 M2 Deliverables for Functionality Freeze Milestone Checklist Dependency on OOM for non-root testing; other dependencies articulated in the risks | Portal R4 M3 Deliverables for API Freeze Milestone Checklist Need to update the checklist including Integration & Modeling Checklist items
| Portal R4 M4 for Code Freeze Milestone Checklist
| Portal R4 RC0 Milestone Checklist
| | | |
23 | SDN-C | | Yes, per default | SDNC : Dublin: Release Planning SDNC : Dublin M1 : Deliverables for Planning Milestone | SDNC : Dublin M2 : Functionality Freeze Milestone Checklist | | | SDNC : Dublin RC0 : Deliverables for RC0 Milestone Checklist
Update certificate in RC1 | SDNC : Dublin RC1 : Deliverables for RC1 Milestone Checklist 2 high in Submitted state Certificate is updated | | |
24 | Service Design & Creation | | Dec 4, 2018 | SDC R4 Release Planning SDC R4 Deliverables for Planning Milestone Checklist | SDC R4 Deliverables for Functionality Freeze Milestone Checklist Condition: unit test coverage > 55% by M3 | | SDC R4 Deliverable for Code Freeze Milestone Checklist
| SDC R4 Deliverables for RC0 Milestone Checklist
Sonar below goal: sdc master | SDC R4 Deliverables for RC1 Milestone Checklist Waiver requested: Sonar below goal: sdc master
| | |
25 | Service Orchestrator | | Dec 2, 2018 | SO Dublin M1 Release Planning SO Dublin M1 Checklist | Service Orchsttrator M2 Checklist | | | SO Dublin RC0: Deliverables for RC0 Milestone Checklist Template
| SO Dublin RC1 Milestone Checklist Template4 high/highest defects | | |
26 | VF-C: Virtual Function Controller | | Dec 2, 2018 | VF-C Dublin M1 Release Planning VF-C Dublin: Deliverables for Planning Milestone Checklist | VF-C Dublin: Deliverables for Functionality Freeze Milestone Checklist Template | | | VF-C Dublin: Deliverables for RC0 Milestone Checklist Template
DEPRECATED: Sonar warning (46%) on vfc-nfvo-driver-vnfm-svnfm-nokia-vnfmdriver | VF-C Dublin: Deliverables for RC1 Milestone Checklist Template | VF-C Dublin: Deliverables for RC2 Milestone Checklist Template
| VF-C Dublin: Deliverables for Release Sign-Off Milestone Checklist Template |
27 | VID project | | Dec 4, 2018 | VID R4 M1 Release Planning VID R4 M1 Deliverables for Planning Milestone Checklist | VID R4 M2 Deliverables for Functionality Freeze Milestone Checklist | VID R4 M3 Deliverables for API Freeze Milestone Checklist Missing swagger API info In -process Integration blockers: Jira Legacy |
---|
server | System Jira |
---|
serverId | 4733707d-2057-3a0f-ae5e-4fd8aff50176 |
---|
key | VID-429 |
---|
|
Jira Legacy |
---|
server | System Jira |
---|
serverId | 4733707d-2057-3a0f-ae5e-4fd8aff50176 |
---|
key | VID-443 |
---|
|
| VID R4 M4 Deliverable for Code Freeze Milestone Checklist
| VID R4 RC0 Milestone Checklist | VID R4 RC1 Milestone Checklist
| VID R4 RC2 Milestone Checklist | | Integration testing in process - no dependencies on VID |
28 | VNF SDK | | Dec 2, 2018 | VNF SDK Dublin Release Planning (M1) VNF SDK Deliverables for Planning Milestone Checklist Template(M1) | VNFSDK Dublin M2 Deliverables for Functionality Freeze Checklist Conditional: Unit test coverage by M3 | VNF SDK Dublin API Freeze(M3) Unit test coverage low: VNFSDK refrepo: 52.3% now is 55.3%
| VNF SDK Dublin Code Freeze (M4)
| Dublin VNFSDK RC0 Checklist - Release Candidate 0 Milestone | Dublin VNFSDK RC1 Checklist - Release Candidate 1 Milestone | Dublin VNFSDK RC2 Checklist - Release Candidate 2 Milestone | |
29 | VNF Requirements | | Nov 16, 2018 | Dublin Release Plan for VNFRQTS M1 Deliverables for Planning Milestone Checklist Template | M2 Deliverables for Functionality Freeze Milestone Checklist VNFRQTS | M3 Deliverables for API Freeze Milestone Checklist | M4 Deliverable for Code Freeze Milestone Checklist VNFRQTS | RC0 Milestone Checklist Template - VNFRQTS
| RC1 Milestone - Checklist VNFRQTS | RC2 Milestone checklist VNFRQTS | signoff checklist |
30 | VNF Validation (VVP) | | Nov 16, 2018 | Dublin Release Plan for VVP M1 Deliverables for Planning Milestone Checklist Template | M2 Deliverables for Functionality Freeze Milestone Checklist Template
| M3 Deliverables for API Freeze Milestone Checklist Template | M4 Code Freeze Milestone Checklist Template for VVP | RC0 Milestone Checklist - VVP
| RC1 Milestone Checklist -VVP | RC2 Milestone checklist VVP | Signoff |