Attendees:
Ritusood,han yanan,maopeng,jinhua,Yan Yang,Victor Gao,Lingli,Lu xin,Shashank,xiaodong ning, xinhui li,yunlong, yufei
Agenda:
- summarize the recent work and give some feedback to the team
- look through M4 Code Freeze checklist
Minutes:
First topic
- Yan summarized the team work progress.
a. M2 and M3 Status --------- Already passed
Should continue to increase the Unit test code coverage
b.Docker imagesFinished most of components docker images except workflow component
c.Integration with OOMVF-C scripts haven’t been merged into OOM repo
d. CSIT Test --------- Need add more CSIT Testhttps://lf-onap.atlassian.net/wiki/display/DW/VF-C+CSIT+Test+Cases+guide
e.Doc Requirement ---------- Finished two API documents translationGuide : http://onap.readthedocs.io/en/latest/guides/onap-developer/how-to-use-docs/include-documentation.html
f. Module view Requirement(video/webina) -------- Only finished one draft PPTNeeds 5 to 10 minutes video/webinar and provides overview of the functional module and how it fits into the overall architecture and how it relates to other ONAP components.
g. SDC and A&AI Work progress.
VF-C team is collecting the VNF CSAR package examples from VoLTE VNF vendor and will be reviewed by SDC team in SDC weekly meeting.
A&AI schema changes haven't merged into A&AI repo.
Second topic
- Team looked through the M4 checklist
Team should pay attention to three items:
a. Doc requirement
b. Independent versioning and release plan
d. CSIT test reach 100%
Action:
Each components should follow the csit guide to finish the csit test cases before M4
- Workflow should finish the docker image build early this week.
Lcm should follow the doc guide to add one document to doc repo.
Weitao should feedback the A&AI schema changes today.
- Maopeng and Mandeep should cooperate to merge the VFC scripts to OOM repo.
- Yan will send the VF-C view draft to the team to review.
- Yan will schedule a meeting to discuss the VF-C version and release plan