- APPC Meeting Minutes - (Jan'19 - )1/2/19 - APPC Project Weekly Minute
- 1/9/19 - APPC Project Weekly Minute
- 1/16/19 - APPC Project Weekly Minute
1/2/19 - APPC Project Weekly Minute
Participants:Takamune Cho, Patrick Brady, Aaron Hay,Ramya Balaji, Joss Armstrong, Surendra Reddy, Fari Behi
Agenda
- Casablanca Mtn Release status
- Dublin release plan
Action item
- Casablanca Mtn Release: 1/10/2019 Docker release, 1/24/2019 release note, 1/31/2019 Sign-off
Issues/Bugs fix: CCSDK new image, DMaap issue Platform Maturity: - Dublin M1 Planning: (draft) 1/17/2019 ( Dublin Release Requirements )
- ODL upgrade: Fluorine SR2
- Performance:
- unzip feature.zip during building docker.
- Remove un-used bundles from CCSDK’s odlsli
- Reduce the flow between bundles – R5 or later
- Stability: Configuration Enhancement https://
wiki- onap
- org
- net/wiki/display/DW/APPC+Configuration+Enhancement
- Manageability: logging Enhancement https://
wiki- onap
- org
- 28378955
- 16278511
- Scalability: Clustering env with downstream: netconf, ansible,
- Resiliency:
- CII Badge Silver level: 80% test coverage??
- OOM: move to variable for database’s user/password
- CSIT OOM
ScaleInNew ConfigScaleIn LCM actiondistributeTraffic support on VM level
- Change Management (CM) Controller Design Studio (CDS)
Runtime: manage a switcher in APPC to know the coming request is LCM action or blueprint TOSCA – R5- Design time: CDT/CDS GUI integration
...
- ODL upgrade:
...
Please Join RocketChat if you want to collaborate online. You need to be added to the group chat, but you need to create a username in RocketChat first,otherwise we can't add you. http://onap-integration.eastus.cloudapp.azure.com:3000/group/onap-appc
...
- Fluorine SR2
- Platform Maturity:
ScaleIn- Change Management (CM)
- Controller Design Studio (CDS)
View file | ||||
---|---|---|---|---|
|
1/
...
9/19 - APPC Project Weekly Minute
Participants:Takamune Cho, Patrick Brady, Aaron Hay,Ramya Balaji ,
...
Joss Armstrong , Lathishbabu Ganesan
Agenda
- Casablanca Mtn Release status
- Dublin release plan
Action item
- Casablanca Mtn Release: CCSDK new image, DMaap issue
- Traffic Migration Demo by Orange team (they are in Paris, waiting their response)
- Dublin Planning: (draft) ODL upgrade: Fluorine SR2 (Patrick
- ) S3P https://wiki.onap.org/pages/viewpage.action?pageId=16003367, https://wiki.onap.org/display/DW/Dublin+Release+Platform+Maturity
- Performance: Level 2
- Level 1: baseline performance criteria identified and measured (such as response time, transaction/message rate, latency, footprint, etc. to be defined on per component)
- Level 2: performance improvement plan created
- unzip feature.zip during building docker. - (Patrick)
- Remove un-used bundles from CCSDK’s odlsli - (Taka)
- Stability: Level 2
- Level 2: 72 hour platform-level soak test (random test transactions with 80% code coverage; steady load)
- Configuration Enhancement https://
wiki- onap
- org
- Resiliency: Level 2
- Level 2: support automated failure detection & rerouting
- within a single geographic site
- stateless components: establish baseline measure of failed requests for a component failure within a site
- stateful components: establish baseline of data loss for a component failure within a site
- OOM: move to variable for database’s user/password - (Aaron)
- CSIT OOM (Integration)
- Level 2: support automated failure detection & rerouting
- Security:
- Absolute Minimum expectation:
- CII badging passing level
- Continuously retaining no critical or high known vulnerabilities > 60 days old
- All communication shall be able to be encrypted and have common role-based access control and authorization.
- Desired expectation is full CII badging silver level, if not 75% towards that.
