SDNC Istanbul Release Planning

SDNC Istanbul Release Planning

The content of this template is expected to be fill out for M1 Release Planning Milestone.

Info

Use the "Copy" and "Move" options (available under the ..., top right of this page) to duplicate this template into your project wiki.
Use the Wiki to document the release plan. Don't provide PowerPoint.
Use as much diagrams and flow charts as you need, directly in the wiki, to convey your message.


Overview

Project Name

Enter the name of the project

Project Name

Enter the name of the project

Target Release Name

Istanbul

Project Lifecycle State

Mature

Participating Companies 

AT&T, Bell Canada, Fujitsu, Ericsson, IBM, Huawei, Nokia, Orange, Samsung, Tech Mahindra, Wipro

Scope

What is this release trying to address?

The Istanbul release contains a number of enhancements primarily centered around 5G use cases and ORAN integration.

We are completing work begun in the Guilin release to create a springboot-based microservice which will offer the SLI-API (used by healthcheck) and GENERIC-RESOURCE-APIs.  We will regression test our GR-API flows against both the current, OpenDaylight based implementation and the springboot-based version to validate that backward compatibility has been maintained. 

Requirements

The following table lists the new functional requirements SDNC is committing to support for the Istanbul Release:

Minimum Viable Product

The following epics represent the minimum viable product of the SDNC Istanbul Release:

key summary type created updated due assignee reporter priority status resolution
Loading...
Refresh

The following epics are also in scope for Istanbul, but are not considered of the minimum viable product.  In the event of unanticipated resource constraints, these could be reduced in scope or deferred without impacting any functionality deemed by the TSC as critical for Istanbul

key summary type created updated due assignee reporter priority status resolution
Loading...
Refresh

Functionalities

List the functionalities that this release is committing to deliver by providing a link to JIRA Epics and Stories. In the JIRA Priority field, specify the priority (either High, Medium, Low). The priority will be used in case de-scoping is required. Don't assign High priority to all functionalities.

Epics



The following epics are committed for the SDNC Istanbul Release:

key summary type created updated due assignee reporter priority status resolution
Loading...
Refresh

The following epics are also in scope for Istanbul, but are not considered of the minimum viable product.  In the event of unanticipated resource constraints, these could be reduced in scope or deferred without impacting any functionality deemed by the TSC as critical for Istanbul.

key summary type created updated due assignee reporter priority status resolution
Loading...
Refresh

Stories

key summary type created updated due assignee reporter priority status resolution
Loading...
Refresh



Bugs

key summary type created updated due assignee reporter priority status resolution
Loading...
Refresh

Longer term roadmap

Indicate at a high level the longer term roadmap. This is to put things into the big perspective.

Release Deliverables

Indicate the outcome (Executable, Source Code, Library, API description, Tool, Documentation, Release Note, etc) of this release.



Deliverable Name

Deliverable Description

Deliverable Location

Deliverable Name

Deliverable Description

Deliverable Location

SDNC Source Code

Source code for SDNC project

ONAP gerrit

SDNC Maven Artifacts

Compiled code that can be referenced in other projects as maven dependencies

ONAP Nexus

SDNC Docker Containers

Docker containers associated with SDNC project:

  • Controller (OpenDaylight) container

  • Database container

  • Directed Graph Builder container

ONAP Nexus

Documentation

User and developer guides

ONAP Wiki

SDNC CI/CD automation

Scripts to automate compilation and deployment of maven artifacts and docker containers

ONAP gerrit

ONAP Jenkins