Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Info
titleInfo

Use the "Copy" and "Move" options (available under the ..., top right of this page) to duplicate this template into your project wiki.
Use the Wiki to document the release plan. Don't provide PowerPoint.
Use as much diagrams and flow charts as you need, directly in the wiki, to convey your message.

Table of Contents
outlinetrue

Overview

Project NameEnter the name of the project
Target Release NameDublin
Project Lifecycle StateIncubation
Participating Company AMDOCS, AT&T, Bell Canada, Ericsson,Huawei, IBM, Tech
Mahendra
Mahindra

Scope

What is this release trying to address?

The primary focus of the ONAP release 4 (Dublin) is to advance platform maturity, with a focus on S3P (Scalabllity, Stability, Security and Performance).

Use Cases

SDNC will support the following use cases from previous releases:

...

Minimum Viable Product


The MVP for Dublin consists of the set of features required to support the use cases listed above.

Functionalities

List the functionalities that this release is committing to deliver by providing a link to JIRA Epics and Stories. In the JIRA Priority field, specify the priority (either High, Medium, Low). The priority will be used in case de-scoping is required. Don't assign High priority to all functionalities.

Epics

following epics represent the minimum viable product for the Dublin SDNC release:

Jira Legacy
serverSystem Jira
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
maximumIssues20
jqlQueryproject=SDNC and issuetype in (epic) and fixversion="Dublin Release" and priority in (highest, high) order by priority desc
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176


The following epics are considered stretch goals for the Dublin SDNC release.  These are planned for Dublin, but may be scaled back or removed if necessary due to resource constraints.

Jira Legacy
serverSystem Jira
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
maximumIssues20
jqlQueryproject=SDNC and issuetype in (epic) and fixversion="Dublin Release" and priority < high order by priority desc
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176

Functionalities


Epics

The following epics are committed for the Dublin release

Jira Legacy
serverSystem Jira
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
maximumIssues20
jqlQueryproject=SDNC and issuetype in (epic) and fixversion="Dublin Release" and priority in (Highest, High) order by priority desc
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176

The following epics are considered stretch goals for the Dublin release.  They are currently planned, but may be scaled back or cut if necessary due to resource constraints.

Jira Legacy
serverSystem Jira
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
maximumIssues20
jqlQueryproject=SDNC and issuetype in (epic) and fixversion="Dublin Release" and priority < High order by priority desc
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176


Stories

Jira Legacy
serverSystem Jira
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
maximumIssues20
jqlQueryproject=SDNC and issuetype in (story) and fixversion="Dublin Release"
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176

Longer term roadmap

One critical long term objective for the SDN-C project is support for integration with other third party SDN Controllers (e.g. Open Contrail), well as integration with the SDN Agent project from Open-O.  For the Dublin release, since our primary goal is to support the use cases identified above and to improve platform maturity, the degree to which we support such integration will be dictated by the needs of those use cases.  However, we do want to bear in mind that such integration is critical and will be included in our release plans going forward.  

Release Deliverables

Indicate the outcome (Executable, Source Code, Library, API description, Tool, Documentation, Release Note...) of this release.


Deliverable NameDeliverable DescriptionDeliverable Location
SDNC Source CodeSource code for SDNC projectONAP gerrit
SDNC Maven ArtifactsCompiled code that can be referenced in other projects as maven dependenciesONAP Nexus
SDNC Docker Containers

Docker containers associated with SDNC project:

  • Controller container
  • Database container
  • Admin portal container
ONAP Nexus
DocumentationUser and developer guidesONAP Wiki
SDNC CI/CD automationScripts to automate compilation and deployment of maven artifacts and docker containers

ONAP gerrit

ONAP Jenkins

Sub-Components

Subcomponents of each ONAP project may be found on the Resources and Repositories (Deprecated) page on this wiki.  Please see the SDN-C section of that page for subcomponent list of SDN-C.

ONAP Dependencies

SDN-C depends on the following projects:

  • Active and Available Inventory (A&AI)
  • Common Controller SDK (CCSDK).
  • Service Design and Creation (SDC)
  • Data Movement as a Platform (DMaaP)
  • Documentation
  • Integration
  • External API
  • Modeling
  • Multi VIM/Cloud
  • Policy

Architecture

...

High level architecture diagram

CCSDK will be delivered as a set of libraries accessible as Maven dependencies, as well as a set of base Docker containers. The docker containers themselves are intended to be used by other projects as a basis for their own controller-specific docker containers.