- Absolute Minimum expectation:
- Scalability: Level 1
- Level 1: supports single site horizontal scale out and scale in, independent of other component
- APPC does not support dynamic cluster configuration in k8s only support static cluster configuration
- Clustering env with downstream: netconf(Aaron), ansible (Asking Orange team), -
- Manageability: Level 2
- Level 2:
- A component can be independently upgraded without impacting operation interacting components
- Component configuration to be externalized in a common fashion across ONAP projects
- All application logging to adhere to ONAP Application Logging Specification v1.2
- Implement guidelines for a minimal container footprint - See this presentation and follow the Container Image Minimization Guidelines - Taka will
- Level 2:
check- Resiliency: Level 2
- review
- Usability: Level 2
- Level 2:
- API Documentation
- All new API’s must adhere to the ONAP API Common Versioning Strategy and Documentation Guidelines
- All existing APIs must be documented in Swagger 2.0
- API Documentation
- Level 2:
- ODL upgrade: Fluorine SR2 (Patrick)
- S3P https://lf-onap.atlassian.net/wiki/pages/viewpage.action?pageId=16252737, https://lf-onap.atlassian.net/wiki/display/DW/Dublin+Release+Platform+Maturity
Brown→ Jason's goal
- Use Case: https://lf-onap.atlassian.net/wiki/display/DW/Dublin+Release+Requirements
- Design time: CDT/CDS GUI integration (TechM)
- E2E automation / closed loop
- Change Management (CM) (Orange)
- Controller Design Studio
NO Recording for this meeting, since ONAP 4 room has been occupied by F2F event in Paris.
1/16/19 - APPC Project Weekly Minute
Participants:Takamune Cho, Patrick Brady,Ramya Balaji, Joss Armstrong, Fari Behi, J Hartley, Lathishbabu Ganesan
Agenda
- Casablanca Mtn Release status
- Dublin release plan
Action item
- Casablanca Mtn Release: 1.4.4 Released
- Traffic Migration Demo by Orange team
- Dublin Planning: (draft)
- Performance:
- Level 1: baseline performance criteria identified and measured (such as response time, transaction/message rate, latency, footprint, etc. to be defined on per component) – Joss APPC-1311
- Level 2: performance improvement plan created - Joss APPC-1311
- APPC Pre-install appc features during docker build. – APPC- 1322 Patrick
- Remove un-used bundles from CCSDK’s odlsli – CCSDK- 944 Taka
- Stability:
- Configuration Enhancement https://lf-onap.atlassian.net/wiki/display/DW/APPC+Configuration+Enhancement - Stretch
- 80% test coverage??
- Resiliency:
- ODL upgrade: Fluorine SR2 – APPC-1277
- S3P https://lf-onap.atlassian.net/wiki/pages/viewpage.action?pageId=16252737, https://lf-onap.org.atlassian.net/wiki/display/DW/Dublin+Release+Platform+Maturity
- Level 2: support automated failure detection & rerouting
- within a single geographic site
- stateless components: establish baseline measure of failed requests for a component failure within a site
- stateful components: establish baseline of data loss for a component failure within a site
- Level 2:
- A component can be independently upgraded without impacting operation interacting components
- Component configuration to be externalized in a common fashion across ONAP projects
- All application logging to adhere to ONAP Application Logging Specification v1.2
- Implement guidelines for a minimal container footprint – Taka (low priority by TSC)
- Level 2:
- API Documentation
- All new API’s must adhere to the ONAP API Common Versioning Strategy and Documentation Guidelines - Taka
- All existing APIs must be documented in Swagger 2.0
- API Documentation
- OOM: move to variable for database’s user/password – Aaron APPC-?
- CSIT OOM – by INT team
- Security:
- CII badging passing level
- Continuously retaining no critical or high known vulnerabilities > 60 days old
- All communication shall be able to be encrypted and have common role-based access control and authorization.
- Absolute Minimum expectation:
- Desired expectation is full CII badging silver level, if not 75% towards that.
- Stretch goal: Project Level 2
- Scalability:
- Level 1: supports single site horizontal scale out and scale in, independent of other components.
- Clustering env with downstream: netconf,APPC-1258 (Arron) ansible (Orange team?).
- Manageability:
- logging Enhancement https://lf-onap.atlassian.net/wiki/pages/viewpage.action?pageId=16278511 ( low priority by TSC)
- Usability:
- Use Case: https://lf-onap.atlassian.net/wiki/display/DW/Dublin+Release+Requirements
- Design time: CDT/CDS GUI integration
- Risk Page: https://lf-onap.atlassian.net/wiki/display/DW/Dublin+Risks
- E2E automation / closed loop
- Change Management (CM)
- Controller Design Studio (CDS)
View file | ||||
---|---|---|---|---|
|
1/23/19 - APPC Project Weekly Minute
Participants:Takamune Cho, Patrick Brady, Joss Armstrong , Aaron Hay , Suresh Reddy
Agenda
- Casablanca Mtn Release status
- Dublin release plan
Action item
- Casablanca Mtn Release: 1.4.4 Released
- Traffic Migration Demo by Orange team - Taka
- Dublin:
- ODL upgrade: Fluorine SR2 – APPC-1277
- Level 2: performance improvement plan created - Joss APPC-1311
- APPC Pre-install appc features during docker build. – APPC- 1322 Patrick (DONE)
- Netconf non-clustering vs clustering.- Patrick/Aaron - APPC-1242 to Gary Wu to test
- MD-Sal clustering(must have), jolokia (optional: performance measurement), netconf-clustering(must have). – three clustering bundles from ODL.
