This page is a work-in-progress and details getting the ONAP Demo (or pieces of it) running on a bare metal OPNFV installation (OpenStack Newton) in an office.
ONAP resource consumption made it impossible to deploy the demo on an all-virtual, Newton Triple-O installation running on an Intel Intel(R) Xeon(R) CPU E5-2699 v4 @ 2.20GHz server with 22 cores and 128 GB RAM.
Hardware
- 1 Intel NUC 5i7RYH
- Intel Core i7-5557U processor
- 16 GB RAM
- 1 ethernet port
- 2 SuperMicro 5018D-FN4T 1U servers
- Xeon D-1541 8 Core processor
- 128 GB RAM
- IPMI port plus 4 ethernet ports
- 256 GB SSD
- 1 TB HDD
- 2 Netgear Routers (WNR2000v5, WNR3500U)
- 1 8-port switch
Configuration
The Netgear routers function as dumb gateways for Admin and Public networks.
OpenStack Installation
I am using the OPNFV Triple-O installer (Danube release). The NUC serves as the jumphost and the Super Micro servers act as compute and control nodes.