Z-ARCHIVE: El Alto Early Drop Integration Testing Status
Early Drop testing will focus on automated testing via robot and other test scripts. We will not have 100% coverage but should have enough sanity testing to confirm the changes for El Alto have not created breakage.
El Alto Early Drop was cancelled due to schedule issues that stemmed from the environment , self-release process and CLA changes that impacted the delivery teams.
Focus will be on the El Alto Release.
Color Guide
For 2019-08-01 - ONLY Completed items should be green.
Completed
Progressing >= 90%
Progressing <90%
# | Use Case Functional Requirement Nonfunctional Requirement | Test Cases | Lab | Integration Test Lead | Status (remaining days of effort) | Video URL | Detailed Test Status | Quick Notes |
---|---|---|---|---|---|---|---|---|
1 | Model Driven Control Loop Design | (vDNS is part of scale out use case below #10) | Intel / Windriver | @Brian Freeman / @Marco Platania | Onboard - PASS Instantiate - PASS (dublin SO) closedloop - pending APPC/AAF patch | https://lf-onap.atlassian.net/browse/DMAAP-1272 https://lf-onap.atlassian.net/browse/SO-2229 https://lf-onap.atlassian.net/browse/SO-2228 https://lf-onap.atlassian.net/browse/SDNC-855 https://lf-onap.atlassian.net/browse/OOM-2060 AAF-942: APPC is not able to get perm with AAF 2.1.15Closed | ||
2 | vCPE Integration Test Case | Intel / Windriver | @Brian Freeman | Onboard & Instantiate Infra - PASS vBNG - PASS vGMUX -PASS vBRG - PASS RestCustService - PASS Closed Loop: Pending | Dublin SO vcpe.py infra succeeds distributevCPEResCust | |||
3 | vCPE with TOSCA | vCPE(tosca) with HPA - Integration test cases | Intel / Windriver | @Haibin Huang @Yan Yang | Unlikely | |||
4 | 5G - Realtime PM and High Volume Stream Data Collection | 5G - Real Time PM and High Volume Stream Data Collection - Integration Test Cases | Intel / Windriver | @Marcin Przybysz @marekPL | Planned (hv-ves ete script) | |||
5 | 5G - PNF PnP | 5G - PNF PnP - Integration Test Cases | Intel / Windriver | @Marcin Przybysz @Krzysztof Kuzmicki | Planned Heat and Tosca | |||
6 | 5G - Bulk PM | 5G - Bulk PM - Test Status | Intel / Windriver SB-02 | @Former user (Deleted) | CSIT - Automated Test - PASS | https://jenkins.onap.org/view/CSIT/job/usecases-master-csit-5G-bulkpm/ | ||
7 | 5G - PNF Configuration via Netconf - Test Status | Intel/ Windriver | @Rahul Tyagi @Eric Moore @Raj Gumma | Planned Will run automation test for configuration-via-netconf after changing image versions of El-Alto release With PnP+Conf-over-Netconf manual testing is planned | ||||
8 | 5G - PNF Pre-Onboarding & Onboarding | 5G - Preonboarding/Onboarding - Test Status | Intel / Windriver | PNF Preonboarding (VNF SDK): @Marcin Przybysz @Krzysztof Kuzmicki @Dermot Melia PNF Onboarding (SDC): @Andy Walshe | Planned | |||
9 | 5G - OOF and PCI | 5G - OOF and PCI - Integration Test Cases | Windriver | @Swaminathan Seetharaman@krishna moorthy | N/A | No automation done yet, and not planned for El Alto. We will be doing some manual tests. | ||
10 | Scale Out | Scale Out - Integration Test Cases and Status (vLB) | Intel / Windriver | @Scott Blandford, @Marco Platania | Scale out with manual trigger and preload works. Planned test for closed-loop-based scale out | Progress: 50% | Closed-loop-based scale out test waiting for: SDNC-872: SDNC not handling CSAR packages with Policy modelsClosed CDS installation procedure to be completed CLAMP to onboard new GUI (not a blocker) | |
11 | CCVPN | CMCC | @Yan Yang | Hardware required not known if in ED testing scope | ||||
12 | HPA vFW/vDNS | vFW/vDNS HPA Testing(Test Plan 1 in | Intel / Windriver | @Itohan Ukponmwan (Deactivated)@Eric Multanen | Planned | |||
13 | Change Management - Flexible Designer & Orchestrator | Steps: 1) Designing custom workflows with Workflow Designer 2) Distributing custom workflows to SO 3) Deploying the custom workflow in SO 4) Sending workflow metadata to VID 5) Triggering custom workflow execution from VID 6) Executing custom workflows in SO | Intel / Windriver | @Ajay Mahimkar @Elena Kuleshov @pagarwal @Chris Rapposelli-Manzo | Most likely | |||
