/
Platform Maturity: Performance

Platform Maturity: Performance

The Platform Maturity requirements for Beijing are on this page:
Platform Maturity Requirements (aka Carrier Grade)

The ambition for the ONPA Policy Framework is to reach level 1 in performance in Beijing, see JIRA POLICY-392


For Performance Level 1, we have to define and measure our performance metrics:
Level 1: baseline performance criteria identified and measured  (such as response time, transaction/message rate, latency, footprint, etc. to be defined on per component

I don't think we have to state what the metrics should be, it looks like we just define the metrics and measure them. For Level 2, an improvement plan must be created and implemented.

Although there should be measurements for design time and deployment time performance, here we focus on the run time performance metrics for policy execution in the PDPs, the most critical run time metrics for Policy. We propose to measure these metrics in a simulated environment and in a full ONAP deployment.

No.

Metric

Description

No.

Metric

Description

1

Single Threaded Response Time

Measure the execution time for onset and abatement in each use case with only a single policy executing

2

Single Threaded CPU Usage

CPU Usage for each use case when executing alone

3

Single Threaded Memory Usage

Memory Usage for each use case when executing alone

4

Maximum Simultaneous Executions

Measure the maximum number of simultaneous policy executions that can be achieved whilst maintaining system stability and resource utilization

5

Installation Footprint

The requirements of the ONAP Policy Framework installation in terms of VM resources including the amount of disk space required for the database and for logs.








Related content

Platform Maturity Requirements (aka Carrier Grade)
Platform Maturity Requirements (aka Carrier Grade)
More like this
Policy R2 Beijing M1 Release Planning Template
Policy R2 Beijing M1 Release Planning Template
More like this
Policy R2 Beijing - Architecture Review
Policy R2 Beijing - Architecture Review
More like this
Policy R2 Beijing - Integration Test Plans
Policy R2 Beijing - Integration Test Plans
More like this
Casablanca Platform Maturity S3P Planning (New)
Casablanca Platform Maturity S3P Planning (New)
More like this
Platform Maturity Requirements (S3P)
Platform Maturity Requirements (S3P)
More like this