R8 Honolulu Use Cases & Requirements



The following page describes the major use cases and key requirements targeted to the Honolulu Release

HISTORY OF USE CASE PORTAL PAGES

RELEASE

WIKI PAGE

RELEASE

WIKI PAGE

R6 Frankfurt Release Use Case Portal

Release 6 (Frankfurt) proposed use cases and functional requirements

R7 Guilin Release Use Case Portal

Guilin (R7) - Use Cases (and Requirements in Use Cases)

Use Case Realization R6 Portal Page

Release 6 (Frankfurt) proposed use cases and functional requirements

Use Case Realization R6 Portal Page

Use Case Realization Meeting Register MoM



5G USE CASES & REQUIREMENTS IN R8 (HONOLULU)

5G Use Case Team (Monthly) Meeting Notes & recordings: 5G Use Case Team Meetings

USE CASE / REQUIREMENT

DESCRIPTION

WIKI LINK

USE CASE / REQUIREMENT

DESCRIPTION

WIKI LINK

5G Service Modeling

Defining and modeling a 5G Service (in Design Time) and the associated Modeling (Platform information & data model). This is driven by 3GPP TS28.540 and TS28.541, the 5G NRM. Development of a concept of a Registry Service used in CPS

R8 5G Service Modeling

5G SON Use Case

Optimization and SON functions for 5G RAN which provide for self-optimization, self-healing and self-configuration

R8 5G SON use case

ONAP/3GPP & O-RAN Alignment: Standard Defined VES

The capability to receive, validate and process standards defined notifications encapsulated in VES events in ONAP. VES 7.2

R8 ONAP/3GPP & O-RAN Alignment: Standard Defined VES

End to End Network Slicing

5G Network Slicing defines slices to be used in 5G RAN systems. Network Slicing is a long-lead multi-release development.

R8 E2E Network Slicing use case

Smart Operator Intent Translation in UUI based on IBN - R8 5G Slicing Support

A lightweight and high-cohesion Nature Language Processing (NLP) function is proposed to add in the UUI project, in order to translate the network operation engineers’ text/voice intents to the suitable slicing parameters quickly and decrease the manual configurations.

Smart Operator Intent Translation in UUI based on IBN - R8 5G Slicing Support

Support for Vertical Industry

Support for Vertical Industry. Intent framework is a system that helps to implement and operate networks that can improve network availability and agility. It takes a high-level business goal (intent) as input, converts it to the necessary network configurations and applies the network changes via network automation and/or network orchestration. Continuously monitoring the status of the network under control, the system validates in real time that the intent is being met, and can take corrective actions when desired intent is not met.

Support for Vertical Industry

Intent Based Networking

Support for Intent Framework and Intent Modeling. (add description)

Support for Intent Framework and Intent Modeling

ONAP/3GPP & O-RAN Alignment: A1 Adapter and Policy Management Extension

A1 Adapter and Policy Management Extension.

This requirement enhances the A1 interface capabilities provided in Rel 6 as part of  5G/ORAN & 3GPP Standards Harmonization requirement ( REQ-38) and extended in Rel 7 with the introduction of A1 policy management.   O-RAN has defined A1 interface specification in the context of the management of 5G RAN elements to provide intent based policies for optimization of the RAN network performance. Planned enhancements for Rel 8 include support of new A1 interface version in alignment to O-RAN alliance and common logging/audit.

O-RAN A1 Policies in ONAP  (Overall)

R8 A1 Adapter and Policy Management Extension (Honolulu)















MAJOR USE CASES & REQUIREMENTS IN R8 (HONOLULU)

USE CASE / REQUIREMENT

DESCRIPTION

WIKI LINK

USE CASE / REQUIREMENT

DESCRIPTION

WIKI LINK

PNF Plug and Play

The PNF Plug and Play Use Case allows a PNF to register with ONAP using a pnfRegistration VES Event. This is expected to be used for installation & commissioning a network that is to be managed by ONAP. When this event is received, the PNF Registration Handler (PRH) processes this event to complete the registration by updating the corresponding A&AI entry for the expectant PNF. The PRH was developed specifically for this use case. Once registered, ONAP can interoperate with the PNF and perform LCM or FCAPS (OA&M) operations in addition to other actions. This Use Case was originally started in in R2 Beijing and functionality has been continually improved since then.