- OOM – move k8s env to project level : Mike will be presenting on PTL mtg next week.(Feb 4)
- Remove un-used bundles from CCSDK’s odlsli – CCSDK- 944 Taka
- 80% test coverage (APPC: 50% committed)
- OOM: move to variable for database’s user/password – Aaron APPC-1340
- CSIT OOM – by INT team
- Clustering env with downstream: netconf,APPC-1258 (Arron) ansible (Orange team).
- Use Case: https://lf-onap.atlassian.net/wiki/display/DW/Dublin+Release+Requirements
- Design time: CDT/CDS GUI integration
- Risk Page: https://lf-onap.atlassian.net/wiki/display/DW/Dublin+Risks
- E2E automation / closed loop
- Change Management (CM)
- Controller Design Studio (CDS)
View file | ||||
---|---|---|---|---|
|
1/30/19 - APPC Project Weekly Minute
Participants:Takamune Cho, Patrick Brady, Randa Maher, Joss Armstrong, Lathishbabu Ganesan
Agenda
- Casablanca Mtn Release status
- Dublin release
Action item
- Casablanca Mtn Release: 1.4.4 Released
- Traffic Migration Demo by Orange team - Taka
- Dublin:
- MD-Sal clustering(must have), jolokia (optional: performance measurement), netconf-clustering(must have). – three clustering bundles from ODL.
- ODL upgrade: Fluorine SR2 – APPC-1277
- Level 2: performance improvement plan created - Joss APPC-1311, Taka will check APPC tenant for Dublin env.
- APPC Pre-install appc features during docker build. – APPC- 1322 Patrick (DONE)
- Netconf non-clustering vs clustering.- Patrick/Aaron - APPC-1242 to Gary Wu to test
- OOM – move k8s env to project level : AAI is chosen for the first project – Taka is going to join OOM mtg and report to here.
- Remove un-used bundles from CCSDK’s odlsli – CCSDK- 944 Taka (under progress)
- 80% test coverage (APPC: 50% committed)
- OOM: move to variable for database’s user/password – APPC-1340 (Taka/Aaron)
- CSIT OOM – by INT team (FYI)
- Clustering env with downstream: netconf,APPC-1258 (Arron) ansible (Orange team).
- Use Case: https://lf-onap.atlassian.net/wiki/display/DW/Dublin+Release+Requirements
- Design time: CDT/CDS GUI integration
(TechM)
Misc:
Please Join RocketChat if you want to collaborate online. You need to be added to the group chat, but you need to create a username in RocketChat first,otherwise we can't add you. http://onap-integration.eastus.cloudapp.azure.com:3000/group/onap-appc
INT: http://onap-integration.eastus.cloudapp.azure.com:3000/group/onap-integration
...
- Risk Page: https://lf-onap.atlassian.net/wiki/display/DW/Dublin+Risks
- E2E automation / closed loop
- Change Management (CM)
- Controller Design Studio (CDS)
View file name zoom_0.mp4 height 250
name | zoom_0.mp4 |
---|---|
height | 250 |
2/6/19 - APPC Project Weekly Minute
Participants:
Agenda
- APPC VM/VNFC Level HealthCheck LCM API Enhancement
Orange has a request to allow APPC LCM API to support VNFC and above.
2/13/2019 - APPC Project Weekly Minute
Participants:Takamune Cho, Patrick Brady, , Joss Armstrong, Lathishbabu Ganesan, Shubhada Ramkrishna Vaze
Agenda
- Casablanca Mtn Release - Done
- Dublin release
Action item
- Casablanca Mtn Release: 1.4.4 Released - Done
- Traffic Migration Demo by Orange team - Taka
- Dublin:
- MD-Sal clustering(must have), jolokia (optional: performance measurement), netconf-clustering(must have). – three clustering bundles from ODL.
- ODL upgrade: Fluorine SR2 – APPC-1277
- Level 2: performance improvement plan created - Joss APPC-1311, Taka will check APPC tenant for Dublin env.
- Netconf non-clustering vs clustering.- Patrick/Aaron - APPC-1242 to Gary Wu to test
- OOM – move k8s env to project level : AAI is chosen for the first project – Taka is going to join OOM mtg and report to here.
