PNF Software Upgrade with Schema Update CSIT Test case details.
Test-Case Id | Test Case | Test Type | Status |
---|---|---|---|
TEST-CASE-1 | Test Check in SDNC certificates to connect node are properly installed | Integration(robot) | Blocked |
TEST-CASE-2 | Test Blue print archive is properly uploaded to blueprint-processor | Integration(robot) | Blocked |
TEST-CASE-3 | Test resource package and service is successfully distributed from SDC to SO | Integration(robot) | Blocked |
TEST-CASE-4 | Test Service Level workflows are successfully fetched from SO | Integration(robot) | Blocked |
TEST-CASE-5 | Test Service instantiation is triggered from VID to SO and status is COMPLETED for Service Level Upgrade workflow | Integration(robot) | Blocked |
TEST-CASE-6 | Verify on PNF-simulator that there is pnf_sw_version-4.0.0 entry added into the list and its status is ACTIVATION-COMPLETED | Integration(robot) | Blocked |
TEST-CASE-7 | Verify on AAI-Simulator that for pnf PNFDemo sw-version is pnf_sw_version-4.0.0. | Integration(robot) | Blocked |
Test Cases Details:
All the test cases for are robot tests that can be ran automatically from the same steps which will be shown below.
Testing Steps |
| ||||||||||||
Status (Pass/Fail) | ONAP Jira Ticket: · https://jira.onap.org/browse/INT-1591 · https://jira.onap.org/browse/INT-1592 · https://jira.onap.org/browse/INT-1593 ONAP PNF SW Upgrade Daily CSIT Tests: · TODO | ||||||||||||
Testing Lab | CSIT PNF SW Upgrade https://jenkins.onap.org/job/usecases-master-verify-csit-pnf-sw-upgrade/ |
Test Case ID | Test Case Name | Description | Release |
TEST-CASE-1 | Test Check in SDNC certificates to connect node are properly installed | This test will check whether the keystore is setup and certificates installed for SDNC and ODL once SDNC is installed | Guilin |
TEST-CASE-2 | Test Blueprint archive is properly uploaded to blueprint-processor | Test Blueprint archive is properly uploaded to blueprint-processor | Guilin |
TEST-CASE-3 | Test resource package and service is successfully distributed from SDC to SO | Test resource package and service is successfully distributed from SDC to SO | Guilin |
TEST-CASE-4 | Test all the PNF workflows are successfully fetched from SO | Test all the PNF workflows are successfully fetched from SO | Guilin |
TEST-CASE-5 | Test Service instantiation is triggered from VID to SO and status is COMPLETED for preparation (Download) workflow | Test Service instantiation is triggered from VID to SO and status is COMPLETED for preparation (Download) workflow | Guilin |
TEST-CASE-6 | Verify on PNF-simulator that there is pnf_sw_version-2.0.0 entry added into the list and its status is DOWNLOAD-COMPLETED | Verify on PNF-simulator that there is pnf_sw_version-2.0.0 entry added into the list and its status is DOWNLOAD-COMPLETED | Guilin |
TEST-CASE-7 | Test Service instantiation is triggered from VID to SO and status is COMPLETED for software upgrade workflow | Test Service instantiation is triggered from VID to SO and status is COMPLETED for software upgrade workflow | Guilin |
TEST-CASE-8 | Verify on PNF-simulator that there is pnf_sw_version-3.0.0 entry added into the list and its status is ACTIVATION-COMPLETED | Verify on PNF-simulator that there is pnf_sw_version-3.0.0 entry added into the list and its status is ACTIVATION-COMPLETED | Guilin |
TEST-CASE-9 | Verify on AAI-Simulator that for pnf PNFDDemo sw-version is pnf_sw_version-3.0.0 | Verify on AAI-Simulator that for pnf PNFDDemo sw-version is pnf_sw_version-3.0.0 | Guilin |