In progress
We will use vFW use case as the baseline to test this:
Pre-requirement: Instantiate a vFW with closed loop running.
Time (EDT) | Categories | Sub-Categories (In Error Mode Component) | Time to Detect Failure and Repair | Pass? | Notes |
---|---|---|---|---|---|
VNF Onboarding and Distribution | SDC | ||||
SO | |||||
A&AI | |||||
SDNC | |||||
VNF Instantiation | SDC | ||||
VID | |||||
SO | |||||
A&AI | |||||
SDNC | |||||
MultiVIM | |||||
Closed Loop | DCAE | ||||
DMaaP | |||||
Policy | |||||
A&AI | |||||
APPC (3-node cluster) |
Requirement
Area | Priority | Min. Level | Stretch Goal | Level Descriptions (Abbreviated) |
Resiliency | High | Level 2 – run-time projects | Level 3 – run-time projects | •1 – manual failure and recovery (< 30 minutes) |