SDC 11/22/2021 weekly meeting report

Date Nov 22, 2021 

Meeting Logistics

Day

Time

Meeting ID

Zoom Link

Join by phone

Monday

[sdc] Team ONAP3, Mon UTC 11:00 / China 19:00 / Eastern 06:00 / Pacific 03:00

https://lists.onap.org/g/onap-meetings/calendar

See Groups.io calendar invite

See Groups.io Calendar Invite

Note that a Waiting room has been added to the meeting room, the host will let you join once identified

Meeting Attendees

@Michael Morris 

@Vasyl Razinkov 

@Anderson Ribeiro 

Agenda & Minutes

Review open action items from last week

Agenda

Minutes (Draft to be updated during call)

Slides

High Priority Bugs

 

High priority defects :

 

type key summary assignee reporter priority status resolution created updated due
Loading...
Refresh

 

Open review

 

Istanbul release

Istanbul release planning schedule here: Release Planning: Istanbul

M3 (functional code freeze) on August 26th.

All JIRA issues with 'High' or 'Highest' priority need to be resolved

Aug 16, 2021 

Inactive old issues with 'High' or 'Highest' priority to be reduced in priority. If anybody feels any of these issues should be kept as high or highest priority then please raise a discussion on it

Code coverage at 55.6 %

Aug 23, 2021 

Some 'High' or 'Highest' priority issues resolved since last week. The following issues that will be reduced in priority: SDC-2716: SDC and CDS Integration Improvements [placeholder]Open,SDC-2325: Delete operation artifact only when neededOpenSDC-1488: enhance the artifact directory support for user provided arbitrary artfiacts as well as other cloud technologyOpen. If anybody feels any of these issues should be kept as high or highest priority then please raise a discussion on it.

Code coverage at 55.5 %

Aug 30, 2021 

M3 postponed to Thursday 2nd Sept

No change in rest of the rest of the release schedule

Sep 6, 2021 

M3 passed last Thursday 2nd Sept, no more functional content accepted in Istanbul

Sep 13, 2021 

M4 planned for this Thursday 16th Sept. Releasing the docker images delayed by failure in https://jenkins.onap.org/view/docker/job/sdc-maven-docker-stage-master/, need to update version of maven from 3.5 to 3.6

Sep 20, 2021 

M4 passed by TSC last Thursday.

Issue seen in gating with importing VSPs using backend REST API. Fix implemented, to be released to gating

Oct 4, 2021 

Gating results look good with latest release 1.9.3

Oct 11, 2021 

Not merged in yet to OOM, but latest gating shows 100% on health check and smoke tests and review has received +2.

RC is this Thursday 14th October.

All stories, epics, tasks, and subtasks delivered in Istanbul should be closed. All open issues to be moved to Jakarta release

Oct 18, 2021 

1.9.3 merged in.

New oom review opened with 1.9.4 with bug fixes

RC decision postponed by TSC last Thurdsay, to be evaluated after PTL meeting today

Nov 8, 2021 

1.9.4 merged in to OOM

Sign-off postponed to Nov 15th

Nov 15, 2021 

1.9.5 merged in OOM

Sign-off to be discussed at PTL meeting later today

Nov 22, 2021 

Istanbul sign-off approved

 

SDC performance issue

During H release Stability testing for SDC, it was noticed that performance decreases over time, up to the point where onboarding is not successful

Not had time to investigate logs yet but saw some exceptions happening

Test details and logs can be found here :

INT-1912 - SDC Stability test: success rate drops after ~ 500 onboarding IN PROGRESS

Jul 5, 2021 

Cassandra configuration changes in stability tests resulted in significant improvement with success rate in excess of 90%. Remaining failures are likely to be due to timing issues

Duration per request increases as DB becomes more loaded. 

Patchset to be pushed with new configuration and to expose configuration through helm charts to enable tunning where required.

Test results: https://logs.onap.org/onap-integration/weekly/onap_weekly_pod4_master/2021-06/28_21-34/stability/results_sdc_5_24h/onaptests_bench.html

Jul 12, 2021 

Review push for exposing the configuration 

https://gerrit.onap.org/r/c/sdc/+/122516

Jul 19, 2021 Jul 26, 2021 

SDC changed merged. OOM change in progress

Aug 16, 2021 

OOM change pushed, waiting on SDC release 

Aug 23, 2021 

SDC release to be done at M3 on Thursday

Aug 30, 2021 

M3 postponed last week so release not done, plan to release at M3 this Thursday instead, but if needed earlier let PTL know

Sep 6, 2021 

Release to be done when issue observed in deploying is resolved

Oct 11, 2021 

Should be possible to progress OOM review with version SDC 1.9.3 

Oct 18, 2021 

OOM review in progress

Nov 8, 2021 

OOM review merged in, however new bug raised on Istabul (SDC-3733)

Nov 15, 2021 

Fix merged in for SDC-3773 and 1.9.5 merged in OOM. Stability tests are being re-run

Nov 22, 2021 

Stability tests result looks good with 1.9.5, overall success rate 92%. Success rate in line with Honolulu and tests executed much faster (1440 in 24hrs up from ~600)

 

Jakarta Release timeplan

Oct 18, 2021 

M1 (Global requirement freeze) scheduled for 2nd December

Release Planning: Jakarta

 

Jakarta Impacts

Portal is in unmaintained state in Istanbul and is proposed to be removed in Jakarta, need to consider how user authentication for SDC UI to be performed if portal is removed

Jakarta Release Requirements

Nov 22, 2021 

Proposed new global requirement: REQ-441 ONAP application log to stdout and stderr

Proposed new best practice: Standardized Logging Fields, see Jakarta Best Practice Proposal for Standardized Logging Fields - v2

 

Build issue

Unit tests started failing systematically last week on Jenkins with ApplicationContext error (SDC-3757: Test cases failing incorrectly on JenkinsClosed). @Ignored the affected test cases to enable reviews to proceed and created issue to investigate a fix (SDC-3758: Fix failing test casesClosed)

Nov 15, 2021 

Code in review

Nov 22, 2021 

Merged

 

Q&A

 

 

 

Action Items

 

 

Slack Channel: #SDC on LFN ONAP.org Slack instance (onapproject.slack.com)

 

Recording

Chat

There was no chat during the meeting