BUSINESS DRIVER (Bulk PM, RT PM, PM Dictionary)
This section describes Business Drivers for this Use Case.
Executive Summary - A summary for the PM functions:
- BULK PM develops the capability for the PNF/VNF to send performance measurement data to ONAP. A file ready is sent via VES and the files are pulled via sftp. PNF/VNFs collects performance measurement data periodically (configurable). It also introduces the parsing of files (3GPP defined format) conversion to VES format.
- REAL-TIME PM -
- PM DICTIONARY -
Business Impact - It provides a generic ability which ONAP service providers will find useful for the collection of PM information. Performance measurements is viewed as a fundamental capability for Network Elements, "P" in FCAPS. General PM capability most network functions will likely have measurements. The framework of file transfer can be used in future use cases as well.
Business Markets - This capability is added for 5G it is generic and could be used for other services as well. It could be applicable to other products beyond 5G most domains will likely have measurement files including transport.
Funding/Financial Impacts - This capability, once developed, will be able to be used by any service provider deploying and using ONAP. Thus, driving cost savings so that Bulk PM functionality doesn't have to be redeveloped multiple times. This is an enabler for closed-loop automation to collect data to detect anomalous conditions. As such, it can have a large potential OPEX savings impact.
Organization Mgmt, Sales Strategies - There is no additional organizational management or sales strategies for this use case outside of a service providers "normal" ONAP deployment and its attendant organizational resources from a service provider.
Scope
Continuation of Bulk PM feature from Casablanca. Enhancements in Dublin include
|
Proposed use cases:
- UC1: 3GPP PM Counter collection and VES creation in ONAP
- UC2: Closed Loop support using 3GPP PM data
Additional requirements for bulk PM enhancements:
- DFC robustness enhancement (FileReady for all files on the node; DFC retry handling)
- DMaaP DR enhanced handling of PM feeds (enhancements for DFC metadata; optional DR consumer specified feed compression handling; support for various deployments)
Presentation (from ONAP face-to-face Jan 2019):
Development Status
Project | PTL | JIRA | Description |
---|---|---|---|
DCAE | DCAEGEN2-1038: Introduce "3GPP PM Mapper" service | Creation of 3GPP PM Mapper service, including:
| |
DCAE | Vijay Venkatesh Kumar | DCAEGEN2-1039: DFC enhancements to support Bulk PM | Enhancements to Data File Collector, including:
|
VNFRQTS | VNFRQTS-513: Updated FileReady requirement to add optional re-reporting | Modified VNF reqs for Data File Collector robustness enhancements:
| |
DMaaP | Bhanu Ramesh | DMAAP-912: Data Router updates to support Bulk PM | Data Router enhancements to support Bulk PM use cases, including:
|
SDC | Ofir Sonsino | SDC-2011: Design Studio (DCAE-DS) support for Bulk PM | SDC and DS support for PM Dictionary and PM Mapper configuration, including:
|
Test Status
E2E Test:
Tests per component:
- 3GPP PM Mapper Testcases & Status
- Datafile-collector test-cases and status
- DMAAP Data Router Test Cases & Status