Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 39 Next »

Duration 90 minutes - https://zoom.us/j/661303200

@4pm CET/10am EST/7am PST/10pm China Time/7.30pm India Time

Agenda ItemsPresented ByTimeNotes/LinksJIRA Tasks

Dublin Release

RC2 Follow-up

Sign-Off?

30 mins

Milestone Status 

  • Projects: Project Status in Dublin Release
  • RC2 status
    • 100% green for RC2 checklists
    • a few pair-wise tests still in process (passing %: 89% SO; 78% Policy)
    • RC2 TSC Recommendations -  RC2 GO
  • Sign-Off status
    • 29 projects (excluding Doc) 
      • 9 out of 29 are completed
      • 7 out of 29 are reporting with issues
      • 13 out of 29 have no reports
    • Sign-Off TSC Recommendations -  GO or NO GO 
    • TODOs
      1. Continue rapid find/fix cycle
      2. Complete 7day stability tests
      3. Assess all requirements for testing completion and determine IN/OUT status for each
      4. Release notes, security docs, and other documentation
      5. Communicate our best guess schedule


Release Details

      JIRA Query - Remaining 531 Items

status != Closed AND status != Done AND project != "Sandbox Project" AND project != CI-Management AND project != "ONAP TSC" and fixVersion = "Dublin Release" ORDER BY key ASC, priority DESC, updated DESC

aaf/authz
aaf/cadi
aaf/luaplugin
aaf/sms
aaf/sshsm
aai/eis
aai/enricher
aai/gap
aai/tabular-data-service
aai/test-config
ccsdk/platform/blueprints
ccsdk/storage/esaas
dcaegen2/analytics/flink
dcaegen2/analytics/pnda
dcaegen2/analytics/tca-gen2
dcaegen2/platform/cdapbroker
dcaegen2/platform/servicechange-handler
doc/tools
externalapi/nbi
holmes/common
holmes/engine-management
holmes/rule-management
integration/benchmark
integration/devtool
integration/seccom
logging-analytics/pomba
modeling/genericparser
modeling/toscaparsers
msb/apigateway
msb/discovery
msb/java-sdk
msb/service-mesh
msb/swagger-sdk
multicloud/azure
multicloud/framework
multicloud/k8s
multicloud/openstack/vmware
multicloud/openstack/windriver
music/distributed-kv-store
music/mdbc
music/prom
oom
oom/offline-installer
oom/registrator
oparent
oparent/cia
optf/fgps
portal
portal/sdk
sdc/sdc-be-common
sdnc/adaptors
testsuite/properties
university
vnfsdk/dovetail-integration
vnfsdk/model

Any Infrastructure Improvement/PlanLinux Foundation5 mins

Global-jjb update - 11 of 29 projects complete!

  • Post-Dublin automation of info.yaml/LDAP (don't disrupt the release)

Dockerhub migration - proposed start 2019-07-22 

  • Will update at PTL call (post-DDF)

Contributor License Agreements (CLA)

  • Enforcement of CLAs will start on July 1. 
  • Information sent to the contacts from all companies that have contributed code to Dublin
  • Commits will be blocked if companies do not have a CLA in place

Any LF showstopper

Open


Completed

#76345: Please help release Usecase-UI repos for Dublin Release

#76359: Need help with the info.Yaml change


PTL Update - Integration10 minsIn ODL, for instance, during release time-frame a few folks are granted “Supercommitter” rights, empowering them with merge rights on all repos. That way, when version number changes, or bug fix validated but no one to merge, etc., these set of people can take care of merging the needed patches and getting the release forward. Given our current structure in ONAP, where the integration team as to “vouch” for the state of ONAP before its release, it could make sense having Integration’s committer given such right.Carried forward from May 30
PTL Update - Portal5 minsRequest for a TSC Confirmation vote on Portal Committer Promotion Requests for Lorraine Welch
Subcommittee Update - CVC15 mins

Alignment to El Alto

Carried forward from May 30
Frankfurt Release10 min

Frankfurt Activity's plan proposal from M0 to M1

ONAP_Frankfurt_M0_M1_Proposal_V1.xlsx

Carried forward from May 30

TSC-129 - Getting issue details... STATUS

TCC Update



TSC Activities and Deadlines
Congratulations to Alla Goldner being elected as our ONAP Strategic Planning Committee (SPC) representative
Incoming ONAP Events5 mins

Any remaining open question?

  • ONAP Joint SubC Meetings Europe (September, Belgium) - Vote in progress before or after ONS Europe https://lists.onap.org/g/onap-tsc/message/5062
  • Fall DDF dates have been approved by the TSC:  Nov 19 - 22. The LF will begin working on a location. Companies with facilities in geo-politically neutral countries that are interested in hosting should contact Kenny Paul



Zoom Chat Log 



Zoom Attendance Log  

TSC Members Attendance based on Zoom Chat Log: 83%

AMDOCS1Alla Goldner
AT&T1Catherine Lefevre
Bell Canada1Alexis de Talhouët
China Mobile
Lingli Deng
China Telecom
Yan Chen
DT1Andreas Geissler
Ericsson1Ciaran Johnston, proxy for Stephen Terrill
Huawei1Adrian O'Sullivan, proxy for Chaker Al-Hakim
IBM1
Intel1Ypan Deng, proxy for Srini Addepalli 
Nokia1Timo Perala
Orange1Eric Debeau
Reliance Jio1Achilles de Villa, proxy for Ning So
Tech Mahindra1Milind Jalwadi 
Turk Telecom
Murat Tupcu
Verizon1Viswa Kumar Skand Priya
Vodafone1Davide Cherubini, proxy for Susana Sabater
WindRiver1Bin Yang



TSC Decisions  

2019 TSC Decisions



Action Items:

  •  Former user (Deleted) Rerun tool and discard readonly repos from branch list
  •  Former user (Deleted) to put forward an email  waiver vote for MUSIC
  • cl664y@att.com will compile the information on which companies block SSH to gerrit
  •  Collect feedback about Frankfurt Activity's plan proposal from M0 to M1 (TSC-129)
  • Adolfo Perez-Duran meet with SECCOM on a recommended version and work with PTLs
  • El Alto M3 checklist improvements for the security questions. Paweł Pawlak
  • (SECCOM): Review Vulnerabilities that require significant rework, architecture change as "TSC MUST Have" candidates for El Alto
  • Brian, Jess, Paul) to create a timeline considering our ONAP release roadmap including steps required for the multi-arch pipeline



  • No labels