The content of this template is expected to be fill out for M1 Release Planning Milestone.


Overview

Project NameConfiguration Persistence Service
Target Release NameHonolulu
Project Lifecycle StateIncubation
Participating Company Ericsson, Nokia, Bell Canada, IBM, Pantheon

Scope

What is this release trying to address?

Introduce CPS specially focused to support E2E Network Slicing use case but in such a way that any other project an avails of the CPS functionality

Requirements

REQ-440 - Getting issue details... STATUS   For CPS only an MVP will be realized in Honolulu.

REQ-429 - Getting issue details... STATUS

Minimum Viable Product

  • CPS can store the module used for E2E Network Slicing and SON PCI (but any other model could be stored too)
  • Yang json dat file can be stored for same model (with some validation)
  • Support concept of Anchors (data entry points) even if only used one for MVP
  • An xNfProxy interface wil be used to access xNF configuration data in CPS (hide soem of teh CPS housekeeping from xNF data users)
  • Dataspace, model and dat will be hardcoded as part of xNfProxy stub in this release
  • Query support wil be limited to whatever is needed for  E2E Network Slicing use cases

Functionalities

Epics

key summary type created updated due assignee reporter priority status resolution
Loading...
Refresh

Stories

key summary type created updated due assignee reporter priority status resolution
Loading...
Refresh


Longer term roadmap

  • CPS-Core is to be able to store and validate any Yang Modelled data and provide advanced xPath like queries
  • CPS xNfProxy is a dedicate interface on CP-CODE for xNF configuration data and will included a mechanism for synchronizing the persisted data with the actual network configuration

Release Deliverables

Indicate the outcome (Executable, Source Code, Library, API description, Tool, Documentation, Release Note, etc) of this release.

Deliverable NameDeliverable Description
CPS Docker ImagesContainers running CPS and xNfProxy
CPS distribution libraryJava library for other apps to use

Sub-Components

List all sub-components part of this release.
Activities related to sub-components must be in sync with the overall release.

  • cps-service
  • cps-rest
  • cps-ri (reference implementation)
  • cps-xnf-proxy (TBD)

Architecture

High level architecture diagram


Platform Maturity

Please fill out the centralized wiki page: Honolulu Release Platform Maturity


  • API Incoming Dependencies

List the API this project is expecting from other projects.
Prior to Release Planning review, Team Leads must agreed on the date by which the API will be fully defined. The API Delivery date must not be later than the release API Freeze date.

Prior to the delivery date, it is a good practice to organize an API review with the API consumers.

API NameAPI DescriptionAPI Definition DateAPI Delivery dateAPI Definition link (i.e.swagger)
To fill outHigh level description of the APIDate for which the API is reviewed and agreedTo fill outLink toward the detailed API description
  • API Outgoing Dependencies

API this project is delivering to other projects.

API NameAPI DescriptionAPI Definition DateAPI Delivery dateAPI Definition link (i.e.swagger)
To fill outHigh level description of the APIDate for which the API is reviewed and agreedTo fill outLink toward the detailed API description
  • Third Party Products Dependencies

Third Party Products mean products that are mandatory to provide services for your components. Development of new functionality in third party product may or not be expected.
List the Third Party Products (OpenStack, ODL, RabbitMQ, ElasticSearch,Crystal Reports, ...).

NameDescriptionVersion
To fill outTo fill outTo fill out

In case there are specific dependencies  (Centos 7 vs Ubuntu 16. Etc.) list them as well.

  • Testing and Integration Plans

Provide a description of the testing activities (unit test, functional test, automation,...) that will be performed by the team within the scope of this release.

Describe the plan to integrate and test the release deliverables within the overall ONAP system.
Confirm that resources have been allocated to perform such activities.

  • Gaps

This section is used to document a limitation on a functionality or platform support. We are currently aware of this limitation and it will be delivered in a future Release.
List identified release gaps (if any), and its impact.

Gaps identifiedImpact
To fill outTo fill out
  • Known Defects and Issues

Please refer to Frankfurt Defect Status


  • Risks

List the risks identified for this release along with the plan to prevent the risk to occur (mitigation) and the plan of action in the case the risk would materialized (contingency).

Please update any risk on the centralized wiki page - Frankfurt Risks

  • Resources

Fill out the Resources Committed to the Release centralized page.

  • Release Milestone

The milestones are defined at the Release Level and all the supporting project agreed to comply with these dates.

  • Team Internal Milestone

This section is optional and may be used to document internal milestones within a project team or multiple project teams. For instance, in the case the team has made agreement with other team to deliver some artifacts on a certain date that are not in the release milestone, it is erecommended to provide these agreements and dates in this section.

It is not expected to have a detailed project plan.

DateProjectDeliverable
To fill outTo fill outTo fill out
  • Documentation, Training

Please update the following centralized wiki: Frankfurt Documentation

That includes

  • Team contributions to the specific document related to he project (Config guide, installation guide...).
  • Team contributions to the overall Release Documentation and training asset
  • High level list of documentation, training and tutorials necessary to understand the release capabilities, configuration and operation.
  • Documentation includes items such as:
    • Installation instructions
    • Configuration instructions
    • Developer guide
    • End User guide
    • Admin guide
    • ...

Note

The Documentation project will provide the Documentation Tool Chain to edit, configure, store and publish all Documentation asset.


Other Information

  • Vendor Neutral

If this project is coming from an existing proprietary codebase, ensure that all proprietary trademarks, logos, product names, etc. have been removed. All ONAP deliverables must comply with this rule and be agnostic of any proprietary symbols.

  • Free and Open Source Software

FOSS activities are critical to the delivery of the whole ONAP initiative. The information may not be fully available at Release Planning, however to avoid late refactoring, it is critical to accomplish this task as early as possible.
List all third party Free and Open Source Software used within the release and provide License type (BSD, MIT, Apache, GNU GPL,... ).
In the case non Apache License are found inform immediately the TSC and the Release Manager and document your reasoning on why you believe we can use a non Apache version 2 license.

Each project must edit its project table available at Project FOSS.


Charter Compliance

The project team comply with the ONAP Charter.