Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Duration 90 minutes - https://zoom.us/j/661303200

...

Agenda ItemsPresented ByTimeNotes/LinksJIRA Tasks

Dublin Release

RC2 Follow-up

Sign-Off?

40 mins

Milestone Status 

  • Projects: Project Status in Dublin Release
  • RC2 status
    • 100% green for RC2 checklists
    • a few pair-wise tests still in process (passing %: 89% SO; 78% Policy)
    • RC2 TSC Recommendations -  RC2 GO - Approved by TSC - Congrats Team !
  • Sign-Off status
    • 29 projects (excluding Doc) 
      • 9 out of 29 are completed
      • 7 out of 29 are reporting with issues
      • 13 out of 29 have no reports
    • Sign-Off TSC Recommendations -  NO GO 
    • TODOs
      1. Continue rapid find/fix cycle
      2. Complete 7day stability tests
      3. Assess all requirements for testing completion and determine IN/OUT status for each
      4. Release notes, security docs, and other documentation
      5. Communicate our best guess schedule

Release Details

  • Latest "Release" Images?
  • Security Feedback - Vulnerability Tables, CII Bagding, Release Note, OSJI, etc. - 26 CVE issued, pushing updates of release notes - please merge ASAP
  • Integration Blockers: Dublin Release Integration Test Blocking Issues
  • Remaining Highest/High Defects: Defect Status for Dublin
  • Integration Tests Status: Dublin Release Integration Testing Status
    • 34 use cases/functional/non-functional requirements require E2E testing.
      • 21 out of 34 are completed (including N/A)
      • 4 out of 34 are at >=80% test completion
      • 9 out of 34 <80% test completion
    • Review all RED status (evaluate for removal from release)
      • #3 – 60% vCPE with TOSCA - drop from release - Candidate to be descoped (Ypan to confirm by 6/7 EOD)
      • #8 - 68% PNF Pre-onboarding - probably completed (Ben to confirm by 6/7 EOD)
      • #10 80% Scale Out - Require 2 days and integration with CDS (Scott to provide feedback on PTL call 6/10)
      • #11 74% CCVPN - Lab issues - scope change (Seshu to provide an update of the content to the LF Mkt Team + Readthedoc)
      • #18 60% & 20% BBS -proposition to phase it - PH1 Completed. PH2 Blocked by issues in SO & SDNC.(David to provide PH2 feedback on PTL call 6/10)
      • #23 50% Consistent ID of a cloud Region - SO issue (Bin to provide  feedback on PTL call 6/10)
      • #25, #33 - no update
      • #30, 31 - Security & Magnus to follow-up
      • #34 - Ypan to follow-up
  • Documentation Tickets: Documentation Status for Dublin
  • Dublin release branch NOT created – Long list to the right.... except Documentation since 5/15 (so cherry-pick)
  • Review Marketing Messages - https://lists.onap.org/g/onap-discuss/message/17065
  • Please update JIRA bugs, tasks, user stories, etc, but do not close tickets when the work is not done

      JIRA Query - Remaining 526 Items

status != Closed AND status != Done AND project != "Sandbox Project" AND project != CI-Management AND project != "ONAP TSC" and fixVersion = "Dublin Release" ORDER BY key ASC, priority DESC, updated DESC

aaf/authz
aaf/cadi
aaf/luaplugin
aaf/sms
aaf/sshsm
aai/eis
aai/enricher
aai/gap
aai/tabular-data-service
aai/test-config
ccsdk/platform/blueprints
ccsdk/storage/esaas
dcaegen2/analytics/flink
dcaegen2/analytics/pnda
dcaegen2/analytics/tca-gen2
dcaegen2/platform/cdapbroker
dcaegen2/platform/servicechange-handler
doc/tools
externalapi/nbi
holmes/common
holmes/engine-management
holmes/rule-management
integration/benchmark
integration/devtool
integration/seccom
logging-analytics/pomba
modeling/genericparser
modeling/toscaparsers
msb/apigateway
msb/discovery
msb/java-sdk
msb/service-mesh
msb/swagger-sdk
multicloud/azure
multicloud/framework
multicloud/k8s
multicloud/openstack/vmware
multicloud/openstack/windriver
music/distributed-kv-store
music/mdbc
music/prom
oom
oom/offline-installer
oom/registrator
oparent
oparent/cia
optf/fgps
portal
portal/sdk
sdc/sdc-be-common
sdnc/adaptors
testsuite/properties
university
vnfsdk/dovetail-integration
vnfsdk/model

Any Infrastructure Improvement/PlanLinux Foundation5 mins

Global-jjb update - 11 of 29 projects complete!

