Please find below the Minutes of Meetings and recording for the SECCOM meeting that was held on 26th of May 2020.
Jira No | Summary | Description | Status | Solution |
---|---|---|---|---|
| SECCOM Non functional requirements for Guilin release | Wiki to be updated by each requirement leader by 27th of May. Additionally Jira requirement Epics will have to be created. Java and Python upgrades were putted in the separate requirements.. Following the SECCOM meeting on 17th of March we agreed on the following draft requirement:
All logs from applications should be stored in STDOUT. 3 kind of logs: debug, regular and auth. They have different types of information. For centralized logs collection STDOUT might not be sufficient, so there should be continuation from there to some external system. Natural channel would be syslog and then to send it somewhere else. | Ongoing | Natacha to add Fabian;s requirements. Krzysztof and Tony to update theirs as well. |
| Synch with Architecture Subcommittee. | No presentation scheduled this week at the Architecture Subcommitteee meeting for Service Mesh PoC. |
|
|
| Security Guideline Documentation | Hrarald is very occupied. and proposed to run meeting once content update is possible. |
|
|
| CII Badging requirement | Tony shared REQ-223 from Frankfurt release. Assurance case. Built on top of other security requirements. Documentation security is one of the basis - what consumer of the project may or may not expect from the project. Assurance case takes basic requirements and presents in a way: this is how we implement it , in other words: what shouldhappen, it does happen. AAF is a good example. Thanos is applicable to many ONAP projects. We shoud have a general document on ONAP security within next few months. Distinction between run and design time. In the run time a lot of discussion within ONAP. In the design time which is very project specific they need to share what they did. 3 types of ONAP applications:
So we have 3 groups of documentations, where most of the stuff will be common. |
|
|