...

Image Removed

High level architecture diagram

The following diagram shows the high level architecture of SDNC:

...

Refering to CII Badging Security Program and Platform Maturity Requirements, fill out the table below by indicating the actual level , the targeted level for the current release and the evidences on how you plan to achieve the targeted level.

AreaActual LevelTargeted Level for current ReleaseHow, EvidencesComments
Performance00Awaiting guidance from Benchmark subcommittee
  • 0 -- none
  • 1 – baseline performance criteria identified and measured
  • 2 & 3 – performance improvement plans created & implemented
Stability01SDNC will perform 72 hour soak at component level. We assume that integration team will also do a 72 hour ONAP soak which includes SDNC.
  • 0 – none
  • 1 – 72 hours component level soak w/random transactions
  • 2 – 72 hours platform level soak w/random transactions
  • 3 – 6 months track record of reduced defect rate
Resiliency12In Beijing, CCSDK will support a clustered OpenDaylight configuration in Kubernetes, as well as a clustered database, to allow for automated detection and recovery within a site. SDNC will use that configuration to meet this requirement. See SDN-C Clustering on Kubernetes for further details
  • 0 – none
  • 1 – manual failure and recovery (< 30 minutes)
  • 2 – automated detection and recovery (single site)
  • 3 – automated detection and recovery (geo redundancy)
Security01SDNC will improve test coverage to > 50%
  • 0 – none
  • 1 – CII Passing badge + 50% Test Coverage + 50% test coverage
  • 2 – CII Silver badge; internal communication encrypted; role-based access control and authorization for all calls
  • 3 – CII Gold
Scalability01SDNC can be scaled either by adding additional OpenDaylight containers and/or database containers, or by deploying multiple instances of SDNC cluster.
  • 0 – no ability to scale
  • 1 – single site horizontal scaling
  • 2 – geographic scaling
  • 3 – scaling across multiple ONAP instances
Manageability11SDNC will support ONAP standard logging.
  • 1 – single logging system across components; instantiation in < 1 hour
  • 2 – ability to upgrade a single component; tracing across components; externalized configuration management
Usability11See readthedocs and wiki.
  • 1 – user guide; deployment documentation; API documentation
  • 2 – UI consistency; usability testing; tutorial documentation

API Incoming Dependencies


API NameAPI DescriptionAPI Definition DateAPI Delivery dateAPI Definition link (i.e.swagger)
A&AI : VNFAPI used to read/write information about VNFsDefined in seed codeIncluded in seed codeTBD
SDC : distributionAPI used to distribute artifacts from SDC to subscribersDefined in seed codeIncluded in seed codeTBD
DMaaPAPI used to receive DHCP event notification8/23/178/23/17DMaaP API



API Outgoing Dependencies


API NameAPI DescriptionAPI Definition DateAPI Delivery dateAPI Definition link (i.e.swagger)
HealthcheckAPI used to verify that platform is available and healthyIncluded in seed codeDelivered in seed codeTBD (requested Confluence OPEN API to be installed so this can be published on ONAP Wiki)
Generic VNF APIAPI used to request resources for VNFs. Will be deprecated in Beijing in favor of Generic Resource API.Included in seed codeDelivered in seed codeTBD (requested Confluence OPEN API to be installed so this can be published on ONAP Wiki)
Generic Resource APIAPI used to request resources for VNFs. This API is a superset of the generic VNF API, which it replacesIncluded in Amsterdam releaseDelivered in AmsterdamTBD (requested Confluence OPEN API to be installed so this can be published on ONAP Wiki)


Third Party Products Dependencies

NameDescriptionVersion
OpenDaylightOpenDaylight SDN Controller PlatformFluorine


Testing and Integration Plans

Provide a description of the testing activities (unit test, functional test, automation,...) that will be performed by the team within the scope of this release.

Describe the plan to integrate and test the release deliverables within the overall ONAP system.
Confirm that resources have been allocated to perform such activities.

Gaps

This section is used to document a limitation on a functionality or platform support. We are currently aware of this limitation and it will be delivered in a future Release.
List identified release gaps (if any), and its impact.

Gaps identifiedImpact
To fill outTo fill out

Known Defects and Issues

Provide a link toward the list of all known project bugs.

