Integration R1 Release Planning


Overview

Project Name

Enter the name of the project

Project Name

Enter the name of the project

Target Release Name

Amsterdam

Project Lifecycle State

Incubation

Participating Company 

Huawei, AT&T, China Mobile, China Telcom, Orange, VMware, Wind River, Amdocs, ZTE, TechMahindra

Scope

What is this release trying to address?

Based on the vCPE and VoLTE use cases, this project will provide cross-project system integration, CI/CD, and all related end-to-end release use cases testing with VNFs necessary for the successful delivery and industry adaption of the ONAP project as a whole.

Use Cases

Integration will support both vCPE and VoLTE use cases.

Minimum Viable Product

  • CI/CD

  • Automatic docker image building

  • Automatic unit testing, CSIT testing, and end-to-end testing

Functionalities

List the functionalities that this release is committing to deliver by providing a link to JIRA Epics and Stories. In the JIRA Priority field, specify the priority (either High, Medium, Low). The priority will be used in case de-scoping is required. Don't assign High priority to all functionalities.

Epics

key summary type created updated due assignee reporter priority status resolution
Loading...
Refresh

Stories

key summary type created updated due assignee reporter priority status resolution
Loading...
Refresh



Longer term roadmap

It provides all the cross-project infrastructure framework and DevOps toolchain (Continuous Integration, etc.), code and scripts, best practice guidance, benchmark and testing reports and white papers related to:

  • Cross-project Continuous System Integration Testing (CSIT)

  • End-to-End (ETE) release use cases testing with VNFs with repeatability

  • Service design for end-to-end release use cases

  • Continuous Distribution (CD) to ONAP community integration labs

  • Reference VNFs that can be used to show how the ONAP platform handles

Release Deliverables

Indicate the outcome (Executable, Source Code, Library, API description, Tool, Documentation, Release Note...) of this release.

Deliverable Name

Deliverable Description

Deliverable Name

Deliverable Description

CI/CD tool chain

Scripts and definitions to build and test the code.

Scrips to build and release docker images.

Testing docs and tools

Documentation to define and suggest multiple types of testing.

Scripts to implement and automate testing.

Bootstrap docs and tools

Docs and tools to install and test ONAP infrastructure components for new developers.



Sub-Components

List all sub-components part of this release.
Activities related to sub-component must be in sync with the overall release.

Sub-components are repositories are consolidate in a single centralized place. Edit the Release Components name for your project in the centralized page.

ONAP Dependencies

This project depends on all the other ONAP projects.

Architecture

High level architecture diagram

At that stage within the Release, the team is expected to provide more Architecture details describing how the functional modules are interacting.

Block and sequence diagrams showing relation within the project as well as relation with external components are expected.

Anyone reading this section should have a good understanding of all the interacting modules.

API Incoming Dependencies

N/A

API Name

API Description

API Definition Date

API Delivery date

API Definition link (i.e.swagger)

API Name

API Description

API Definition Date

API Delivery date

API Definition link (i.e.swagger)

To fill out

High level description of the API

Date for which the API is reviewed and agreed

To fill out

Link toward the detailed API description

API Outgoing Dependencies

N/A

API Name

API Description

API Definition Date

API Delivery date

API Definition link (i.e.swagger)

API Name

API Description

API Definition Date

API Delivery date

API Definition link (i.e.swagger)

To fill out

High level description of the API

Date for which the API is reviewed and agreed

To fill out

Link toward the detailed API description

Third Party Products Dependencies

Third Party Products mean products that are mandatory to provide services for your components. Development of new functionality in third party product may or not be expected.
List the Third Party Products (OpenStack, ODL, RabbitMQ, ElasticSearch,Crystal Reports, ...).

Name

Description

Version

Name

Description

Version

Robot

Testing framework



Jenkins

CI/CD tool



Openstack

Cloud OS



Docker

Container platform



In case there are specific dependencies  (Centos 7 vs Ubuntu 16. Etc.) list them as well.

Testing and Integration Plans

Provide a description of the testing activities (unit test, functional test, automation,...) that will be performed by the team within the scope of this release.

Describe the plan to integrate and test the release deliverables within the overall ONAP system.
Confirm that resources have been allocated to perform such activities.



The goal is to automate all the unit testing, CSIT testing, and end-to-end testing in release Amsterdam. The detailed test roles and responsibilities are listed below.

Types of Testing

Dev. Team

CSIT Team

E2E Team

S3P Team

Types of Testing

Dev. Team

CSIT Team

E2E Team

S3P Team

Usability Testing

x







Unit Testing

x







Stability Testing







x

Security Testing







x

Scalability Testing







x

Regression Testing

x

x

x

x

Recovering Testing





x

x

Performance Testing







x

Integration/Pair-Wise Testing



x





Install/Uninstall Testing

x







Feature/Functional Testing

x







End-to-End Testing





x



Application Testing

x







Acceptance Testing



x

x



Gaps

This section is used to document a limitation on a functionality or platform support. We are currently aware of this limitation and it will be delivered in a future Release.
List identified release gaps (if any), and its impact.

Gaps identified

Impact

Gaps identified

Impact

To fill out

To fill out

Known Defects and Issues

Provide a link toward the list of all known project bugs.

key summary type created updated due assignee reporter priority status resolution
Loading...
Refresh

Risks

List the risks identified for this release along with the plan to prevent the risk to occur (mitigation) and the plan of action in the case the risk would materialized (contingency).

Risk identified

Mitigation Plan

Contingency Plan

Risk identified

Mitigation Plan

Contingency Plan

To fill out

To fill out

To fill out

Resources

Fill out the Resources Committed to the Release centralized page.

Release Milestone

The milestones are defined at the Release Level and all the supporting project agreed to comply with these dates.

Team Internal Milestone

This section is optional and may be used to document internal milestones within a project team or multiple project teams. For instance, in the case the team has made agreement with other team to deliver some artifacts on a certain date that are not in the release milestone, it is erecommended to provide these agreements and dates in this section.

It is not expected to have a detailed project plan.

Date

Project

Deliverable

Date

Project

Deliverable

To fill out

To fill out

To fill out

Documentation, Training

  • Highlight the team contributions to the specific document related to he project (Config guide, installation guide...).

  • Highlight the team contributions to the overall Release Documentation and training asset

  • High level list of documentation, training and tutorials necessary to understand the release capabilities, configuration and operation.

  • Documentation includes items such as:

    • Installation instructions

    • Configuration instructions

    • Developer guide

    • End User guide

    • Admin guide

    • ...

Note

The Documentation project will provide the Documentation Tool Chain to edit, configure, store and publish all Documentation asset.


Other Information

Vendor Neutral

If this project is coming from an existing proprietary codebase, ensure that all proprietary trademarks, logos, product names, etc. have been removed. All ONAP deliverables must comply with this rule and be agnostic of any proprietary symbols.

Free and Open Source Software

FOSS activities are critical to the delivery of the whole ONAP initiative. The information may not be fully available at Release Planning, however to avoid late refactoring, it is critical to accomplish this task as early as possible.
List all third party Free and Open Source Software used within the release and provide License type (BSD, MIT, Apache, GNU GPL,... ).
In the case non Apache License are found inform immediately the TSC and the Release Manager and document your reasoning on why you believe we can use a non Apache version 2 license.

Each project must edit its project table available at Project FOSS.

Charter Compliance

The project team comply with the ONAP Charter.

Release Key Facts

Fill out and provide a link toward the centralized Release Artifacts.