Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 3 Next »

Table of Contents

Scenario Scope In Frankfurt

This scenario will demonstrate PNF SW upgrade with netconf/yang interface with EM. The E2E procedure is VID→ SO→ CDS→ EMS → PNF.  Beyond the work of scenario 1, it also need:

  • Support SS REST API for PNF S/W upgrade, downloadNESw and activateNESw
  • Provide controller blueprint file for CDS to trigger downloadNESw and activateNESw actions

  • Enhance EMS simulator for integration test

Impacts

Project/ComponentStory
SO

Common task with Scenario 1: PNF Software Upgrade using direct Netconf/Yang interface

No additional impacts

CDS

Common task with Scenario 1: PNF Software Upgrade using direct Netconf/Yang interface

Additional impact: EMS-compatiable CBA  file for integration test

Integration

1) EMS simulator extension

2) Integration document revision for PNF Sw Upgrade UC

JIRA Status Tracking

key summary type created updated due assignee reporter priority status resolution
Loading...
Refresh


Test Status

NoTest CaseTest Status
1Download NE SW for PNF instance 1 from CDS to EM using SS REST APICOMPLETE
2Activate NE SW for PNF instance 1 from CDS to EM using SS REST APICOMPLETE
3Download NE SW for PNF instance 2 from CDS to EM using SS REST APCOMPLETE
4Activate NE SW for PNF instance 2 from CDS to EM using SS REST APICOMPLETE
5Test PNF SW upgrade Workflow for PNF instance 1 from SO to CDS (using SS gRPC API) to EM

COMPLETE

With Exception: WF was executed as expected (SW version was changed) but not right response from SO.


Detailed Description of Integration Testcases and Results

comming soon.

  • No labels