Jira Legacy
serverSystem Jira
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
maximumIssues20
jqlQueryproject=SDNC and issuetype in (bug) and fixVersion="Dublin Release"
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176

Risks

List the risks identified for this release along with the plan to prevent the risk to occur (mitigation) and the plan of action in the case the risk would materialized (contingency).

Risk identifiedMitigation PlanContingency Plan
To fill outTo fill outTo fill out

Resources

Fill out the Resources Committed to the Release centralized page.

Release Milestone

The milestones are defined at the Release Level and all the supporting project agreed to comply with these dates.

Team Internal Milestone

This section is optional and may be used to document internal milestones within a project team or multiple project teams. For instance, in the case the team has made agreement with other team to deliver some artifacts on a certain date that are not in the release milestone, it is erecommended to provide these agreements and dates in this section.

It is not expected to have a detailed project plan.

...


...

The following table shows the major project milestones and intermediate milestones for the Dublin release. 


MilestoneDescription DateComments
M1End of release planning
Formal commitment to release scope

  • M1 worksheets ready for review
Jan 22, 2019Release manager reviews worksheets to assess readiness for M1 milestone

  • TSC M1 approval vote
Jan 24, 2019


M2Functionality Freeze


  • Stable user stories baselined
Feb 15, 2019

  • M2 worksheets ready for review
Feb 19, 2019Release manager reviews worksheets to assess readiness for M2 milestone

  • TSC M2 approval vote
Feb 21, 2019


M3API Freeze


  • Final API definitions (swagger, Yang) due
March 8, 2019Last day to submit Dublin swagger / Yang changes to Gerrit

  • M3 worksheets ready for review
March 12, 2019Release manager reviews worksheets to assess readiness for M3 milestone

  • TSC M3 approval vote
March 14, 2019


M4Code Freeze


  • Code due for Dublin user stories
April 4, 2019Last day to submit Dublin code changes to Gerrit

  • M4 worksheets ready for review
April 9, 2019

Release manager reviews worksheets to assess readiness for M4 milestone, including the following checks:

  • All repos must have >= 50% code (line) coverage in Sonar
  • No failed Jenkins jobs
  • All CSIT tests pass
  • Healthchecks pass

  • TSC M4 approval vote
April 11, 2019


RC0Release Candidate 0


  • Code due for RC0 fixes
April 19, 2019Last date to submit code fixes for release candidate 0

  • RC0 release artifacts available
April 23, 2019

  • RC0 worksheets ready for review
April 23, 2019

  • TSC RC0 approval vote
April 25, 2019


RC1Release Candidate 1


  • Code due for RC1 fixes
May 3, 2019Last date to submit code fixes for release candidate 1

  • RC1 release artifacts available
May 7, 2019

  • RC1 worksheets ready for review
May 7, 2019

  • TSC RC1
May 9, 2019


RC2Release Candidate 2


  • Code due for final Dublin fixes
May 17, 2019Last date to submit code fixes for final Dublin release (RC2)

  • RC2 release artifacts available
May 21, 2019

  • RC2 worksheets ready for review
May 21, 2019

  • TSC RC2
May 23, 2019


Release Sign-OffFinal TSC Sign-OffMay 30, 2019Dublin Release Sign-Off

Documentation, Training

  • Highlight the team contributions to the specific document related to he project (Config guide, installation guide...).
  • Highlight the team contributions to the overall Release Documentation and training asset
  • High level list of documentation, training and tutorials necessary to understand the release capabilities, configuration and operation.
  • Documentation includes items such as:
    • Installation instructions
    • Configuration instructions
    • Developer guide
    • End User guide
    • Admin guide
    • ...
Note
titleNote

The Documentation project will provide the Documentation Tool Chain to edit, configure, store and publish all Documentation asset.


Other Information

  • Vendor Neutral

If this project is coming from an existing proprietary codebase, ensure that all proprietary trademarks, logos, product names, etc. have been removed. All ONAP deliverables must comply with this rule and be agnostic of any proprietary symbols.

  • Free and Open Source Software

FOSS activities are critical to the delivery of the whole ONAP initiative. The information may not be fully available at Release Planning, however to avoid late refactoring, it is critical to accomplish this task as early as possible.
List all third party Free and Open Source Software used within the release and provide License type (BSD, MIT, Apache, GNU GPL,... ).
In the case non Apache License are found inform immediately the TSC and the Release Manager and document your reasoning on why you believe we can use a non Apache version 2 license.

...