- Remove un-used bundles from CCSDK’s odlsli – CCSDK- 944 Taka (under progress)
- 80% test coverage (APPC: 50% committed)
- OOM: move to variable for database’s user/password – APPC-1340 (Taka/Aaron) – sprint 8
- CSIT OOM – by INT team (FYI)
- Clustering env with downstream: netconf,APPC-1258 (Arron) ansible (Orange team).
- VM/VNFC generic healthcheck LCM – payload format needs to formalized
- Multiple ansible server support
- Move Nexus3 to dockerHub
- Checklist template updated by Catherine
- Use Case: https://lf-onap.atlassian.net/wiki/display/DW/Dublin+Release+Requirements
- Design time: CDT/CDS GUI integration
- Risk Page: https://lf-onap.atlassian.net/wiki/display/DW/Dublin+Risks
- E2E automation - CDS
- Change Management (CM)
- Controller Design Studio (CDS)
View file | ||||
---|---|---|---|---|
|
2/20/2019 - APPC Project Weekly Minute
Participants:Takamune Cho, Patrick Brady, , Joss Armstrong, Lathishbabu Ganesan, Shubhada Ramkrishna Vaze , FariBorz Behi
Agenda
- Dublin release
Action item
- Traffic Migration Demo by Orange team - Taka
- Dublin:
- MD-Sal clustering(must have), jolokia (optional: performance measurement), netconf-clustering(must have). – three clustering bundles from ODL.
- https://r.lfnetworking.org/lfn-zoom/ONAP/TSC-Meetings/TSC-2019/tsc-2019-02-14.mp4 starting from 1:15:00, the new structure Helm Chart. if you have time, you could watch the video.
- https://lf-onap.atlassian.net/wiki/display/DW/ptl+meeting+recordings 2019-02-19 starting from 0:24:00, new CI/CD
- ODL upgrade: Fluorine SR2 – APPC-1277
- Level 2: performance improvement plan created - Joss APPC-1311, Taka will check APPC tenant for Dublin env.
- Netconf non-clustering vs clustering.- Patrick/Aaron - APPC-1242 to Gary Wu to test
- OOM – move k8s env to project level : AAI is chosen for the first project – Taka is going to join OOM mtg and report to here.
- Remove un-used bundles from CCSDK’s odlsli – CCSDK- 944 Taka (talked with Dan, Dan will think about the core bundles in odlsli )
- 80% test coverage (APPC: 50% committed)
- OOM: move to variable for database’s user/password – APPC-1340 (Taka) – sprint 8
- CSIT OOM – in Dublin
- Clustering env with downstream: netconf,APPC-1258 (Taka/Patrick) ansible (Orange team).
- VM/VNFC generic healthcheck LCM – payload format needs to formalized – taka
- Multiple ansible server support
- Move Nexus3 to dockerHub
- Use Case: https://lf-onap.atlassian.net/wiki/display/DW/Dublin+Release+Requirements
- Design time: CDT/CDS GUI integration
- Risk Page: https://lf-onap.atlassian.net/wiki/display/DW/Dublin+Risks
- E2E automation - CDS
- Change Management (CM)
- Controller Design Studio (CDS)
Recording:
View file name zoom_0.mp4 height 250
2/27/2019 - APPC Project Weekly Minute
Participants:Takamune Cho, Patrick Brady, , Joss Armstrong, Lathishbabu Ganesan, Michael Zinnikas, Randa Maher
Agenda
- Dublin release
- Dublin env in k8s
Action item
- Traffic Migration Demo by Orange team - Taka
- Dublin:
- MD-Sal clustering(must have), jolokia (optional: performance measurement), netconf-clustering(must have). – three clustering bundles from ODL.
- ODL upgrade: Fluorine SR1 – APPC-1277
- Level 2: performance improvement plan created - Joss APPC-1311, Taka will check APPC tenant for Dublin env.
- Netconf non-clustering vs clustering.- Patrick/Aaron - APPC-1242 to Gary Wu to test
- OOM – move k8s env to project level : AAI is chosen for the first project – Taka is going to join OOM mtg and report to here.
- Remove un-used bundles from CCSDK’s odlsli – CCSDK- 944 Taka (talked with Dan, Dan will think about the core bundles in odlsli )
- 80% test coverage (APPC: 50% committed)
- OOM: move to variable for database’s user/password – APPC-1340 (Taka) – sprint 8
- CSIT OOM – in Dublin
- Clustering env with downstream: netconf,APPC-1258 (Taka/Patrick) ansible (Orange team).
- VM/VNFC generic healthcheck LCM – payload format needs to formalized – taka follow up with Scott.