R8 PNF Plug and Play Use Case

Certificate Management Protocol v2

The Certificate Management Protocol (CMP) is an Internet protocol used for obtaining X.509 digital certificates in a public key infrastructure (PKI). It is described in RFC 4210 and is one of two protocols so far to use the Certificate Request Message Format (CRMF), described in RFC 4211, with the other protocol being Certificate Management over CMS (CMC), described in RFC 5273. An obsolete version of CMP is described in RFC 2510, the respective CRMF version in RFC 2511. CMP messages are encoded in ASN.1, using the DER method and usually transported over HTTP. CMP (Certificate Management Protocol) Server & Client (completed in R6)

R8 Certificate Management Protocol

Configuration Persistence Service

The Configuration Persistence Service is a Common Data Layer Service providing database functionality to persist network element run-time information. CPS will perform key DB operations such as syncing data with xNFs. CPS enables OSS configuration, optimization and E2E LCM operations. It will be a new Platform Component in R8.

Team meeting page: Configuration Persistence Service Meeting Notes & Recordings

Configuration Persistence Service (CPS) for R8 Honolulu

ETSI Alignment

ETSI Alignment Use Case

R8 ETSI Alignment

xNF Software Upgrade

PNF Software Upgrade enhancement

In Rel 6 (REQ-84) and Rel 7 (REQ-324), PNF sw upgrade requirement in ONAP has progressed covering both with/without schema updates. A schema update in relation to a xNF software upgrades is a routine for network upgrade to support new xNF features, improve efficiency or increase xNF capacity on the field, and to  eliminate bugs.  This use case provides to ONAP an advantage in orchestrating and managing the Life Cycle of a Network Services in-line with business and service objectives. In Rel 8, the feature will be enhanced with PNF sw version management during sw upgrade procedure.



Bulk PM/ PM Data Control

Bulk PM / PM Data Control Improvements
PM data collection control provides 5G network operators with a dynamic and more efficient way to configure performance measurement collection on a selected subset of  PNFs/VNFs in the network and complements the existing PM data collection and processing capabilities in ONAP/DCAE. An initial version has been delivered in Rel 6 (REQ-129) then enhanced in Rel 7 (REQ-381). Planned enhancements for Rel 8 intend to improve the (PMSH) subscription management about subscription update.











SUPPORTING DOCUMENTATION & PRESENTATION

Description

File or Wiki Link

Description

File or Wiki Link











OVERVIEWS, DEMOS & SLIDES

The following are Links to Overviews, Demos and Summary Slides for each of the major use cases:

USE CASE

OVERVIEW & SUMMARY SLIDES

RECORDING & DEMOS

General ONAP Use Cases Overview

Overview Slides: ONAP-UseCaseOverview_202103Mr08v2BenC.pdf

Overview slides for All ONAP Major Use Cases

R8 Use Cases Overview

Overview Slides: R8-PnP_IPv4v6_CMPv2_StndDefVES-202010Oc12.pdf

R8 Overview slides for selected Use Cases

OOF SON PCI

Overview Slides: ONAP_OOF_SON_R7_Scope_2020_09_16.pptx



Use Case Realization Call: June 17, 2020

5G SERVICE MODELING

Overview Slides: R8-5GServiceCreation_2020Sp14v5.pdf



R8_5GServiceModeling_202008Ag31.mp4

ONAP/ORAN 3GPP STNDDEF VES

Overview Slides: vF2F stndDefined Event in ONAP 2020-06-24 v3.pptx

vDDF Feb 3, 2021 : LFN-ONAP-vF2F-VES_OPENAPI_MANAGER.pptx



202101Fb03ONAPORANHarmonizationStndDefVES.mp4

202101Fb03ONAPORANHarmonizStndDefVES_audio.m4a

ONAP/ORAN 3GPP A1 POLICY

Overview Slides: 20200624 LFN DTF ONAP-A1 Adaptor JohnKeeney.pdf





E2E NETWORK SLICING

Overview Slides: ONAP_E2E_Network_Slicing_slides.pptx



Use Case Realization Call: April 01, 2020

vDDF Oct 13, 2020 

E2E_Network_Slicing_use_case_Oct_13.mp4

BULK PM: PM CONTROL

Overview Slides:





