DCAE R10 Jakarta Pairwise Test
Note: These test cases will be moved to integration board (towards M4: Integration Weather Board for Jakarta Release)
Project Name | Status | Notes | |
|---|---|---|---|
Health Check |
|
| |
Data flows for all use case
| VES data reception (VNF to VES simulated) |
|
|
VES ↔ TCAgen2 , via DMaaP |
|
| |
TCAgen2 ↔ Policy, via DMaaP |
|
| |
DCAE (TCAgen2) ↔ AAI, via API | NA | Note: To be validated part of integration test | |
DCAE (VES) ↔ Holmes (track metrics data), via DMaaP | NA | Note: To be validated part of integration test | |
Control flow for supporting CLAMP | DCAE (Policy sidecar) ↔ Policy, via API Retrieval for SON-Handler/TCAgen2 |
|
|
ONAP Bootstrapped services (non-usecase specific) |
| Status |
|
|---|---|---|---|
PNF Reg Flows | VES ↔ PRH, via DMaaP |
| |
| PRH ↔ AAI, via API |
| |
| PRH ↔ SO, via DMaaP Note: Scope of this test is to validate DMaap notification/structure (E2E PNF registration flow to be verified during integration phase) |
| |
HV-VES | WTP:GPB message ↔ HV-VES (tcp/socket) |
| |
| HV-VES ↔ DMAAP/kafka |
| |
Bulk PM usecase | VES ↔ DFC, via DMaaP |
| |
| DFC datacollection |
| |
| DFC↔ PM-Mapper, via DMaaP/DR |
| |
| PM-Mapper ↔ Dmaap |
| |
|
|
|
|
|
|
|
|