Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.


The following page describes the major use cases and key requirements targeted to the Honolulu Release

...

RELEASEWIKI PAGE
R6 Frankfurt Release Use Case PortalRelease 6 (Frankfurt) proposed use cases and functional requirements
R7 Guilin Release Use Case PortalGuilin (R7) - Use Cases (and Requirements in Use Cases)
Use Case Realization R6 Portal PageRelease 6 (Frankfurt) proposed use cases and functional requirements
Use Case Realization R6 Portal PageR7 Use Case Realization Meetings Meeting Register MoM


5G USE CASES & REQUIREMENTS IN R8 (HONOLULU)

...

USE CASE / REQUIREMENTDESCRIPTIONWIKI LINK
5G Service ModelingDefining and modeling a 5G Service (in Design Time) and the associated Modeling (Platform information & data model). This is driven by 3GPP TS28.540 and TS28.541, the 5G NRM. Development of a concept of a Registry Service used in CPSR8 5G Service Modeling
5G SON Use CaseOptimization and SON functions for 5G RAN which provide for self-optimization, self-healing and self-configurationR8 5G SON use case
ONAP/3GPP & O-RAN Alignment: Standard Defined VES The capability to receive, validate and process standards defined notifications encapsulated in VES events in ONAP. VES 7.2R8 ONAP/3GPP & O-RAN Alignment: Standard Defined VES
End to End Network Slicing5G Network Slicing defines slices to be used in 5G RAN systems. Network Slicing is a long-lead multi-release development.R8 E2E Network Slicing use case

Smart Operator Intent Translation in UUI based on IBN - R8 5G Slicing Support

A lightweight and high-cohesion Nature Language Processing (NLP) function is proposed to add in the UUI project, in order to translate the network operation engineers’ text/voice intents to the suitable slicing parameters quickly and decrease the manual configurations.Smart Operator Intent Translation in UUI based on IBN - R8 5G Slicing Support
Support for Vertical Industry

Support for Vertical Industry. Intent framework is a system that helps to implement and operate networks that can improve network availability and agility. It takes a high-level business goal (intent) as input, converts it to the necessary network configurations and applies the network changes via network automation and/or network orchestration. Continuously monitoring the status of the network under control, the system validates in real time that the intent is being met, and can take corrective actions when desired intent is not met.

Support for Vertical Industry
Intent Based Networking

Support for Intent Framework and Intent Modeling. (add description)

Support for Intent Framework and Intent Modeling
ONAP/3GPP & O-RAN Alignment: A1 Adapter and Policy Management Extension

A1 Adapter and Policy Management Extension.

This requirement enhances the A1 interface capabilities provided in Rel 6 as part of  5G/ORAN & 3GPP Standards Harmonization requirement ( REQ-38) and extended in Rel 7 with the introduction of A1 policy management.   O-RAN has defined A1 interface specification in the context of the management of 5G RAN elements to provide intent based policies for optimization of the RAN network performance. Planned enhancements for Rel 8 include support of new A1 interface version in alignment to O-RAN alliance and common logging/audit.

O-RAN A1 Policies in ONAP  (Overall)

R8 A1 Adapter and Policy Management Extension (Honolulu)








MAJOR USE CASES & REQUIREMENTS IN R8 (HONOLULU)

USE CASE / REQUIREMENTDESCRIPTIONWIKI LINK
PNF Plug and Play

The PNF Plug and Play Use Case allows a PNF to register with ONAP using a pnfRegistration VES Event. This is expected to be used for installation & commissioning a network that is to be managed by ONAP. When this event is received, the PNF Registration Handler (PRH) processes this event to complete the registration by updating the corresponding A&AI entry for the expectant PNF. The PRH was developed specifically for this use case. Once registered, ONAP can interoperate with the PNF and perform LCM or FCAPS (OA&M) operations in addition to other actions. This Use Case was originally started in in R2 Beijing and functionality has been continually improved since then.

R8 PNF Plug and Play Use Case
Certificate Management Protocol v2

The Certificate Management Protocol (CMP) is an Internet protocol used for obtaining X.509 digital certificates in a public key infrastructure (PKI). It is described in RFC 4210 and is one of two protocols so far to use the Certificate Request Message Format (CRMF), described in RFC 4211, with the other protocol being Certificate Management over CMS (CMC), described in RFC 5273. An obsolete version of CMP is described in RFC 2510, the respective CRMF version in RFC 2511. CMP messages are encoded in ASN.1, using the DER method and usually transported over HTTP. CMP (Certificate Management Protocol) Server & Client (completed in R6)

R8 Certificate Management Protocol
Configuration Persistence Service

The Configuration Persistence Service is a Common Data Layer Service providing database functionality to persist network element run-time information. CPS will perform key DB operations such as syncing data with xNFs. CPS enables OSS configuration, optimization and E2E LCM operations. It will be a new Platform Component in R8.

