Integration R2 Release Planning
- 1 Overview
- 2 Scope
- 3 Release Deliverables
- 4 Sub-Components
- 5 Architecture
- 6 Testing and Integration Plans
- 7 Gaps
- 8 Known Defects and Issues
- 9 Risks
- 10 Resources
- 11 Release Milestone
- 12 Team Internal Milestone
- 13 Documentation, Training
- 13.1 Note
- 14 Other Information
Overview
Project Name | Enter the name of the project |
---|---|
Target Release Name | Beijing |
Project Lifecycle State | Incubation |
Participating Company | Huawei, AT&T, China Mobile, China Telcom, Orange, VMware, Wind River, Amdocs, ZTE, TechMahindra |
Scope
What is this release trying to address?
Based on the vFW / vDNS, vCPE and VoLTE use cases, this project will provide cross-project system integration, CI/CD, and all related end-to-end release use cases testing with VNFs necessary for the successful delivery and industry adaption of the ONAP project as a whole. The same Amsterdam use cases with be tested with more automation, with additional emphasis on platform stability and performance, and the three new functionalities (CM, Auto scaling, HPA). In addition, ensure the platform is stable as installed and deployed via OOM, if viable.
Use Cases
No new use cases. Instead the same use cases as Amsterdam will be tested using more automation and with additional emphasis on platform stability and performance. Test that the same use cases still work when ONAP is deployed via OOM.
vFW
vDNS
vCPE
VoLTE
Minimum Viable Product
CI/CD
Automatic unit testing, CSIT testing, and end-to-end testing
Guidelines, frameworks, or best practice recommendations on S3P testing for ONAP project teams.
Functionalities
List the functionalities that this release is committing to deliver by providing a link to JIRA Epics and Stories. In the JIRA Priority field, specify the priority (either High, Medium, Low). The priority will be used in case de-scoping is required. Don't assign High priority to all functionalities.
Epics
Stories
Longer term roadmap
It provides all the cross-project infrastructure framework and DevOps toolchain (Continuous Integration, etc.), code and scripts, best practice guidance, benchmark and testing reports and white papers related to:
Cross-project Continuous System Integration Testing (CSIT)
End-to-End (ETE) release use cases testing with VNFs with repeatability
Service design for end-to-end release use cases
Continuous Distribution (CD) to ONAP community integration labs
Reference VNFs that can be used to show how the ONAP platform handles
VNF installation and
VNF life cycle management
VNF Requirement compliance
Release Deliverables
Indicate the outcome (Executable, Source Code, Library, API description, Tool, Documentation, Release Note...) of this release.
Deliverable Name | Deliverable Description |
---|---|
To fill out | To fill out |
Sub-Components
List all sub-components part of this release.
Activities related to sub-components must be in sync with the overall release.
Sub-components are repositories and are consolidated in a single centralized place. Edit the Release Components name for your project in the centralized page.
Architecture
High level architecture diagram
At that stage within the Release, the team is expected to provide more Architecture details describing how the functional modules are interacting.
Indicate where your project fit within the ONAP Archiecture diagram.
Block and sequence diagrams showing relation within the project as well as relation with external components are expected.
Anyone reading this section should have a good understanding of all the interacting modules.
Platform Maturity
Refering to CII Badging Security Program and Platform Maturity Requirements, fill out the table below by indicating the actual level , the targeted level for the current release and the evidences on how you plan to achieve the targeted level.
Area | Actual Level | Targeted Level for current Release | How, Evidences | Comments |
---|---|---|---|---|
Performance | N/A |
| ||
Stability | N/A |
| ||
Resiliency | N/A |
| ||
Security | N/A |
| ||
Scalability | N/A |
| ||
Manageability | N/A |
| ||
Usability | N/A |
|
API Incoming Dependencies
List the API this project is expecting from other projects.
Prior to Release Planning review, Team Leads must agreed on the date by which the API will be fully defined. The API Delivery date must not be later than the release API Freeze date.
Prior to the delivery date, it is a good practice to organize an API review with the API consumers.
API Name | API Description | API Definition Date | API Delivery date | API Definition link (i.e.swagger) |
---|---|---|---|---|
To fill out | High level description of the API | Date for which the API is reviewed and agreed | To fill out | Link toward the detailed API description |
API Outgoing Dependencies
API this project is delivering to other projects.
