Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Added meeting recording

...

2020 Modeling Subcommittee Recordings


Duration 60 minutes


DurationAgenda ItemRequested byNotes / Links

START RECORDING:

 15

Co-chair

Jira Legacy
serverSystem Jira
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176
keyONAPMODEL-3

1) Email Polls



2) PNF Software Version  (Fei Zhang (Ericsson) ) (Come back until end of Frankfurt release)

      Slides describing the proposal available for comments: ONAP Non-MANO Artifacts Set Identifiers_PA3.pptx (Michela Bevilacqua)

Action item: Michela Bevilacqua will connect with VNFRQS PTL to build lifetime readthedoc. Jira is created for VNFRQS.

UPDATE: Updated Wiki Page, JIRA to update requirements. Ready for ETSI to review. For all non-MANO artifacts.

Action: Initiate ETSI review.

3)  Modeling current activity status.

Provide the dash board of current status and how to involve:

See: Modeling Current Activity Status

4)  How to proceed future DM discussion?

  • Conclusion: SDC and Modeling subcommittee review and approve it together, (perhaps use SDC features meeting or Modeling Subcommittee meeting, with additional modeling breakouts if needed).
    • Engage Use Case teams for Frankfurt updates and Guilin data model requirements Benjamin Cheung
    • Any updates?
    • Need Use Case teams to update Modeling Requirements page
    • Reach out to Ofir Sonsinoto identify any model updates. (existing modeling of SDC, any updates to the model) to attend May 13 call.

5) R7 Guilin Architecture Review (template) - functional requirements

6) Review procedure:

6.1:  ONAP R7 Modeling High Level Requirements

6.2:  Use case guidance from Modeling subcommittee

Ref:Guilin (R7) - Use Cases (and Requirements in Use Cases)

Action item: encourage to review and comment

  Benjam will help to arrange modeling present in use case group on May 13th.

7) Proposal on how to describe and document relationships in ONAP Info Model Jacqueline Beaulac [Ericsson] Michela Bevilacqua

5

Action review:

ACTION: Discuss any potential new modeling requirements for Guilin release. Yes, create one.

ACTION: create modeling subcommittee requirement (Is there a specific requirement activity, perhaps related to on-boarding of SOL001 VNFs) Guilin (R7) - Use Cases (and Requirements in Use Cases).

ACTION: Fred will create R7 requirement.

Discussing under Arch Task Force 1 meeting. weekly Monday's at 8:00am eastern (12:00 UTC)

We could also use the Resource IM call at 9:00am eastern

Fred will update Modeling subcommittee on activity.

 30 Review use case processBenjamin Cheung

Use case guidance from Modeling subcommittee

 Proposed ONAP Release Process Updates for Information and Data Modeling

 5

Jira Legacy
serverSystem Jira
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176
keyONAPMODEL-1

 5

Jira Legacy
serverSystem Jira
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176
keyONAPMODEL-2

Service IM


 5

Jira Legacy
serverSystem Jira
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId4733707d-2057-3a0f-ae5e-4fd8aff50176
keyONAPMODEL-12

AAI Reverse Engineering status


5
GeoLocation Model Update
5API Documentation

Developing ONAP API Documentation

Discuss Proposed Phased activities: (e.g., Minimum 1, 2, & 3 Guilin; 4 & 5 Stretch goals)

1. All components should place externally facing API definitions (e.g. Swagger) in a common path within their Gerrit/Git 

a.Suggested Path: <Component>/docs/api/swagger/

2.Apply ReDoc to Swagger and place HTML in Readthedocs for the release.

3.Apply Minimum (Phase 1+) swagger guidelines

a.Use common insert for Info section template

4.Use embedded markdown for conceptual documentation

5.Apply full swagger guidelines.

Proposed ACTION: Create non-functional requirements for Guilin release:

  1. All components should place externally facing (i.e. interfaces exposed by the ONAP component to either other ONAP components or components external to ONAP) API definitions (e.g. Swagger) in a common path within their Gerrit/Git 
    Suggested Path: <Component>/docs/api/swagger/
  2. Apply ReDoc to Swagger and place HTML in Readthedocs for the release
  3. Apply Minimum (Phase 1+) swagger guidelines

    1. See: Proposed Phase 1+ OpenAPI 2.0 / Swagger Style Guide
    2. Use the common insert for the info section (e.g., license info, contact info, etc): Swagger Insert Sample for Info Section

Progress:


 5 Container model


0310: Introduction of K8S module in MultiVIM project

cFW orchestration demo 

HowToOrchestrateCNF

0324: Invite K8S PoC

Intel_ONAP_k8_work.pdf

CNF Taskforce takes place after Thursday's TSC:  CNF-Taskforce 2020 Recordings

0421: Container Modeling at April Technical Event

ETSI NFV Container Architecture for ONAP v1.pptx

CNTT RA2 for ONAPv2.pptx

CNCF TUG Progress_0421.pdf


Modeling and Use Cases

Proposed ONAP Release Process Updates for Information and Data Modeling

Discuss M3 process

Proposed Functional Template for Use Cases

Need to begin using these Functional Templates for each Use Case. Possibly merge into a single template. Benjamin Cheungis working with the Architecture Subcommittee (Use Case realization effort) to introduce.

See: ONAP Use Case / Requirements Teams Process Way of Working (WoW)

May 13th call with Use Case teams.

April 16th 5G call will also discuss. (11:00 eastern US) https://zoom.us/j/478423919

...