Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 43 Next »


This page will contain split of each endorsed functional requirement into a set of architectural requirements, and architecture flows to fulfill the specific functional requirement


5G Use Cases & Requirements in R7 (GuiLin)

The "directory" of 5G Use Case Wiki are located here: 5G Use Cases in R7 Guilin

USE CASE / REQUIREMENTDESCRIPTIONWIKI
OOF SON (PCI)
Optimization and SON functions for 5G RAN which provide for self-optimization, self-healing and self-configurationOOF SON use case in R7 Guilin
5G SERVICE MODELING & DEFINITIONDefining and modeling a 5G Service (in Design Time) and the associated Modeling (Platform information & data model). This is driven by 3GPP TS28.540 and TS28.541, the 5G NRM.R7 5G Service Modeling
ONAP/3GPP & O-RAN Alignment: Standards Defined Notifications over VES

The capability to receive, validate and process standards defined notifications encapsulated in VES events in ONAP.

Modeling: VES 7.1

ONAP/3GPP & O-RAN Alignment-Standards Defined Notifications over VES
ONAP/3GPP & O-RAN Alignment: A1 Adaptor Extension
A1 Adaptor extension for Standards Harmonization.
5G NRM (CM)5G Network Resource Model introducing Configuration Management (CM Updates) using RESTful (HTTPS) Interface (instead of NetConf)5G Network Resource Model (NRM) Configuration in R7
E2E NETWORK SLICING5G Network Slicing defines slices to be used in 5G RAN systems. Network Slicing is a long-lead multi-release development.E2E Network Slicing Use Case in R7 Guilin
BULK PM: PM CONTROL
PM Control/“PM Control plane” in ONAP  has been introduced in Rel 6 to complete Bulk PM use case enabling configuration of PM jobs/subscriptions on xNFs.
INTENT BASED NETWORK

The Intent-based Network (IBN) is applied to the configuration and optimization of network functions based on the Intents. The current version of IBN is applied to the opening and closed-loop operation of network slices in the 5G use case.

Intent-Based Network



PNF Use Cases & Requirements in R7 (GuiLin)

The "directory" for the PNF Use Case Wikis are located here: PNF Use Cases & Requirements in R7 Guilin

USE CASE / REQUIREMENTDESCRIPTIONWIKI
PNF PLUG AND PLAYPNF Plug and Play allows for ONAP to support PNF registration and discovery. The DCAE component, PRH (PNF Registration Handler) processes the PNF registration VES event.R7 PNF Plug and Play PnP
PNF PRE-ONBOARDING / ONBOARDINGPre-onboarding and PNF Onboarding for Vendor PNF Package delivery via SDC. The PNF Pre-onboarding includes activities that prepare the package; and onboarding allows the package to be ingested into SDC and validated in VNF-SDKR7 PNF Pre-onboarding / (onboarding)
PNF SOFTWARE UPGRADEThe PNF Software Upgrade use case allows for ONAP to update the PNF software.Support xNF Software Upgrade in association to schema updates






(General) Use Cases & Requirements in R7 (GuiLin)

USE CASE / REQUIREMENTDESCRIPTIONWIKI
CONFIGURATION & PERSISTENCY SERVICEThe Configuration & Persistency Service is a Data Layer Service providing database functionality to persist network element run time information.Configuration & Persistency Service R7
CMPv2 (Security Enhancement)Certificate Management Protocol (CMPv2) is a KPI X.509 certificate authentication exchange with a Certificate Authority or Registration Authority.

R7 Certificate Management Protocol (CMPv2)

(Used in other Use Cases)

LICENSING MANAGEMENTContinuation of Licensing Management driven from MANO ETSI IFA034, Modeling and architecture work for ONAP & Licensing handlingLicensing Management in R7
MDONS ExtensionExtension of Multi-Domain Optical Network Service use case










USE CASE REALIZATION CALLS (MOM)

R7 Use Case Realization Meetings MoM

SUPPORTING DOCUMENTATION & PRESENTATIONS

TopicFile
JIRA Template for Use Cases and RequirementsREQ-1
Instructions for creating and updating JIRA issues in REQDocumenting Release Requirements in JIRA
Presentation on changes to the REQ JIRA template for GuilinONAP Requirements Tracking with JIRA.pdf

COMPONENT IMPACTS TABLE

The following table shows the impacts of each requirement/use case per component

U/CAAIAAFCLAMPCCSDKDCAEExt APIModelM-VIMOOFPolicyPortalSDN-CSDCSOVIDVNF REQTSVNF SDK
SON PCI



C&PS DependTEST


YESYES
YES




5G Svce





YES









SD VES



YES
YES







YES
A1AdapNeed input from team















NRM


YES








Possible


E2ESliceYES

YES

C&PS

Depend






YES
YES
YES


PM CtrlNeed input from team


YES











IBNNeed input from team















PnP



CMPv2

Depend


YES





YES


POB















YES
SW Upg



YES







YES


C&PSTEST

YESDepend
Possible



YES


YES
CMPv2Need input from team


YES











LicenseNeed input




YES









MDONSNeed input from team



















































USEFUL LINKS

The following table has useful links:

  • No labels