This table summarizes each project's plan in regard to support of "Platform Maturity" in Istanbul Release. The data below are extracted from each project plan.

The Platform Maturity recommendations are documented in Platform Maturity Requirements (and sub-pages) from djhunt

Legend

Color code:

  • Red: below maturity level
  • Yellow: same maturity.
  • Green: improved maturity level.

M1 Actual represents the assessment before M1. M1 Target represents, at M1 date, what the team plans to implement. M4 result represents what has been really implemented at M4 date . All these fields are self-assessed by the team.

CII Badging Tracking: http://tlhansen.us/onap/cii.html


AREA

Design / Run-Time

Performance

(min: Level 2 for closed-loop project; 0 for others)

Stability

(min: level 2 all projects)

Resiliency

(min: level 2 for runtime, level 1 others)

Security

(min: Project Level 2, 70% at silver)

Scalability

(min: level 1 for runtime projects)

Manageability

(min: level 2 all projects)

Usability

(min: level 2 all projects)

Min TSC Recommendations
M1 Actual

M1 Target

M4 resultM1 ActualM1 TargetM4 resultM1 ActualM1 TargetM4 resultM1 ActualM1 TargetM4 resultM1 ActualM1 TargetM4 resultM1 ActualM1 TargetM4 resultM1 ActualM1 TargetM4 result
Project Name





















A&AIR1111112221+ (75% toward silver)1+ (75% toward silver)1+ (75% toward silver)111

1


11111
Common Controller SDKR000NANANA2221+ (75% towards silver)1+ (75% towards silver)1+ (82% towards silver)NANANA222222
CPSR000(Note #4)1(Note #4)1(Note #4)2221+1+1+111222222
DCAED & R1112222221+ (94% Silver)1+ (~96% Silver)1+ (~96% Silver)1111+1+1+

1+

(see Note#1)

1+1+
DMaaPR111222222

1+

1+1+1111+1+1+111
HolmesR2221111+1+1+1+1+1+1111111+1+1+
Microservices BusR222222222111221222222
ModelingD/R11112222211+(96% Silver)1+111222222
Multi VIM/CloudR111222222222111111222
ONAP CLID & R1

1

2

1.5 Note #2

1

1

2 Note #2

ONAP Optimization FrameworkR111111222

1+

(85% towards silver)

1+1+111111111
ONAP Usecase UI ProjectR1

1

2

1

1

1

2

Policy Framework Project ProposalD & R

D: 1

R: 2



2



D: 2

R: 2



2 (silver)

1



2



2

SDN-CR0001112221+ (75% towards silver)1+ (75% towards silver)1+ (82% towards silver)111222222
Service Design & CreationD000

2

(Note #4)

2

(Note #4)

2

(Note #4)

1

11

1

(Note #5)

11111

1

(Note #6)

1

(Note #6)

1

(Note #6)

111
Service OrchestratorR11111

1+

Added more CSIT and SO gating increased the stability of the releases.

222

1+

(89% towards Silver)

1

1+

Working on the ingress to get the ports ssl bases.

111111111
VFCR11111122211+(93% Silver)1+111222222
VNF SDKD0

1

1

1.5




1

1

2

(Note #7)




Note 1: Level2 - Swagger definition completed for all component exposing API's. Component API's standardized with ONAP API Common Versioning Strategy for majority of DCAE component with some exception (older platform components)

Note 2: CLI https enabled, direct vaulnerability cleared with avaiable new 3rd party versions, but silver badge is not applied yet. so given with 1.5. increased manageability by providing additional commands already. usability increased with provided web console, linux console and direct mode

Note 3: Angular upgrade Completed, Security updates planned in Istanbul release for Portal.

Note 4: Assumption is that platform 72 hour test is run by Integration team

Note 5: plus AAF-generated certificate and HTTPS mode by default.

Note 6: logging spec very close to 1.2;

Note 7: VNFSDK integrate OPNFV Dovetail and ONAP CLI to run the xNF Test cases and VNFSDK also have a portal to trigger the tests.