Team meeting page: Configuration Persistence Service Meeting Notes & Recordings

R8 Configuration Persistence Service (CPS) for R8 Honolulu
ETSI AlignmentETSI Alignment Use CaseR8 ETSI Alignment

xNF Software Upgrade

PNF Software Upgrade enhancement

In Rel 6 (REQ-84) and Rel 7 (REQ-324), PNF sw upgrade requirement in ONAP has progressed covering both with/without schema updates. A schema update in relation to a xNF software upgrades is a routine for network upgrade to support new xNF features, improve efficiency or increase xNF capacity on the field, and to  eliminate bugs.  This use case provides to ONAP an advantage in orchestrating and managing the Life Cycle of a Network Services in-line with business and service objectives. In Rel 8, the feature will be enhanced with PNF sw version management during sw upgrade procedure.


Bulk PM/ PM Data ControlBulk PM / PM Data Control Improvements
PM data collection control provides 5G network operators with a dynamic and more efficient way to configure performance measurement collection on a selected subset of  PNFs/VNFs in the network and complements the existing PM data collection and processing capabilities in ONAP/DCAE. An initial version has been delivered in Rel 6 (REQ-129) then enhanced in Rel 7 (REQ-381). Planned enhancements for Rel 8 intend to improve the (PMSH) subscription management about subscription update.




...

USE CASEOVERVIEW & SUMMARY SLIDESRECORDING & DEMOS
General ONAP Use Cases OverviewOverview slides for All ONAP Major Use Cases
R8 Use Cases OverviewR8 Overview slides for selected Use Cases
OOF SON PCIUse Case Realization Call: June 17, 2020
5G SERVICE MODELING
ONAP/ORAN 3GPP STNDDEF VES
ONAP/ORAN 3GPP A1 POLICY
E2E NETWORK SLICING
BULK PM: PM CONTROL

Overview Slides:



PNF PLUG AND PLAYUse Case Realization Call: February 19, 2020
xNF (PNF/VNF) SOFTWARE UPGRADE
CONFIG & PERSIST SERVICE
CMP v2
LICENSING MANAGEMENTUse Case Realization Call: September 4, 2019
MDONSUse Case Realization Call: December 04, 2019
ETSI ALIGNMENTUse Case Realization Call: Oct 21, 2020
INTENT BASED NETWORKING
VERTICAL INDUSTRY MANAGEMENTUse Case Realization Call: Jan 14, 2020
CCVPNOverview Wiki: CCVPN Use Case (Dublin)
Broadband Service Use CaseOverview Wiki: BBS Broadband Service Use Case (Dublin)
5G NRM Network Resource ModelOverview Wiki: 5G Network Resource Model (NRM) Configuration in R6 Frankfurt

USEFUL LINKS

The following table has useful links:

REFERENCE LINKWIKI URL
Use Case Way of WorkingONAP Use Case / Requirements Teams Process Way of Working (WoW)
Architecture Way of WorkingONAP Architecture Team Process - Old
Modeling Way of WorkingProposed ONAP Release Process Updates for Information and Data Modeling
R7 Requirements Proposal PageGuilin release - functional requirements proposed list
R8 Requirements Proposal PageHonolulu release - functional requirements proposed list
Business Driver TemplateBusiness Driver Template for Use Cases
Use Case Template (R8 Use Case Template)

R8 Use Case

R7 MODELING Planning PageONAP R7 Modeling High Level Requirements
R8 MODELING Planning PageONAP R8 Modeling High Level Requirements
MODELING Generic Information Element TemplateGeneric Information Element Template
MODELING CURRENT ACTIVITY STATUSModeling Current Activity Status
ARCHITECTURE Review TemplateR7 Guilin Architecture Review (template) - functional requirements
ARCHITECTURE Review ProcessProject Architectural Review Requirements and Process (Draft)
ONAP Project & Component LifecycleONAP Project and Component Lifecycle
Release Planning R8Release Planning: Honolulu
REQ-1

REQ-1 - ONAP Requirement Template To Do

R7 Release Tracking Page Jira DashboardGuilin Release Requirements
R8 Release Tracking Page Jira Dashboard -
Project Status in Honolulu Release
R8 Jira DashboardHonolulu Release Requirements
R7 Use Case Realization MOMR7 Use Case Realization Meetings MoM
R6 Use Case Realization MOMRelease 6 (Frankfurt) proposed use cases and functional requirements
ONAP Calendarhttps://lists.onap.org/groups