Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 6 Next »

***** Please note that the meeting Zoom bridge has been changed since May 23rd, 2023 *****

Meeting Logistics

Meeting URL QRMeeting TimeMeeting Zoom Bridge


Every Tuesday:

  • 14:00 UTC

  • 10AM EDT (New York)


Quick References to Main Sections on this page


  • Component Reviews Dashboard
    • London-R13 Component Reviews Dashboard - (works best with Firefox)
    • Note: the London-R13 architecture diagram will be changed based on the ongoing architecture review (e.g., YANG Utils app, MSB, APPC and others)


**** Record the meeting ***

Today's Agenda

(Back to "Quick References")



Sponsor(s)/Presenter(s)

DurationTopicReferenced Docs or JIRAComments
1stN Shankar30 minsONAP 5G SON Use Case R13 Requirements

ONAPARC-786 - Getting issue details... STATUS

ONAP 5G SON R13 Requirements

  • RAN-SIM enhancement: included in OOM
  • CPS enhancement - CNCF format and completion of CM update work
2nd30 minsAlign with 3gpp SA5 based on existing onap general intent model and intent interface solution


Discussion how to align with 3gpp SA5 based on existing onap general intent model and intent interface solution
3rd30+ minsSeparation of ONAP components

Separation of ONAP components



Meeting Recording


2023-07-18 Topics (Jira's) Scheduled for Review

(Back to "Quick References")

key summary description status resolution
Loading...
Refresh

Item(s) that might be of interest

  • FYI (GitHub Basic Password Authentication Deprecation)
"Basic authentication using a password to Git is deprecated and will soon no longer 
work. Visit https://github.blog/2020-12-15-token-authentication-requirements-for-git-operations/
for more information around suggested workarounds and removal dates."

Next week Agenda Candidates

Ongoing Studies

(Back to "Quick References")

(Back to "Quick References")

London-R13  Component Architecture Reviews Dashboard Page

Montreal-R13 ONAP Components Arch Reviews Dashboard

Motreal-R13

Current Release Arch Review Tracking - when available


Referenced Materials

London-R13 Release Topics(JIRA) Scheduled for Review

(Back to "Quick References")


key summary description status resolution
Loading...
Refresh

London-R13 Component Reviews

(Back to "Quick References")

key summary description status resolution
Loading...
Refresh


London-R13 Functional Requirements

(Back to "Quick References")

key summary description status resolution
Loading...
Refresh


London-R13 Use Cases

(Back to "Quick References")

key summary description status resolution
Loading...
Refresh


London-R13 PoC

(Back to "Quick References")

key summary description status resolution
Loading...
Refresh



London-R13 All Jira's

(Back to "Quick References")

key summary description status resolution
Loading...
Refresh





  • No labels