Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Current »

Discussion itemsĀ 


DurationAgenda ItemRequested byNotes / Links
START RECORDING
30m

S3P Performance Level Recommendations

Casablanca Release Requirements

ONAP












NOTES

  • Closed Loop Projects involved during Runtime: DCAE (VES Collector, TCA), Holmes, Policy, APPC/SO/VFC/SDNC, A&AI
    • NOTE: CLAMP is not involved during runtime. The instantiation/deployment of DCAE components via DCAE controller are not covered by performance measurements. Not involved in CL flow, this is a one-time setup.
    • Recommendation: VNF measurement is not involved in performance tracking both on the DCAE collection/analytic side as well as on the controller/orchestrator side
    • Question: Is it "closed-loop" or should this simply be "runtime" projects? Open loop vs Closed loop?
    • Categories for control loops
      • Hours vs minutes - Non-real-time vs real-time
      • open loop ends at the point of manual notification
    • Traceability between all the control loop run-time projects. Metrics should be consistently tracked among all components.
    • Did the integration team capture anything during 72 hour stability tests?
  • Guard Policy - check max count limit on VF module, check prov_status and orchestration status
    • SDC sets that value. Should be in A&AI



RECORDING


  • No labels