API Name | API Description | API Definition Date | API Delivery date | API Definition link (i.e.swagger) |
---|---|---|---|---|
To fill out | High level description of the API | Date for which the API is reviewed and agreed | To fill out | Link toward the detailed API description |
Third Party Products Dependencies
Third Party Products mean products that are mandatory to provide services for your components. Development of new functionality in third party product may or not be expected.
List the Third Party Products (OpenStack, ODL, RabbitMQ, ElasticSearch,Crystal Reports, ...).
Name | Description | Version |
---|---|---|
Robot | Testing framework | |
Jenkins | CI/CD tool | |
Openstack | Cloud OS | |
Docker | Container platform | |
JMeter | Performance Testing tool | |
Chaos Monkey | Resilience Testing tool |
In case there are specific dependencies (Centos 7 vs Ubuntu 16. Etc.) list them as well.
Testing and Integration Plans
Provide a description of the testing activities (unit test, functional test, automation,...) that will be performed by the team within the scope of this release.
Describe the plan to integrate and test the release deliverables within the overall ONAP system.
Confirm that resources have been allocated to perform such activities.
The goal is to automate all the unit testing, CSIT testing, and end-to-end testing in release Amsterdam. The detailed test roles and responsibilities are listed below.
Types of Testing | Dev. Team | CSIT Team | E2E Team | S3P Team |
---|---|---|---|---|
Usability Testing | x | |||
Unit Testing | x | |||
Stability Testing | x | |||
Security Testing | x | |||
Scalability Testing | x | |||
Regression Testing | x | x | x | x |
Recovering Testing | x | x | ||
Performance Testing | x | |||
Integration/Pair-Wise Testing | x | |||
Install/Uninstall Testing | x | |||
Feature/Functional Testing | x | |||
End-to-End Testing | x | |||
Application Testing | x | |||
Acceptance Testing | x | x |
Gaps
This section is used to document a limitation on a functionality or platform support. We are currently aware of this limitation and it will be delivered in a future Release.
List identified release gaps (if any), and its impact.
Gaps identified | Impact |
---|---|
To fill out | To fill out |
Known Defects and Issues
Provide a link toward the list of all known project bugs.
Risks
List the risks identified for this release along with the plan to prevent the risk to occur (mitigation) and the plan of action in the case the risk would materialized (contingency).
Risk identified | Mitigation Plan | Contingency Plan |
---|---|---|
To fill out | To fill out | To fill out |
Resources
Fill out the Resources Committed to the Release centralized page.
Release Milestone
The milestones are defined at the Release Level and all the supporting project agreed to comply with these dates.
Team Internal Milestone
This section is optional and may be used to document internal milestones within a project team or multiple project teams. For instance, in the case the team has made agreement with other team to deliver some artifacts on a certain date that are not in the release milestone, it is erecommended to provide these agreements and dates in this section.
It is not expected to have a detailed project plan.
Date | Project | Deliverable |
---|---|---|
To fill out | To fill out | To fill out |
Documentation, Training
Highlight the team contributions to the specific document related to he project (Config guide, installation guide...).
Highlight the team contributions to the overall Release Documentation and training asset
High level list of documentation, training and tutorials necessary to understand the release capabilities, configuration and operation.
Documentation includes items such as:
Installation instructions
Configuration instructions
Developer guide
End User guide
Admin guide
...
Note
The Documentation project will provide the Documentation Tool Chain to edit, configure, store and publish all Documentation asset.
Other Information
Vendor Neutral
If this project is coming from an existing proprietary codebase, ensure that all proprietary trademarks, logos, product names, etc. have been removed. All ONAP deliverables must comply with this rule and be agnostic of any proprietary symbols.
Free and Open Source Software
FOSS activities are critical to the delivery of the whole ONAP initiative. The information may not be fully available at Release Planning, however to avoid late refactoring, it is critical to accomplish this task as early as possible.
List all third party Free and Open Source Software used within the release and provide License type (BSD, MIT, Apache, GNU GPL,... ).
In the case non Apache License are found inform immediately the TSC and the Release Manager and document your reasoning on why you believe we can use a non Apache version 2 license.
Each project must edit its project table available at Project FOSS.
Charter Compliance
The project team comply with the ONAP Charter.