PNF PLUG AND PLAY

Overview Slides: PNFPlugnPlayR7GuiLin_09Sp242020v13.pdf



Use Case Realization Call: February 19, 2020

xNF (PNF/VNF) SOFTWARE UPGRADE

Overview Slides: PNF SoftwareUpgrade Schema update to ONAP Arch.pdf

Mar 22, 2021 : 202103Mr22_xNFSoftwareUpdatetoONAP.pdf



202103Mr22-xNFSoftwareUpgrade-video.mp4

202103Mr22-xNFSoftwareUpgrade-audio.m4a

CONFIG & PERSIST SERVICE

Overview Slides: ConfigurationPersistencySvcDDF_10Jy2020v8a.pdf

Overview Slides in DDF: ConfigurationPersistenceSvcDDF_202010Oc15v13.pdf



Use Case Realization Call: May 27, 2020

Demo at DDF Oct 15, 2020 :

202010Oc15-CPSDDF_Talk-Demo.mp4

202010Oc15-CPSDDF_Talk-DemoAudio.m4a

CMP v2

Overview Slides: PNF Registration Enhancements for Security v1.pptx

Overview Slides Mar 8, 2021: 202103Mr08-UCR Presentation CMPv2.pptx



202103Mr08-UCRCMPv2Video.mp4

202103Mr08-UCRCMPv2Audio.m4a

LICENSING MANAGEMENT

Overview Slides: ONAP license mgmt - ArchCom Guilin - 202005My26.pptx



Use Case Realization Call: September 4, 2019

MDONS

Overview Slides: MDONS_ONAP_R6_XinMiao-updt.pptx



Use Case Realization Call: December 04, 2019

ETSI ALIGNMENT

Overview Slides: Guilin ETSI-Alignmentv1.pdf



Use Case Realization Call: Oct 21, 2020

INTENT BASED NETWORKING

Overview Slides: 20210208_Intent Framework and Intent Modeling_UCRealization.pdf

Use Case Realization Call: Feb 8, 2021

202102Fb08-IntentBasedNtwkUseCase_Video.mp4

202102Fb08-IntentBasedNtwkUseCaseAudio.m4a

VERTICAL INDUSTRY MANAGEMENT

Overview Slides: ONAP R8 PoC Support for Vertical Industry_202101Ja14.pdf

Use Case Realization Call: Jan 14, 2020

CCVPN

Overview Wiki: CCVPN Use Case (Dublin)



Broadband Service Use Case

Overview Wiki: BBS Broadband Service Use Case (Dublin)



5G NRM Network Resource Model

Overview Wiki: 5G Network Resource Model (NRM) Configuration in R6 Frankfurt



USEFUL LINKS

The following table has useful links:

REFERENCE LINK

WIKI URL

Use Case Way of Working

ONAP Use Case / Requirements Teams Process Way of Working (WoW)

Architecture Way of Working

ONAP Architecture Team Process - Old

Modeling Way of Working

Proposed ONAP Release Process Updates for Information and Data Modeling

R7 Requirements Proposal Page

Guilin release - functional requirements proposed list

R8 Requirements Proposal Page

Honolulu release - functional requirements proposed list

Business Driver Template

Business Driver Template for Use Cases

Use Case Template (R8 Use Case Template)

R8 Use Case

R7 MODELING Planning Page

ONAP R7 Modeling High Level Requirements

R8 MODELING Planning Page

ONAP R8 Modeling High Level Requirements

MODELING Generic Information Element Template

Generic Information Element Template

MODELING CURRENT ACTIVITY STATUS

Modeling Current Activity Status

ARCHITECTURE Review Template

R7 Guilin Architecture Review (template) - functional requirements

ARCHITECTURE Review Process

Project Architectural Review Requirements and Process (Draft)

ONAP Project & Component Lifecycle

ONAP Project and Component Lifecycle

Release Planning R8

Release Planning: Honolulu

REQ-1

REQ-1 - ONAP Requirement Template To Do

R7 Release Tracking Page Jira Dashboard

Guilin Release Requirements

R8 Release Tracking Page Jira Dashboard -

Project Status in Honolulu Release

R8 Jira Dashboard

Honolulu Release Requirements

R7 Use Case Realization MOM

R7 Use Case Realization Meetings MoM

R6 Use Case Realization MOM

Release 6 (Frankfurt) proposed use cases and functional requirements

ONAP Calendar

https://lists.onap.org/groups