DCAE R10 Jakarta M2 Release Planning
Overview
Project Name | Enter the name of the project |
|---|---|
Target Release Name | Jakarta |
Project Lifecycle State | Mature. Refer to ONAP Charter, section 3.3 Project Lifecycle for further information |
Participating Company | AT&T, Nokia, Ericsson, Wipro, Samsung, Huawei, DT |
Scope
What is this release trying to address?
Release Focus
DCAE Focus for R10 is on following
Complete DCAE transformation to Helm
Common Template Enhancement for dcaegen2-services-common (filebeat removal + general add-on capabilities)
Continue removal of Consul dependency & application config standardization via configmap
MOD Support for Helm chart generation/distribution
Deprecate Cloudify and related Handlers from ONAP deployment
Integration Testsuite migration to use helm chart
Support TSC approved ONAP Usecases and Features (details below)
TSC/SECCOM Global requirements
STDIO complaince for Heartbeat and SNMPTRap MS
TSC/SECCOM Best Practice
Integration base image alignment for VES/RESTConf/SliceAnalysis MS
Reducing DCAE backlogs & security fixes
Microservice enhancements in support for ONAP usecases/features
Jakarta Usecases with DCAE impact
REQ# | DCAE Commit Status | DCAE Impact Assessment | DCAE JIRA # |
| YES | 1. Slice selection taking into consideration resource occupancy levels (NSI/NSSI Selection based on resource occupancy levels - DCAE changes) Commitment from WIPRO | |
| NO | No new impact for DCAE in J release
|
Jakarta Features with DCAE Impact
REQ# | DCAE Commit Status | DCAE Impact Assessment | DCAE JIRA # |
| YES | Slice Analysis enhancement
Commitment from HUAWEI for Development; Wipro team support reviews | |
| YES | Same as REQ-1076 + Introduction of ML/MS mS (POC) Commitment from Wipro | DCAEGEN2-3067 (POC) |
| YES | Cloudify/platform-handlers deprecation; MOD helm integration Commitment from AT&T, Nokia, Ericsson, Wipro, Huawei, |
Jakarta Spec with DCAE Impact
REQ# | DCAE Commit Status | DCAE Impact Assessment | DCAE JIRA # |
| YES | PMSH functional enhancement and support for dynamic filter/subscription change via API Commitment from Ericsson | |
NA | No | CMPv2 Enhancement - support for VES/DFC/HV-VES cert dynamically | |
NA | Deferred | VES 7.2.1 support for DCAE Microservices (outside of collectors) | |
NA | Deferred | DMAAP SDK standardization for DCAE Microservices | |
NA | Stretch-goal | Migrate DCAE MS to use standard topics (i.e unauthenticated) - PM-Mapper, Slice-Analysis, KPI-MS This will aid in Dmaap/Strimzi migration/Servicemesh complaincy and addressing Multiple subscriber issue (DCAEGEN2-2937) Commitment from Nokia, Wipro | |
NA | Stretch-goal | AAF certificate dependency to be removed by making it a configurable property for MS Commitment from Nokia |
Jakarta POC (DCAE impact)
REQ# | DCAE Commit Status | DCAE Impact Assessment | DCAE JIRA # |
NA | YES | Trial use of the black formatting and pylint checking tools on python code Commitment from AT&T | |
|
|
|
|
Best Practices/GLOBAL Requirements
REQ# | DCAE Commit Status | DCAE Impact Assesment | DCAE JIRA # |
REQ-443 - CONTINUATION OF CII BADGING SCORE IMPROVEMENTS FOR SILVER LEVEL Global-REQ | YES | CII badging score improvement Commitment from AT&T | |
REQ-439 - CONTINUATION OF PACKAGES UPGRADES IN DIRECT DEPENDENCIES Global-REQ | YES | Tcagen2, DFC, RESTConf, MOD-runtimeAPI, Mapper, PM-Mapper, PRH, SON-Handler, KPI-Computation MS, Slice-Analysis MS Commitment from AT&T, Nokia, Wipro | |
REQ-437 - COMPLETION OF PYTHON LANGUAGE UPDATE (v2.7 → v3.8) Global-REQ | YES |
(No new impact for DCAE in J release) | |
REQ-438 - COMPLETION OF JAVA LANGUAGE UPDATE (v8 → v11) Global-REQ | No |
Exception will be filed with SECCOM for waivers due to upstream (NIFi) dependency | |
REQ-432 - IPv4/IPv6 dual stack support in ONAP | YES | Enhance ONAP common-service template - add IPv4/IPv6 support (No new impact for DCAE in J release) | |
REQ-441/REQ-1070 - LOGS MANAGEMENT - PHASE 1: COMMON PLACE FOR DATA - JAKARTA RELEASE Global-REQ | YES | Healthcheck and SNMPTRap container
Commitment from AT&T | |
REQ-1073 - Using basic image from Integration | YES | VESCollector, RESTConf, Slice-Analysis MS need to be switched to use integration base image
Commitment from Nokia, Huawei, Wipro, AT&T |
|
REQ-1072 - Standardized logging fields | Stretch-goal | No change planned for existing Ms, however will be handled for new ML/MS POC delivery; Commitment from Wipro | Tracked under DCAEGEN2-3067 |
Note: The above commitment should be consistent with Jakarta Impact View per Component at M2.