- Multiple ansible server support
- Move Nexus3 to dockerHub
- footprint
- Use Case: https://lf-onap.atlassian.net/wiki/display/DW/Dublin+Release+Requirements
- Design time: CDT/CDS GUI integration
- Risk Page: https://lf-onap.atlassian.net/wiki/display/DW/Dublin+Risks
- E2E automation - CDS
- Change Management (CM)
- Controller Design Studio (CDS)
Recording:
View file name zoom_0.mp4 height 250
3/6/2019 - APPC Project Weekly Minute
Participants:Takamune Cho, Patrick Brady, Joss Armstrong
Agenda
- Dublin release
- Update from PTL / TSC meeting
- Daylight Saving Time starts 3/10/2019
Action item
- TSC/PTL meeting updates:
- https://jira.onap.org/browse/CIMAN-239 dockerhub migration will be done by M4 Dublin)
- https://jira.onap.org/browse/CIMAN-234 global jjb nexus server
- https://gitlab.com/Orange-OpenSource/lfn/onap/xtesting-onap , See the comment on https://gerrit.onap.org/r/#/c/79573/ CI/CD enhancement, test will be trigger per gerrit. Webcast starting at the 50th minute https://r.lfnetworking.org/lfn-zoom/ONAP/TSC-Meetings/TSC-2019/tsc-2019-02-28.mp4
- Traffic Migration Demo by Orange team - https://docs.onap.org/en/casablanca/submodules/integration.git/docs/docs_vFWDT.html#vfw-traffic-distribution-use-case
- Dublin:
- MD-Sal clustering(must have), jolokia (optional: performance measurement), netconf-clustering(must have). – three clustering bundles from ODL.
- M3 – 3/14
- Level 2: performance improvement plan created - Joss APPC-1311, Taka will check APPC tenant for Dublin env.
- Netconf non-clustering vs clustering.- Patrick - APPC-1242 to Gary Wu to test
- OOM – move k8s env to project level : AAI is chosen for the first project – Taka is going to join OOM mtg and report to here.
- Remove un-used bundles from CCSDK’s odlsli – CCSDK- 944 Taka (talked with Dan, Dan will think about the core bundles in odlsli )
- 83.1% test coverage (APPC: 50% committed)
- OOM: move to variable for database’s user/password – APPC-1340 (Taka) – sprint 8
- CSIT OOM – in Dublin
- Clustering env with downstream: netconf,APPC-1258 (Taka/Patrick) ansible (Orange team).
- VM/VNFC generic healthcheck LCM – payload format needs to formalized – taka follow up with Scott.
- Multiple ansible server support
- Footprint – MariaDB left
- https/tls support for netconf
- Use Case: https://lf-onap.atlassian.net/wiki/display/DW/Dublin+Release+Requirements
- Design time: CDT/CDS GUI integration
- Risk Page: https://lf-onap.atlassian.net/wiki/display/DW/Dublin+Risks
- E2E automation - CDS
- Change Management (CM)
- Controller Design Studio (CDS)
View file name zoom_0.mp4 height 250
3/13/2019 - APPC Project Weekly Minute
Participants:Takamune Cho, Patrick Brady, Joss Armstrong, J Hartley
Agenda
- Dublin release
- Update from PTL / TSC meeting
- APPC tenant reassignment
Action item
- TSC/PTL meeting updates:
- https://jira.onap.org/browse/OOM-1240 Transfer Ownership of Helm Charts to the Project teams
- https://jira.onap.org/browse/CIMAN-239 dockerhub migration will be done by M4 Dublin)
- https://jira.onap.org/browse/CIMAN-234 global jjb nexus server
- https://gitlab.com/Orange-OpenSource/lfn/onap/xtesting-onap , See the comment on https://gerrit.onap.org/r/#/c/79573/ CI/CD enhancement, test will be trigger per gerrit. Webcast starting at the 50th minute https://r.lfnetworking.org/lfn-zoom/ONAP/TSC-Meetings/TSC-2019/tsc-2019-02-28.mp4
- Dublin:
- MD-Sal clustering(must have), jolokia (optional: performance measurement), netconf-clustering(must have). – three clustering bundles from ODL.
- M3 – 3/14
- Level 2: performance improvement plan created - Joss APPC-1311, Taka will check APPC tenant for Dublin env.
- Netconf non-clustering vs clustering.- Patrick - APPC-1242 to Gary Wu to test
- OOM – move k8s env to project level : AAI is chosen for the first project – Taka is going to join OOM mtg and report to here.
- Remove un-used bundles from CCSDK’s odlsli – CCSDK- 944 Taka (talked with Dan, Dan will think about the core bundles in odlsli )
- 83.5% test coverage (APPC: 50% committed)
- OOM: move to variable for database’s user/password – APPC-1340 (Taka) – sprint 8
- Clustering env with downstream: netconf,APPC-1258 (Taka/Patrick) ansible (Orange team).
