Date
Attendees
Agenda
- Testing status for Jakarta release - Testing is on track and target is to close test cases by Thursday 4/28
- Requirements for Kohn release -
- A1 Policy schema for ANR
Notes
Item | Who | Notes |
---|---|---|
Kohn release reqs | Discussed reqs in following table. Will create JIRA as needed after discussion converges. Need to determine feasibility of work for SON-Handler MS and Policy. | |
A1 - based action | 3/30 Good discussion on including A1-based action. Vishal Varvate is interested in contributing. He will work with John Keeney (Ericsson EST) .
4/19 Vishal needs info on A1 policy schema for ANR use case. Discussed details. Shankar to follow up. 4/26: Discussed control loop message formats for PCI and ANR and ANR policy schema. They are using same Policy name but different Control-Loop name and different Action. See sample messages in file. Changes to ANR message format and control loop policy has impact on SON-Handler MS and Policy. | |
RAN-Sim | 3/8 Further discussion on including netopeer in RAN-Sim. See slides 2-6 in ppt attached here. 3/30 Vishal presented slides below. We had a good discussion. Option 2 gives a little more flexibility for future use. John said they are willing to help with the A1 termination. 4/19 Discussed change in terminology to avoid confusion. We are not implementing Near-RT RIC and xApp using OSC near-rt-ric. Decision to change terminology to better capture the nature of the RAN-Sim enhancement. Plan is to implement
|