This is a continuation of the use case started in Casablanca: 5G - PNF Software Update
Scope
For Dublin the main addition is introduction of an upgrade option based on direct NETCONF interface between the ONAP controller and the PNF. Other areas include VID and SO for re-usable high-level SW upgrade workflows.
This UC is a stretch goal for Dublin.
Presentation:
Development Status
Proposed Dublin scope presented Dec 20, 2018 to the 5G UC meeting.
Project | PTL | JIRA | Description | Status |
---|---|---|---|---|
APPC SDNC CCSDK |
| |||
SO VID |
|