- VM/VNFC generic healthcheck LCM – payload format needs to formalized – taka follow up with Scott.
- Multiple ansible server support
- Footprint – MariaDB left
- https/tls support for netconf
- Use Case: https://lf-onap.atlassian.net/wiki/display/DW/Dublin+Release+Requirements
- Design time: CDT/CDS GUI integration
- Risk Page: https://lf-onap.atlassian.net/wiki/display/DW/Dublin+Risks
- E2E automation - CDS
- Change Management (CM)
- Controller Design Studio (CDS)
View file name zoom_0.mp4 height 250
3/27/2019 - APPC Project Weekly Minute
Participants:Takamune Cho, Patrick Brady, Joss Armstrong, Oskar Malm
Agenda
- Dublin R4 release
- Update from PTL / TSC meeting
- LCM API evolution for R5 – Oskar Malm -
Action item
- TSC/PTL meeting updates:
- Remove nexus-staging-maven-plugin from top of pom file
- M4 postponed one week – 4/11/2019. APPC code freeze is 4/4/2019
- https://jira.onap.org/browse/OOM-1240 Transfer Ownership of Helm Charts to the Project teams
- https://jira.onap.org/browse/CIMAN-239 dockerhub migration will be done by M4 Dublin)
- https://jira.onap.org/browse/CIMAN-234 global jjb nexus server
- https://gitlab.com/Orange-OpenSource/lfn/onap/xtesting-onap , CI/CD enhancement, test will be trigger per gerrit. Webcast starting at the 50th minute https://r.lfnetworking.org/lfn-zoom/ONAP/TSC-Meetings/TSC-2019/tsc-2019-02-28.mp4
- Please follow https://status.linuxfoundation.org/ for LFN infra status update.
- Dublin:
- ODL SR2 update
- Remove un-used bundles from CCSDK’s odlsli – CCSDK- 944 Taka (talked with Dan, Dan will think about the core bundles in odlsli )
- 83.6% test coverage (APPC: 50% committed)
- OOM: move to variable for database’s user/password – APPC-1340 (Taka) – sprint 8
- Clustering env with downstream: netconf,APPC-1258 (Taka/Patrick) ansible (Orange team).
- VM/VNFC generic healthcheck LCM – payload format needs to formalized – taka follow up with Scott.
- Multiple ansible server support
- Footprint – MariaDB left
- https/tls support for netconf
- Use Case: https://lf-onap.atlassian.net/wiki/display/DW/Dublin+Release+Requirements
- Design time: CDT/CDS GUI integration – TechM will submit code this week.
- Risk Page: https://lf-onap.atlassian.net/wiki/display/DW/Dublin+Risks
- E2E automation - CDS
- Change Management (CM)
- Controller Design Studio (CDS)
- ONAP Joint Subcommittees in San Jose (4/1-2) https://lf-onap.atlassian.net/wiki/display/DW/2019+ONAP+Joint+Subcommittees+Silicon+Valley
View file name zoom_0.mp4 height 250
4/3/2019 - APPC Project Weekly Minute
Participants:Takamune Cho, Patrick Brady, Joss Armstrong, Oskar Malm , Lathishbabu Ganesan
Agenda
- Dublin R4 release
- Update from ONAP – San Jose
- Call for idea/evolution/enhancement for El Alto
Action item
- TSC/PTL meeting updates:
- M4 postponed one week – 4/11/2019. APPC code freeze is 4/8/2019, branching Dublin, beween M4 and RC0,
- https://jira.onap.org/browse/OOM-1240 Transfer Ownership of Helm Charts to the Project teams
- https://jira.onap.org/browse/CIMAN-239 dockerhub migration will be done by M4 Dublin)
- https://jira.onap.org/browse/CIMAN-234 global jjb nexus server
- https://gitlab.com/Orange-OpenSource/lfn/onap/xtesting-onap , CI/CD enhancement, test will be trigger per gerrit. Webcast starting at the 50th minute https://r.lfnetworking.org/lfn-zoom/ONAP/TSC-Meetings/TSC-2019/tsc-2019-02-28.mp4
- Please follow https://status.linuxfoundation.org/ for LFN infra status update.
- Dublin:
- ODL SR2 update
- Remove un-used bundles from CCSDK’s odlsli – CCSDK- 944 Taka (talked with Dan, Dan will think about the core bundles in odlsli )
- 83.7% test coverage (APPC: 55% committed)
- OOM: move to variable for database’s user/password – APPC-1340 (Taka) – sprint 8
- Clustering env with downstream: netconf,APPC-1258 (Taka/Patrick) ansible (Orange team).