14 | Steps: 1) Creating VNF profile using CDT 2) Designing custom workflows with Workflow Designer 3) Distributing custom workflows to SO 4) Deploying the custom workflow in SO 5) Sending workflow metadata to VID 6) Triggering custom workflow execution from VID 7) Executing custom workflows in SO | Intel / Windriver | @Lukasz Rajewski @Michal Chabiera @Tomek Osiński @Ajay Mahimkar @Elena Kuleshov | Brian to follow Lukasz Onboard - PASS Instantiate - PASS (Dublin SO) ClosedLoop - Pending APPC / AAF Patch | ||||
15 | Change Management - 5G PNG Software Upgrade | Change Management - 5G PNF Software Upgrade Integration Test Status | Intel / Windriver | @wangyaoguang @Ruchira Agarwal | unlikely | |||
16 | Change Management - Schedule Optimization | Intel / Windriver | @Ajay Mahimkar @Jerry Flood | unlikely | ||||
17 | @David Perez Caparros @dbalsige | Requires Swisscom Lab | ||||||
18 | Vodafone | @Prabhu Balan | ||||||
19 | Deploy vFW Helm Chart using Multicloud K8s Plugin in Kubernetes Cloud | intel / Windriver | @Akhila Kishore (Deactivated) @Former user (Deleted) | |||||
20 | Deploy EdgeXFoundry Helm Chart using Multicloud K8s Plugin in Kubernetes Cloud | Intel/ Windriver | @Akhila Kishore (Deactivated) @Kiran | |||||
21 | 5G: Network Slicing Modeling | Amdocs | @Borislav Glozman | |||||
25 | Improve our E2E Process Automation | @Eric Debeau @Alexis de Talhouët @A. Seaudi @Yuriy Malakov @Marco Platania | Planned Abdel with automated robot | |||||
30 | SOL 004 (VNF Package Security) | Ericsson, Intel / Windriver | @Samuli Kuusela | Possibly with PNF pre-onboarding | ||||
31 | xNF communication security enhancements. | xNF communication security enhancements - Tests Description and Status | @Marcin Przybysz | Planned to add CSIT | ||||
34 | HPA vIPsec | vIPsec HPA testing | Intel / Windriver | @ruoyu.ying | Planned | |||
35 | Health Checks for PODS | Percentage coverage of Health Checks for Running PODS | Integration | @FREEMAN, BRIAN D , @Sylvain Desbureaux | ||||
36 | New Installation Tests in 3 labs | |||||||
Intel/Windriver | Planned | |||||||
Orange | Planned | |||||||
Ericsson Lab | Andrew Fenner | Planned | ||||||
OWL ? | Brian to to talk to Tracy | |||||||
Robot Keyword Testing | ||||||||
init_robot | PASS | |||||||
init | PASS | |||||||
health | PASS | See below | ||||||
eteHelm-k8.sh | 46/49 PASS - release | Basic APPC Health Check | FAIL | Basic CLAMP Health Check | FAIL | Basic OOF-CMSO Health Check | FAIL | | ||||||
healthdist | PASS (dublin SO) | |||||||
instantiateVFWCL | PASS (dublin SO) | |||||||
instantiateVFWDT | PASS (dublin SO) | |||||||
distributeVCPEResCust | PASS | |||||||
sdc-dcae-d | PASS | |||||||
vcpe.py | init : PASS infra: PASS brg: customer: loop: |
8/14/2019
SB-00 - oom-staging for testing 43/49 working. up to SDC model onboarding healthdist stage.
cassandra config issue for SDC - re-deploying SDC ; Cassandra tuning for windriver with multiple clients ?
integration-staging-daily - day of testing
integration-release-daily - day of testing
SB01/SB02 - shutdown for resources
Performance Infrastructure Tests (ORange) ?
Can we run them in Windriver once a week (weekend - a long suite of tests) - requires admin access
Openstack ?
Kuebernetes ? - smoke test ; full test
1. Get an account with admin access dedicated to this function/small team
2. vSwitch tests ?
3. OPNFV testing package
a. FUNCTest
b. shaker, vmtp, full templest , rally
c. vnf testing to confirm openstack heat engine / infrastructure
d. Demo ? next week 8/21 ?
Labs for Testing
Integration Team:
Integration-release-daily: this should be main lab for automated script testing
Integration-staging-daily: for patch testing in advance of updates to release-daily
Integration-SB00 - Main staging and our current most stable environement - hope to move work to SB04 by end of week.
Integration-SB04 - Main release testing for El Alto ED that needs to stay for a days for trouble shooting etc.
Orange to focus on oom:master release branch to push hard on getting that ready , now that everything planned has a release image in nexus3
Project Teams
Integration-Design (Available) : SDC model onboarding and distribution
Integration-Instantiation (In Progress) : VID instantiate to VNF deployed - DEFERRED
Integration-ClosedLoop (Available) : VNF already instantiated. DCAE, Policy, AAI, APPC,SDNC flows