New Services introduced for this release
Following new services will be delivered as POC in R10
ML MS (REQ-1074)
Repository : https://git.onap.org/dcaegen2/services/tree/components/ml-prediction-ms (introduced as new subproject under existing repo)
Platform Maturity
Platform Maturity (i.e., S3P items) Jakarta Release Platform Maturity
Green color → Target level ( details see Platform Maturity below)
Performance: Level 1
Stability: Level 2
Resiliency: Level 2
Security: Level 1+
Scalability: Level 1
Manageability: Level 1+
Usability: Level 1+
Minimum Viable Product
As DCAE transformation is underway, two different deployment options will be available. The MVP of DCAE will vary based on deployment choice and will include the necessary subcomponents supporting the primary objectives: meeting platform maturity goals and supporting the use cases.
Helm Deployment (dcaegen2-services)
Following platform component will be continued to be deployed via helm until all DCAE MS are migrated to new Config management solution via SDK
DCAE-MOD deployment is optional and will include following component (controlled via helm chart configuration under OOM)
* - Will be assessed at M3 depending on Helm migration feature status.
Functionalities
List the functionalities that this release is committing to deliver by providing a link to JIRA Epics and Stories. In the JIRA Priority field, specify the priority (either High, Medium, Low). The priority will be used in case de-scoping is required. Don't assign High priority to all functionalities.
Epics
Stories
Longer term roadmap
Complete DCAE transformation initatives and backlog items.
Release Deliverables
Indicate the outcome (Executable, Source Code, Library, API description, Tool, Documentation, Release Note...) of this release.
Deliverable Name | Deliverable Description |
|---|---|
Component spec | All ms added into DCAE should provide meta data representation of the component itself; will be used to generate design flow under MOD and enable blueprint generation |
configbinding | SourceCode/Docker image |
policy side-car | SourceCode/Docker image |
dcae-healthcheck | SourceCode/Docker image |
dcae-mod | SourceCode/jar/Docker image/Documentation |
VES Collector | SourceCode/Docker image/helm charts |
HV_VES Collector | SourceCode/jar/Docker image/helm charts |
PRH | SourceCode/jar/Docker image/helm charts |
TCA-GEN2 | SourceCode/jar/Docker image/helm charts |
DFC | SourceCode/Docker image/helm charts |
RESTConf | SourceCode/Docker image/helm charts |
PM-MAPPER | SourceCode/Docker image/helm charts |
VES-MAPPER | SourceCode/Docker image/helm charts |
DL Components (DES, DL-ADMIN, DL-FEEDER) | SourceCode/Docker image/helm charts |
SLICE ANALYSIS | SourceCode/Docker image/helm charts |
KPI-MS | SourceCode/Docker image/helm charts |
HEARTBEAT MS | SourceCode/Docker image/helm charts |
SON-HANDLER MS | SourceCode/Docker image/helm charts |
PMSH | SourceCode/Docker image/helm charts |
Note: Only default platform components and bootstrapped MS is listed on table above. DCAE also include dynamic service components deployed based on usecases. For a complete set of available DCAE MS - refer https://docs.onap.org/projects/onap-dcaegen2/en/latest/sections/release-notes.html#deliverables
Sub-Components
List all sub-components part of this release. Activities related to sub-components must be in sync with the overall release.
Sub-components are repositories and are consolidated in a single centralized place. Edit the Resources and Repositories (Deprecated) in the centralized page.
ONAP Dependencies
List the other ONAP projects you depend on.
DCAE depends on the the following components as part of the general ONAP architecture:
Architecture
High level architecture diagram
At that stage within the Release, the team is expected to provide more Architecture details describing how the functional modules are interacting.
Indicate where your project fit within the .
DCAE Interfaces
Platform Maturity
Refering to and Platform Maturity Requirements (aka Carrier Grade), fill out the table below by indicating the actual level , the targeted level for the current release and the evidences on how you plan to achieve the targeted level.
Area | Actual Level | Targeted Level for current Release | How, Evidences | Comments |
|---|---|---|---|---|
Performance | 1 | 1 |
|
|
Stability | 2 | 2
|
|
|