Date
Attendees
- Vimal Begwani
- Floyd Goldstein
- Albino Pinho
- Rebecca Lantz
- Rakesh Sinha
- David Perez Caparros
- Anurag Sharma
- James Forsyth
- Min Yoon
- wangyaoguang
- marge.hillis
- Former user (Deleted)
- Fei Zhang (Ericsson)
- N.K. Shankaranarayanan
Table of Key Presentations/Overviews
DATE | TOPIC | PRESENTER | DESCRIPTION |
Apr 10, 2019 | Controller LCM API Evolution |
| |
May 1, 2019 | A&AI GraphGraph Visualizer | Visualizer for A&AI Model Layout | |
May 8, 2019 | A&AI Model Browser, Sparky | A&AI developer Model Browser to navigate and viewing attributes, object types & edge view Recording & Slides: Use Case Realization Call: May 8, 2019 | |
May 15, 2019 | A&AI Run Time Browser (Sparky) | A&AI Run-Time Browser | |
May 22, 2019 | Edge Automation Overview | Central & Distributed Edge ONAP configuration. Topics include: Onboarding, Instantiation, Edge Orchestration, A&AI, Architecture, Work-flows, Multi-Tenancy | |
May 29, 2019 | Modeling S/C , Use Case Project Teams, Architecture S/C Way of Working | Model S/C (Sub committee) contributions page: | |
Jun 5, 2019 | Use Case slides for Dev. Forum | Benjamin Cheung | Use Case Realization Call: June 5, 2019 |
Jun 12, 2019 | (No Meeting) | Developer's Forum | (No Meeting) |
Jun 19, 2019 | |||
Jun 26, 2019 | PNF Software Upgrade | ||
Discussion items
Time | Item | Who | Notes |
Business Drivers | Discussion of Business Imperatives added to Use Case Pages From U/C S/C call on Monday May 6 See example from PNF PNP and PNF Pre-onboarding/onboarding PNF PREONBOARDING / ONBOARDING in R6 Frankfurt BUSINESS DRIVERS TEMPLATE: | ||
R5 El Alto Cadence Release Proposal (EUAG / End-User Advisory Group) | https://wiki.lfnetworking.org/display/LN/EUAG+2019-04-09+meeting+minutes Summary: The R5 El Alto release could be shortened and focus on internal (tech) debt and defect backlogs. A proposed release cycle is presented. | ||
Agile Process vs Waterfall Process | Will ONAP move to a an Agile Sprint-based process vs Waterfall Process | ||
R4/Dublin (RC2) May 30, 2019 | Release Candidate 0 - End 2 End Release Test Cases and End 2 End functional Test Cases. Project Team focused its effort on:
R4 Dublin Release Planning Wiki: Release Planning Score Card: M4 Dublin Release Requirements testing & Integration status: Dublin Release Integration Testing Status RC2 passed (TSC Jun 6 2019) | ||
PLATFORM TOPICS: Controller to NF Association | R5/R6 Topic See Slides Nov 6, 2018. Development of Controller to NF assignment association S/W. | ||
PLATFORM TOPICS: Data Persistency | STATUS: Work for ConfigDB completed, not merged in R4 Dan Timoney moved to R5, one Jira for ConfigDB. One issue about merging. ONAP code added can take a test ONAP deployment to have the ConfigDB work. USE CASE REALIZATION MEETING (Notes 2019-01-30) U/C Cross-Interaction, Persistency | ||
PLATFORM TOPICS: Controller LCM API Evolution | Goals (Architecture Evolution)
Present at the Arch S/C Apr 9 (Tue) second presentation. | ||
USE CASES: BBS U/C Evolution | BBS Evolution - Slide set linked in R6 proposed U/C. List of proposals & functional requirements.
| ||
USE CASES/5G: PM Dictionary/FM MD GUI | FM META DATA & PM DICTIONARY in R5 | ||
USE CASES/5G: Preonboarding/Onboarding | PNF PREONBOARDING / ONBOARDING in R5 | ||
USE CASES: Modeling gNB/5G RAN | Align, harmonize, reconcile various information models to ONAP model: Expand & verify model and harmonize with the ONAP internal information & data model: ETSI SOL001 ... 007 with ONAP internal Model PNFD modeling (Model S/C) 5G Model (3GPP) ORAN (WGs) Open ROADM (reconfig optical add/drop multiplexer) ONF ISOMII OTCC (Optical transport config & control) - Use Cases that need transport models need some model consistency. - Try a Use Case with extended ONAP model & real equipment. | ||
Arch S/C PNF POB/OB Flow | Arch S/C Information Flows: New Information flow for Preonboarding/Onboarding xNF packages/resources. | ||
A&AI - Model Browser | A&AI updates - presentation given Jun 5 2019 about new views being developed in A&AI. Recording - 2019-06-05 AAI Meeting Notes graphgraph + model browsers. (Pavel in progress) | ||
IoT Service Creation | IoT Create Services on 5G June 19, 2019 | ||
O-RAN Modeling & alignment with ONAP | Melanie Sater | work with Open RAN alliance availability of 3GPP baseline (that vendor & operators agreed upon) add to ONAPs information model and expand existing management I/F for CM management. want to plug them into ONAP and facilitate the 5G and other use cases working these open I/F specifications. For El Alto WG-1,3,6. Configuration management NetConf YANG specification derived from info model aligned w/ 3GPP RM & existing 3GPP info-model. Papyrus. Which 5G U/C good candidates verification w/ evolving model. PNF PnP/OOF? Near Real Time RIC. WG-4 open Front Haul. In PCI/SON U/C - the SDN-R Interaction w/ RAN simulator is Netconf/YANG based. In R5 we could see what parts of the model would come from ORAN May 15 2019 Update: Early stage information model that pre-dates O-RAN and was used for PCI use case with ONAP rel 2 Beijing is being carried forward to O-RAN O1 CM interface specification; refer to https://wiki.onap.org/download/attachments/28382769/RAN_Info_Model_Rel_0.pptx?api=v2 Attributes similar with LTE. 5G Architecture evolution. | |
New Use Case in 5G for RAN Standards harmonization with ONAP |
Use Case WIKI: MOBILITY STANDARDS HARMONIZATION WITH ONAP | ||
New Use Case in 5G for Licensing Management | Timo Perala | New U/C added to the 5G Use Cases for Licensing Management Use case Wiki: LICENSING MANAGEMENT | |
OOF/PCI | PoC U/C will happen in WinLab. to meet time lines do those parts in Wind river focusing on DCAE, Policy and OOF. Jira SDN-C (Dan Timoney) pushed El Alto (the Maintenance Release). | ||
Developers Forum (R5/R6) Sweden | https://wiki.lfnetworking.org/display/LN/June+2019+LFN+DDF+Schedule |
SUPPORTING DOCUMENTATION
Document | File |
---|---|
R6 Use Case Analysis & Cross-Interaction Matrix |
RECORDING
Recording | FILE |
---|---|
Zoom Video & Audio (MP4) | |
Audio Only (M4A) | |
Playback (M3U) | |
Chat (Txt) |