  • Post-Dublin automation of info.yaml/LDAP (don't disrupt the release)

Dockerhub migration - proposed start 2019-07-22 

  • Will update at PTL call (post-DDF)

Contributor License Agreements (CLA)

  • Enforcement of CLAs will start on July 1. 
  • Information sent to the contacts from all companies that have contributed code to Dublin
  • Commits will be blocked if companies do not have a CLA in place

Any LF showstopper

Completed

#76345: Please help release Usecase-UI repos for Dublin Release

#76359: Need help with the info.Yaml change


PTL Update - Integration10 mins

In ODL, for instance, during release time-frame a few folks are granted “Supercommitter” rights, empowering them with merge rights on all repos. That way, when version number changes, or bug fix validated but no one to merge, etc., these set of people can take care of merging the needed patches and getting the release forward. Given our current structure in ONAP, where the integration team as to “vouch” for the state of ONAP before its release, it could make sense having Integration’s committer given such right.

Suggestion: Integration Committers - 1 in APAC, 1 in EMEA & 1 in NAR to cover all the time-zones

Scope: Code and Documentation

Successful Story with OOM

Alexis/Brian will prepare a detailed proposition to be reviewed by TSC

Carried forward from May 30
PTL Update - Portal5 mins

Congratulations Lorraine Welch !

Portal Committer Promotion Requests for Lorraine Welch


Subcommittee Update - CVC30 mins

Alignment to El Alto

View file
nameVNF_Validation_MVP_for_ONAP_TSC_May-30-2019.pdf
height150

Carried forward from May 30
Frankfurt Release5 mins

Frankfurt Activity's plan proposal from M0 to M1

ONAP_Frankfurt_M0_M1_Proposal_V1.xlsx

Carried forward from May 30

Jira Legacy
serverSystem Jira
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176
keyTSC-129

TSC Activities and Deadlines
Congratulations to Alla Goldner being elected as our ONAP Strategic Planning Committee (SPC) representative
Incoming ONAP Events5 mins

Any remaining open question?

  • ONAP Joint SubC Meetings Europe (September, Belgium) - Vote in progress before or after ONS Europe https://lists.onap.org/g/onap-tsc/message/5062
  • Fall DDF dates have been approved by the TSC:  Nov 19 - 22. The LF will begin working on a location. Companies with facilities in geo-politically neutral countries that are interested in hosting should contact Kenny Paul


...

AMDOCS1Alla Goldner
AT&T1Catherine Lefevre
Bell Canada1Alexis de Talhouët
China Mobile1Lingli Deng
China Telecom
Yan Chen
DT1Andreas Geissler
Ericsson1Ciaran Johnston, proxy for Stephen Terrill
Huawei1Adrian O'Sullivan, proxy for Chaker Al-Hakim
IBM1
Intel1Ypan Deng, proxy for Srini Addepalli 
Nokia1Timo Perala
Orange1Eric Debeau
Reliance Jio1Achilles de Villa, proxy for Ning So
Tech Mahindra1Milind Jalwadi 
Turk Telecom
Murat Tupcu
Verizon1Viswa Kumar Skand Priya
Vodafone1Davide Cherubini, proxy for Susana Sabater
WindRiver1Bin Yang


...

TSC Decisions  

2019 TSC Decisions


...

Action Items:

  •   Yipan Deng  to follow up on OPTFRA-512. Due  
  •    Yipan Deng to follow up on vCPW w/ TOSCA. Due  
  •    Benjamin Cheung  to follow up on 5G PFN pre-onboarding. Due  
  •   Scott Blandford to follow up on Scaleout / CDS at PTL meeting. Due  
  •   Seshu Kumar Mudiganti to follow up on CCVPN. Due  
  •    David Perez Caparros to follow up on BBS @ ptl meeting. Due  
  •    Bin Yang to follow up on consistent ID cloud region at PTL meeting. Due  
  •    Ciaran Johnston to follow up on SOL004. Due  
  •   Yipan Deng  to follow up on HPA sec. Due   
  •     Alexis de Talhouët FREEMAN, BRIAN D to put together a formal proposal for supercommitters at next week's TSC meeting. Due  
  •   Former user (Deleted) Rerun tool and discard readonly repos from branch list
  •   Former user (Deleted) to put forward an email  waiver vote for MUSIC
  •   cl664y@att.com will compile the information on which companies block SSH to gerrit
  •    Collect feedback about Frankfurt Activity's plan proposal from M0 to M1 (TSC-129)
  •   Adolfo Perez-Duran meet with SECCOM on a recommended version and work with PTLs
  •  El Alto M3 checklist improvements for the security questions. Paweł Pawlak
  •  (SECCOM): Review Vulnerabilities that require significant rework, architecture change as "TSC MUST Have" candidates for El Alto
  •  Brian, Jess, Paul) to create a timeline considering our ONAP release roadmap including steps required for the multi-arch pipeline

...