- VM/VNFC generic healthcheck LCM – payload format needs to formalized – taka follow up with Scott.
- Multiple ansible server support
- Footprint – MariaDB left
- https/tls support for netconf
- Use Case: https://lf-onap.atlassian.net/wiki/display/DW/Dublin+Release+Requirements
- Design time: CDT/CDS GUI integration – TechM will submit code this week.
- Risk Page: https://lf-onap.atlassian.net/wiki/display/DW/Dublin+Risks
- E2E automation - CDS
- Change Management (CM)
- Controller Design Studio (CDS)
- El Alto Planning
View file | ||||
---|---|---|---|---|
|
4/17/2019 - APPC Project Weekly Minute
Participants:Takamune Cho, Patrick Brady, Oskar Malm , Lukasz Rajewski
Agenda
- Dublin R4 release
- Draft evolution/enhancement for El Alto
Action item
- TSC/PTL meeting updates:
- New schedule for R5 and R6: https://wiki.onap.org/display/DW/TSC+2019-04-11?preview=/60886752/60891211/2019-04-09%20ONAP%20Cadence%20Release_V4.pptx
- https://jira.onap.org/browse/OOM-1240 Transfer Ownership of Helm Charts to the Project teams
- https://jira.onap.org/browse/CIMAN-239 dockerhub migration will be done by M4 Dublin)
- https://jira.onap.org/browse/CIMAN-234 global jjb nexus server
- https://gitlab.com/Orange-OpenSource/lfn/onap/xtesting-onap , CI/CD enhancement, test will be trigger per gerrit. Webcast starting at the 50th minute https://r.lfnetworking.org/lfn-zoom/ONAP/TSC-Meetings/TSC-2019/tsc-2019-02-28.mp4
- Please follow https://status.linuxfoundation.org/ for LFN infra status update.
- Dublin:
- Branch Dublin 4/18
- ODL SR2 update
- Pair wise testing: https://lf-onap.atlassian.net/wiki/display/DW/APPC+Pair+Wise+Testing+for+Dublin+Release
- Remove un-used bundles from CCSDK’s odlsli – CCSDK- 944 Taka (talked with Dan, Dan will think about the core bundles in odlsli )
- 83.7% test coverage (APPC: 55% committed)
- OOM: move to variable for database’s user/password – APPC-1340 (Taka) – sprint 8
- Clustering env with downstream: netconf,APPC-1258 (Taka/Patrick) ansible (Orange team).
- VM/VNFC generic healthcheck LCM – payload format needs to formalized – taka follow up with Scott.
- Multiple ansible server support
- Footprint – MariaDB left
- El Alto Planning: Taka presented the draft proposal for El Alto planning
View file | ||||
---|---|---|---|---|
|
4/24/2019 - APPC Project Weekly Minute
Agenda
- Dublin R4 release
- El Alto
Participants:Takamune Cho, Patrick Brady, Joss Armstrong Lathishbabu Ganesan
Action item
- TSC/PTL meeting updates:
- RC0 delayed to 5/2
- New schedule for R5 and R6: https://wiki.onap.org/display/DW/TSC+2019-04-11?preview=/60886752/60891211/2019-04-09%20ONAP%20Cadence%20Release_V4.pptx
- https://jira.onap.org/browse/OOM-1240 Transfer Ownership of Helm Charts to the Project teams
- https://jira.onap.org/browse/CIMAN-239 dockerhub migration will be done by M4 Dublin)
- https://jira.onap.org/browse/CIMAN-234 global jjb nexus server
- https://gitlab.com/Orange-OpenSource/lfn/onap/xtesting-onap , CI/CD enhancement, test will be trigger per gerrit. Webcast starting at the 50th minute https://r.lfnetworking.org/lfn-zoom/ONAP/TSC-Meetings/TSC-2019/tsc-2019-02-28.mp4
- Please follow https://status.linuxfoundation.org/ for LFN infra status update.
- Dublin:
- Branch Dublin 4/26
- ODL SR2 update
- Pair wise testing: https://lf-onap.atlassian.net/wiki/display/DW/APPC+Pair+Wise+Testing+for+Dublin+Release
- 83.7% test coverage (APPC: 55% committed)
- El Alto:
- ODL upgrade?
- Microservice
- OOM: move to variable for database’s user/password – APPC-1340 (Taka)
- Remove un-used bundles from CCSDK’s odlsli – CCSDK- 944 Taka (talked with Dan, Dan will think about the core bundles in odlsli )
- Etc..
