Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

This page is a work-in-progress and details getting the ONAP Demo (or pieces of it) running on a bare metal OPNFV installation (OpenStack Newton) in an office.

ONAP resource consumption made it impossible to deploy the demo on an all-virtual, Newton Triple-O installation running on an Intel Intel(R) Xeon(R) CPU E5-2699 v4 @ 2.20GHz server with 22 cores and 128 GB RAM.


Hardware

  • 1 Intel NUC 5i7RYH
    • Intel Core i7-5557U processor
    • 16 GB RAM
    • 1 ethernet port
  • 2 SuperMicro 5018D-FN4T 1U servers
  • 2 Netgear Routers (WNR2000v5, WNR3500U)
  • 1 8-port switch

Configuration

The Netgear routers function as dumb gateways for Admin and Public networks.

OpenStack Installation

I am using the OPNFV Triple-O installer (Danube release). The NUC serves as the jumphost and the Super Micro servers act as compute and control nodes.

  • No labels