- Planning:
- Backlog:
View file name zoom_0.mp4 height 250
5/1/2019 - APPC Project Weekly Minute
Agenda
- Dublin R4 release
- El Alto
- Frankfurt
Action item
- TSC/PTL meeting updates:
- RC0 delayed to 5/2
- New schedule for R5 and R6: https://wiki.onap.org/display/DW/TSC+2019-04-11?preview=/60886752/60891211/2019-04-09%20ONAP%20Cadence%20Release_V4.pptx
- https://lf-onap.atlassian.net/wiki/display/DW/Managing+Container+Image+Tags
- Transfer Ownership of Helm Charts to the Project teams: https://lf-onap.atlassian.net/wiki/display/DW/OOM+-+Development+workflow+after+code+transfer+to+tech+teams
- https://jira.onap.org/browse/CIMAN-239 dockerhub migration will be done by M4 Dublin)
- https://jira.onap.org/browse/CIMAN-234 global jjb nexus server
- https://gitlab.com/Orange-OpenSource/lfn/onap/xtesting-onap , CI/CD enhancement, test will be trigger per gerrit. Webcast starting at the 50th minute https://r.lfnetworking.org/lfn-zoom/ONAP/TSC-Meetings/TSC-2019/tsc-2019-02-28.mp4
- Please follow https://status.linuxfoundation.org/ for LFN infra status update.
- Dublin:
- JIRA ticket reviews
- Branch Dublin 4/26
- Pair wise testing: https://lf-onap.atlassian.net/wiki/display/DW/APPC+Pair+Wise+Testing+for+Dublin+Release
- 83.7% test coverage (APPC: 55% committed)
- El Alto:
- ODL SR2 update
- Backlog:
- OOM: move to variable for database’s user/password – APPC-1340 (Taka)
- Remove un-used bundles from CCSDK’s odlsli – CCSDK- 944 Taka (talked with Dan, Dan will think about the core bundles in odlsli )
- Etc..
- Planning:
- Frankfurt:
- Microservice
- Planning:
5/15/2019 - APPC Project Weekly Minute
Agenda
- Dublin R4 release
- El Alto R5 release
- Frankfurt R6 release
Action item
- TSC/PTL meeting updates:
- RC0 delayed to 5/2
- New schedule for R5 and R6: https://wiki.onap.org/display/DW/TSC+2019-04-11?preview=/60886752/60891211/2019-04-09%20ONAP%20Cadence%20Release_V4.pptx
- https://lf-onap.atlassian.net/wiki/display/DW/Managing+Container+Image+Tags
- Transfer Ownership of Helm Charts to the Project teams: https://lf-onap.atlassian.net/wiki/display/DW/OOM+-+Development+workflow+after+code+transfer+to+tech+teams
- https://jira.onap.org/browse/CIMAN-239 dockerhub migration will be done by M4 Dublin)
- https://jira.onap.org/browse/CIMAN-234 global jjb nexus server
- https://gitlab.com/Orange-OpenSource/lfn/onap/xtesting-onap , CI/CD enhancement, test will be trigger per gerrit. Webcast starting at the 50th minute https://r.lfnetworking.org/lfn-zoom/ONAP/TSC-Meetings/TSC-2019/tsc-2019-02-28.mp4
- Please follow https://status.linuxfoundation.org/ for LFN infra status update.
- Dublin:
- Sign off : 6/6/2019
- JIRA ticket reviews: “project = "Application Controller" AND fixVersion = "Dublin Release" AND status != closed AND status != Delivered”
- El Alto:
- ODL SR2 update
- Cleaning Backlog JIRA
- Cleaning Security JIRA: “assignee = Takamune_Cho AND status != Closed AND status != Delivered” check OJSI ticket
- Planning:
- Frankfurt:
- Microservice
- Planning:
5/29/2019 - APPC Project Weekly Minute
Participants:Takamune Cho, Patrick Brady, Lathishbabu Ganesan Jeff Hartley
Agenda
- Dublin R4 release
- El Alto R5 release
- Frankfurt R6 release
Action item
- TSC/PTL meeting updates:
- Release signoff 6/6/2019
- New schedule for R5 and R6: https://wiki.onap.org/display/DW/TSC+2019-04-11?preview=/60886752/60891211/2019-04-09%20ONAP%20Cadence%20Release_V4.pptx
- Dublin:
- Sign off : 6/6/2019 (postpone?)
- JIRA ticket reviews: “project = "Application Controller" AND fixVersion = "Dublin Release" AND status != closed AND status != Delivered”
- El Alto:
- ODL SR2 update
- Cleaning Backlog JIRA:
- Cleaning Security JIRA: “assignee = Takamune_Cho AND status != Closed AND status != Delivered” check OJSI ticket
- Planning:
- Frankfurt:
- Microservice
- Planning:
Discussion:
Jira Legacy | ||||||
---|---|---|---|---|---|---|
|